ALAnne Lemnitzer

Anne Lemnitzer

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Anne Lemnitzer has a total of 8 co-authors. Here are the top co-authors by number of shared publications:

  • Eric R. Ahlberg

    Assistant Professor, Dept. of Civil and Environmental Engineering, California State Univ. Fullerton, 800 N. College Blvd., Fullerton, CA 92831

    2 shared publications
  • John W. Wallace

    Assistant Professor, Dept. of Civil and Environmental Engineering, California State Univ. Fullerton, 800 N. College Blvd., Fullerton, CA 92831

    2 shared publications
  • Jonathan P. Stewart

    Assistant Professor, Dept. of Civil and Environmental Engineering, California State Univ. Fullerton, 800 N. College Blvd., Fullerton, CA 92831

    2 shared publications
  • Anoosh Shamsabadi

    Ph.D. Candidate, Civil and Environmental Engineering Dept., Univ. of California, Los Angeles, 5731 Boelter Hall, Los Angeles, CA 90095

    1 shared publication
  • Changsoon Rha

    Assistant Professor, Dept. of Civil and Environmental Engineering, California State Univ. Fullerton, 800 N. College Blvd., Fullerton, CA 92831

    1 shared publication
  • Ertugrul Taciroglu

    Department of Civil and Environmental Engineering University of California Los Angeles California USA

    1 shared publication

Latest Publications

  • Nonlinear Efficiency of Bored Pile Group under Lateral Loading

    by Anne Lemnitzer, Payman Khalili-Tehrani, Eric R. Ahlberg, Changsoon Rha, Ertugrul Taciroglu, John W. Wallace, Jonathan P. Stewart

    A 3×3 bored pile group consisting of nine cast-in-drilled-hole reinforced concrete shafts and a comparable single-shaft were subjected to reversed cyclic, lateral head loading to investigate group interaction effects across a wide range of lateral displacements. The piles had the same diameter of d=0.61 m and similar soil conditions; however, various equipment constraints led to two differences: (1) a fixed head (zero rotation) boundary condition for the single pile versus minor pile cap rotation in the vertical plane for the group and (2) shaft longitudinal reinforcement ratios of 1.8% for the single pile and 1% for the group piles. To enable comparisons between the test results, a calibrated model of the single pile (1.8% reinforcement) was developed and used to simulate the response of a single shaft with 1% reinforcement. Additional simulations of the pile group were performed to evaluate the effects of cap rotation on group response. By comparing the simulated responses for common conditions, i.e., 1...


  • Lateral Performance of Full-Scale Bridge Abutment Wall with Granular Backfill

    by Anne Lemnitzer, Eric R. Ahlberg, Robert L. Nigbor, Anoosh Shamsabadi, John W. Wallace, Jonathan P. Stewart

    Bridge abutments typically contain a backwall element that is designed to break free of its base support when struck by a bridge deck during an earthquake event and push into the abutment backfill soils. Results are presented for a full-scale cyclic lateral load test of an abutment backwall configured to represent the dimensions ( 1.7 m height), boundary conditions, and backfill materials (compacted silty sand) that are typical of California bridge design practice. An innovative loading system was utilized that operates under displacement control and that assures horizontal wall displacement with minimal vertical displacement. The applied horizontal displacement ranged from null to approximately 11% of the wall height (0.11H) . The maximum earth pressure occurred at a wall displacement of 0.03H and corresponded to a passive earth pressure coefficient of Kp =16.3 . The measured force distribution applied to the wall from hydraulic actuators allowed the soil pressure distribution to be inferred as triangula...