Monty Sutrisna
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Monty Sutrisna has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
- Mostafa Babaeian Jelodar
School of Built Environment, Massey University, Auckland, New Zealand
4 shared publications - Wajiha Shahzad
School of Built Environment, Massey University, Auckland 0632, New Zealand
3 shared publications - Sanaz Nesarnobari
Massey University
2 shared publications - An Le
School of Built Environment, Massey University
1 shared publication - Azam Zavvari
Massey University
1 shared publication - Elrasheid Elkhidir
School of Built Environment, Massey University, Auckland 0632, New Zealand
1 shared publication
Latest Publications
- 2 July 2025
- Published by Springer Nature
- p. 335-348
Evaluating the Use of Artificial Neural Networks for Capacity Forecasting in the Construction Industry
- 2 July 2025
- Published by Springer Nature
- p. 335-348
Evaluating the Use of Artificial Neural Networks for Capacity Forecasting in the Construction Industry
- 2 July 2025
- Published by Springer Nature
- p. 319-333
Adoption of Data Visualization and Analytics Environments in High-Level Construction Portfolio Management
- 2 July 2025
- Published by Springer Nature
- p. 319-333
Adoption of Data Visualization and Analytics Environments in High-Level Construction Portfolio Management
- 2 July 2025
- Published by Springer Nature
- p. 83-95
Impact of Covid-19 on Supply Chain Management of the Offsite Construction (OSC) Sector in New Zealand
- 2 July 2025
- Published by Springer Nature
- p. 83-95
Impact of Covid-19 on Supply Chain Management of the Offsite Construction (OSC) Sector in New Zealand
- 16 May 2025
- Published by Springer Nature
- p. 143-158
A Prediction Model for the Future Construction Demands of the Education Sector in the Auckland Region
- 16 May 2025
- Published by Springer Nature
- p. 143-158
A Prediction Model for the Future Construction Demands of the Education Sector in the Auckland Region
- 20 April 2025
- Published by Springer Nature
- p. 160-169
A Review on Lean Principles in Offsite Construction (OSC) Manufacturing Stage: Perspectives from New Zealand
- 20 April 2025
- Published by Springer Nature
- p. 160-169
A Review on Lean Principles in Offsite Construction (OSC) Manufacturing Stage: Perspectives from New Zealand
- 14 February 2024
- Published by Taylor & Francis
- p. 350-370
Unlocking the Full Potential of Offsite Construction by Optimising its Procurement and Delivery
Deciding on an optimal procurement route for a construction project is pivotal to its success. Different procurement routes have been tried and tested, ranging from traditional to collaborative styles. Some procurement routes may be better suited or even designed for special needs, clients, and construction projects or specific project contexts. The development of innovative upstream procurement strategies grew in parallel with the advancement of various downstream delivery approaches/options for construction projects. This includes adaptation of philosophies and techniques from other industries, such as manufacturing and oil and gas. A notable innovation stemming from offsite construction (OSC) techniques involves relocating a considerable portion of conventional on-site tasks to a controlled setting. This move primarily aims to diminish risks and waste, enhancing safety, productivity, and quality while also catering to the post-COVID requirement of minimising on-site activities. However, previous research reported several challenges facing the procurement and delivery of offsite construction projects, like fragmented supply chains, lack of adequate higher-level skills, and a compliance framework suited to conventional practices. Furthermore, higher production costs, early design freeze, and standardised designs could disadvantage the clients. Overcoming such challenges in OSC is thus critical to utilising its full potential. This chapter describes the model development to optimise procurement and delivery of OSC projects. Initially based on a focused literature review, the model was built utilising genetic algorithm (GA) techniques to tackle multi-objective OSC problems. Thereafter, a New Zealand–based case study was conducted to demonstrate and verify the proposed model, focusing on manufacturing and transportation as the more critical stages of OSC delivery. Findings reported here are expected to guide industry practitioners towards optimised procurement and delivery of OSC. The chapter also contributes to further development of the overall OSC body of knowledge and construction management in general, given the accelerating trends towards offsite manufacturing for construction.
