Pedro Carvas
Research Subjects
Research Interests
Pedro Carvas has a total of 79 co-authors. Here are the top co-authors by number of shared publications:
- Alessandro Bonito-Oliva
Fusion for Energy, Barcelona, Spain
4 shared publications - Monica Martinez Lopez
Fusion For Energy, Cadarache, France
4 shared publications - Neil Mitchell
ITER Organization, St. Paul Lez Durance, France
3 shared publications - Pierre Gavouyere-Lasserre
Fusion for Energy, Barcelona, Spain
3 shared publications A. Loizaga
Fusion For Energy, Cadarache, France
2 shared publications- Ander Loizaga
Fusion for Energy, Barcelona, Spain
2 shared publications
Latest Publications
- 15 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
Delivered Poloidal Field Coils to ITER Fusion Tokamak Facility: Status, Factory Acceptance Test Results and Overview of the Undergone Electrical Tests in Manufacturing Processes
Fusion for Energy (F4E), the European Domestic Agency for the International Thermonuclear Experimental Reactor (ITER) is responsible for the manufacturing, test and delivery of 5 out of 6 Poloidal Field Coils of ITER. F4E has currently delivered 4 coils: PF2, PF4, PF5 and PF6, the last two are installed in the Tokamak pit in temporary positions while PF2 and PF4 are stored awaiting the Tokamak torus completion. At the PF coils manufacturing production site in Cadarache, France, few meters away from the ITER Tokamak assembly building, F4E is currently finalizing the manufacturing and testing of the largest coil: PF3, with 24 m diameter and a weight of 384 t, approaching to the end of an endeavor that started back in 2013. This article describes all electrical tests the PF coils underwent to meet the ITER technical requirements during their lengthy manufacturing process, and which lasted several years. Tests performed at key points of the manufacturing process avoided discovering non-conformities at later stages that could otherwise become critical for the project accomplition. The main electrical tests consisted of high voltage DC/AC, partial discharge tests, and local and global Paschen tests. The experimental setups and procedures are presented and discussed in more detail. We also summarize the acceptance test results for the finalized coils i.e., 80 K forced flow pressure drop testing, leak tightness in vacuum before, during and after the thermal cycle to 80 K.
- 15 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
Delivered Poloidal Field Coils to ITER Fusion Tokamak Facility: Status, Factory Acceptance Test Results and Overview of the Undergone Electrical Tests in Manufacturing Processes
Fusion for Energy (F4E), the European Domestic Agency for the International Thermonuclear Experimental Reactor (ITER) is responsible for the manufacturing, test and delivery of 5 out of 6 Poloidal Field Coils of ITER. F4E has currently delivered 4 coils: PF2, PF4, PF5 and PF6, the last two are installed in the Tokamak pit in temporary positions while PF2 and PF4 are stored awaiting the Tokamak torus completion. At the PF coils manufacturing production site in Cadarache, France, few meters away from the ITER Tokamak assembly building, F4E is currently finalizing the manufacturing and testing of the largest coil: PF3, with 24 m diameter and a weight of 384 t, approaching to the end of an endeavor that started back in 2013. This article describes all electrical tests the PF coils underwent to meet the ITER technical requirements during their lengthy manufacturing process, and which lasted several years. Tests performed at key points of the manufacturing process avoided discovering non-conformities at later stages that could otherwise become critical for the project accomplition. The main electrical tests consisted of high voltage DC/AC, partial discharge tests, and local and global Paschen tests. The experimental setups and procedures are presented and discussed in more detail. We also summarize the acceptance test results for the finalized coils i.e., 80 K forced flow pressure drop testing, leak tightness in vacuum before, during and after the thermal cycle to 80 K.
