Fanlin Ling
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Fanlin Ling has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
Fuquan Ji
1 shared publicationHaisheng Yang
1 shared publicationJiazheng Zhong
School of Civil Engineering, Central South University, Changsha, China
1 shared publication- Junlong Shang
Department of Civil Engineering and Management, School of Engineering, The University of Manchester, Manchester, UK
1 shared publication Peishuai Chen
1 shared publication- Pengfei Liu
CCCC Second Harbor Engineering Company Ltd., Wuhan, Hubei, 430012, China
1 shared publication
Latest Publications
- Open Access
- 1 January 2026
- Published by Wiley in Advances in Civil Engineering
- Vol. 2026 (1)
Intelligent Construction for Open‐Cut Tunnel: Insight From Mobile On‐Site Factory Method (MOFM)
Conventional open‐cut tunnel construction is often characterized by low levels of automation, poor interprocess coordination, and limited overall efficiency. To address these challenges, this study introduces the integrated mobile on‐site factory method (MOFM), applied in Section 6 of the Xiong’an underground segment of the Xiong’an‐Xinzhou High‐Speed Railway in China. MOFM aims to intelligentize the entire open‐cut tunnel construction workflow by deploying a mobile factory system encompassing key stages such as steel bar binding, concrete formwork placement, vibration, and curing. Several innovative technologies have been developed and implemented, including microload balancing conversion for lining reinforcement systems, precise control of high‐performance concrete, and an integrated intelligent collaborative control system. Field applications demonstrate substantial performance gains: MOFM reduces the curing age difference between the lining and invert concrete by 16 days, accelerates early strength development by 40%, enhances concrete forming efficiency by 50%, and decreases human–machine input by 30%. Moreover, the construction duration per tunnel formwork is reduced by 1.5 days, yielding a 24% improvement in overall construction efficiency. These improvements demonstrate that MOFM not only enhances construction productivity and quality control but also promotes the transformation of conventional open‐cut tunnel construction toward intelligent, industrialized, and sustainable practices. The results highlight MOFM as a scalable and replicable model for intelligent construction in large‐scale urban infrastructure projects.
- 1 January 2026
- Published by Wiley in Advances in Civil Engineering
- Vol. 2026 (1)
Open AccessIntelligent Construction for Open‐Cut Tunnel: Insight From Mobile On‐Site Factory Method (MOFM)
Conventional open‐cut tunnel construction is often characterized by low levels of automation, poor interprocess coordination, and limited overall efficiency. To address these challenges, this study introduces the integrated mobile on‐site factory method (MOFM), applied in Section 6 of the Xiong’an underground segment of the Xiong’an‐Xinzhou High‐Speed Railway in China. MOFM aims to intelligentize the entire open‐cut tunnel construction workflow by deploying a mobile factory system encompassing key stages such as steel bar binding, concrete formwork placement, vibration, and curing. Several innovative technologies have been developed and implemented, including microload balancing conversion for lining reinforcement systems, precise control of high‐performance concrete, and an integrated intelligent collaborative control system. Field applications demonstrate substantial performance gains: MOFM reduces the curing age difference between the lining and invert concrete by 16 days, accelerates early strength development by 40%, enhances concrete forming efficiency by 50%, and decreases human–machine input by 30%. Moreover, the construction duration per tunnel formwork is reduced by 1.5 days, yielding a 24% improvement in overall construction efficiency. These improvements demonstrate that MOFM not only enhances construction productivity and quality control but also promotes the transformation of conventional open‐cut tunnel construction toward intelligent, industrialized, and sustainable practices. The results highlight MOFM as a scalable and replicable model for intelligent construction in large‐scale urban infrastructure projects.
- 1 January 2025
- Published by Canadian Science Publishing in Canadian Geotechnical Journal
- Vol. 62, 1-14
Effect of water pressure on time-dependent permeability characteristics of sand conditioned with foam and bentonite slurry
During earth pressure balance shield tunnelling in water-rich sandy ground, both foam and other conditioning agents, such as bentonite slurry, are injected to prevent water spewing. Permeability tests were conducted to investigate how water pressure affects the permeability of sand conditioned with foam and bentonite slurry. Experimental results demonstrate that increasing water pressure at the top and bottom of the specimen extends the initial stable period of the permeability coefficient, significantly slowing down its growth rate during the fast growth period. Soil grain migration was observed in specimens exposed to sufficiently high water pressure. During the slow growth period, the permeability coefficient decreased as water pressure increased, and this decrease rate correspondingly decreased. Under a consistent hydraulic gradient, increased water pressure led to enhanced stability of foam bubbles and extended the time-dependent curves for the permeability coefficient. Furthermore, the relationship between chamber pressure dissipation and foam stability was discussed during the standstill period of shield machines. To prevent water spewing, it is recommended to use the permeability coefficient of the muck at the outlet of the screw conveyor with the lowest water pressure as the evaluation index during permeability testing.
- 1 January 2025
- Published by Canadian Science Publishing in Canadian Geotechnical Journal
- Vol. 62, 1-14
Effect of water pressure on time-dependent permeability characteristics of sand conditioned with foam and bentonite slurry
During earth pressure balance shield tunnelling in water-rich sandy ground, both foam and other conditioning agents, such as bentonite slurry, are injected to prevent water spewing. Permeability tests were conducted to investigate how water pressure affects the permeability of sand conditioned with foam and bentonite slurry. Experimental results demonstrate that increasing water pressure at the top and bottom of the specimen extends the initial stable period of the permeability coefficient, significantly slowing down its growth rate during the fast growth period. Soil grain migration was observed in specimens exposed to sufficiently high water pressure. During the slow growth period, the permeability coefficient decreased as water pressure increased, and this decrease rate correspondingly decreased. Under a consistent hydraulic gradient, increased water pressure led to enhanced stability of foam bubbles and extended the time-dependent curves for the permeability coefficient. Furthermore, the relationship between chamber pressure dissipation and foam stability was discussed during the standstill period of shield machines. To prevent water spewing, it is recommended to use the permeability coefficient of the muck at the outlet of the screw conveyor with the lowest water pressure as the evaluation index during permeability testing.
- Open Access
- 15 February 2024
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 28 (5) , 2053-2065
A Novel Calculation Model for the Permeability Coefficient of Soils Conditioned with Foam and Bentonite Slurry
- 15 February 2024
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 28 (5) , 2053-2065
Open AccessA Novel Calculation Model for the Permeability Coefficient of Soils Conditioned with Foam and Bentonite Slurry