- 14 February 2024
- Published by Taylor & Francis
- p. 350-370
Unlocking the Full Potential of Offsite Construction by Optimising its Procurement and Delivery
Deciding on an optimal procurement route for a construction project is pivotal to its success. Different procurement routes have been tried and tested, ranging from traditional to collaborative styles. Some procurement routes may be better suited or even designed for special needs, clients, and construction projects or specific project contexts. The development of innovative upstream procurement strategies grew in parallel with the advancement of various downstream delivery approaches/options for construction projects. This includes adaptation of philosophies and techniques from other industries, such as manufacturing and oil and gas. A notable innovation stemming from offsite construction (OSC) techniques involves relocating a considerable portion of conventional on-site tasks to a controlled setting. This move primarily aims to diminish risks and waste, enhancing safety, productivity, and quality while also catering to the post-COVID requirement of minimising on-site activities. However, previous research reported several challenges facing the procurement and delivery of offsite construction projects, like fragmented supply chains, lack of adequate higher-level skills, and a compliance framework suited to conventional practices. Furthermore, higher production costs, early design freeze, and standardised designs could disadvantage the clients. Overcoming such challenges in OSC is thus critical to utilising its full potential. This chapter describes the model development to optimise procurement and delivery of OSC projects. Initially based on a focused literature review, the model was built utilising genetic algorithm (GA) techniques to tackle multi-objective OSC problems. Thereafter, a New Zealand–based case study was conducted to demonstrate and verify the proposed model, focusing on manufacturing and transportation as the more critical stages of OSC delivery. Findings reported here are expected to guide industry practitioners towards optimised procurement and delivery of OSC. The chapter also contributes to further development of the overall OSC body of knowledge and construction management in general, given the accelerating trends towards offsite manufacturing for construction.
- 23 January 2023
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 31 (6) , 2513-2535
Project cost control system and enabling-factors model: PLS-SEM approach and importance-performance map analysis
Purpose: This paper reports the developments of a project cost control system (PCCS) for construction projects to (1) measure its current level of cost control maturity, (2) examine the relationships between elements within PCCS processes and (3) identify improvement areas.Design/methodology/approach: This study adopts a mixed approach of descriptive analysis and partial least squares structural equation modelling (PLS-SEM) to measure the current maturity level of PCCS and evaluate the relationships between elements within PCSS to identify improvement areas. Further importance-performance matrix analysis (IPMA) of priority constructs was conducted to improve a target construct and identify the most important areas of specific actions at indicator levels. The results of IPMA revealed the contrast that has the greatest importance on the performance of others so that the recommendations can be made accordingly. Data collected in New Zealand were used to develop the research model.Findings: This study develops structural and measurement models with the constructs including pre-control, in-control and post-control processes, enablers and their proposed interrelationships. Then, data from survey of 184 experienced project cost control team members reveal that post-control has the lowest maturity or weakest areas in the PCCS. Data analysis facilitated by PLS-SEM confirmed that all the constructs in the structural model have positive and significant relationships with each other and suggested that systematic cost analysis reports, communication, skills and experience, defining roles and responsibilities, and top management's support should be the highest priority for improving the PCCS in a more effective manner.Originality/value: This study presents one of the earliest attempts to develop and test an integrated model that links sub-processes in PCCS and their enablers. Secondly, this research adds to the construction project management literature by empirically verifying the roles of enablers in enhancing maturity level of PCCS.
- 23 January 2023
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 31 (6) , 2513-2535
Project cost control system and enabling-factors model: PLS-SEM approach and importance-performance map analysis
Purpose: This paper reports the developments of a project cost control system (PCCS) for construction projects to (1) measure its current level of cost control maturity, (2) examine the relationships between elements within PCCS processes and (3) identify improvement areas.Design/methodology/approach: This study adopts a mixed approach of descriptive analysis and partial least squares structural equation modelling (PLS-SEM) to measure the current maturity level of PCCS and evaluate the relationships between elements within PCSS to identify improvement areas. Further importance-performance matrix analysis (IPMA) of priority constructs was conducted to improve a target construct and identify the most important areas of specific actions at indicator levels. The results of IPMA revealed the contrast that has the greatest importance on the performance of others so that the recommendations can be made accordingly. Data collected in New Zealand were used to develop the research model.Findings: This study develops structural and measurement models with the constructs including pre-control, in-control and post-control processes, enablers and their proposed interrelationships. Then, data from survey of 184 experienced project cost control team members reveal that post-control has the lowest maturity or weakest areas in the PCCS. Data analysis facilitated by PLS-SEM confirmed that all the constructs in the structural model have positive and significant relationships with each other and suggested that systematic cost analysis reports, communication, skills and experience, defining roles and responsibilities, and top management's support should be the highest priority for improving the PCCS in a more effective manner.Originality/value: This study presents one of the earliest attempts to develop and test an integrated model that links sub-processes in PCCS and their enablers. Secondly, this research adds to the construction project management literature by empirically verifying the roles of enablers in enhancing maturity level of PCCS.