- 6 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
End of the Winding of the European Poloidal Field Coils for the ITER Project
Fusion for Energy is delivering 5 out of 6 ITER superconducting poloidal field coils (PF coils), which are composed of stacks of 6 to 8 double-layered circular coils - double pancakes (DPs). The double pancakes range from 17 m to 24 m in diameter and the wound conductor has a NbTi core inside a stainless steel squared jacked. Due to the size of the PF 2-4 coils, they have been manufactured on the ITER site, very close to the assembly hall. This article highlights the manufacturing processes, the learning curve, the main challenges and learned lessons during the winding activities of the 30 double pancakes that comprise 4 PF coils.
- 6 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
End of the Winding of the European Poloidal Field Coils for the ITER Project
Fusion for Energy is delivering 5 out of 6 ITER superconducting poloidal field coils (PF coils), which are composed of stacks of 6 to 8 double-layered circular coils - double pancakes (DPs). The double pancakes range from 17 m to 24 m in diameter and the wound conductor has a NbTi core inside a stainless steel squared jacked. Due to the size of the PF 2-4 coils, they have been manufactured on the ITER site, very close to the assembly hall. This article highlights the manufacturing processes, the learning curve, the main challenges and learned lessons during the winding activities of the 30 double pancakes that comprise 4 PF coils.
- 7 February 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 32 (6) , 1-5
Factory Acceptance Test and Delivery of the First Two Poloidal Field Coils to ITER Fusion Facility
Fusion for Energy (F4E), the European Domestic Agency for the International Thermonuclear Experimental Reactor (ITER), is responsible for the supply of 5 out of the 6 Poloidal Field (PF) Coils: PF2-PF6. One coil, PF1, is being manufactured by the Russian Federation Domestic Agency (RFDA). While the 10 m diameter PF6 was manufactured by the Institute of Plasma Physics Chinese Academy of Sciences (ASIPP) and tested in the cold test facility at Cadarache under a collaboration agreement with F4E; coils PF2-PF5 are currently being manufactured on site, close to the Tokamak building, their size ranging from 17 to 24 m diameter and weights from 200 to 400 T. This article describes the final acceptance tests performed on the coils PF5 and PF6, the testing setup, paying special attention to the tests performed before, after and during the cool-down at 80 K. The tests cover a wide range of aspects of the operation at cryogenic temperatures: ranging from the high voltage electrical insulation performance during the potential fault conditions during plasma operation, leak tightness under vacuum and pressure drop behavior of its hydraulic system during operation with forced flow helium. In addition, we will briefly introduce the results for the current center line (CCL) calculation obtained for PF5 and PF6.
- 7 February 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 32 (6) , 1-5
Factory Acceptance Test and Delivery of the First Two Poloidal Field Coils to ITER Fusion Facility
Fusion for Energy (F4E), the European Domestic Agency for the International Thermonuclear Experimental Reactor (ITER), is responsible for the supply of 5 out of the 6 Poloidal Field (PF) Coils: PF2-PF6. One coil, PF1, is being manufactured by the Russian Federation Domestic Agency (RFDA). While the 10 m diameter PF6 was manufactured by the Institute of Plasma Physics Chinese Academy of Sciences (ASIPP) and tested in the cold test facility at Cadarache under a collaboration agreement with F4E; coils PF2-PF5 are currently being manufactured on site, close to the Tokamak building, their size ranging from 17 to 24 m diameter and weights from 200 to 400 T. This article describes the final acceptance tests performed on the coils PF5 and PF6, the testing setup, paying special attention to the tests performed before, after and during the cool-down at 80 K. The tests cover a wide range of aspects of the operation at cryogenic temperatures: ranging from the high voltage electrical insulation performance during the potential fault conditions during plasma operation, leak tightness under vacuum and pressure drop behavior of its hydraulic system during operation with forced flow helium. In addition, we will briefly introduce the results for the current center line (CCL) calculation obtained for PF5 and PF6.
- 31 March 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 30 (4) , 1-13
Toward Completion and Delivery of the First EU ITER Magnets
The plasma confinement of the International Tokamak Experimental Rector (ITER) is provided by the magnetic field generated by 18 toroidal field (TF) coils while 6 poloidal field (PF) and 6 central solenoid coils have the function to drive, shape and pre-heat the plasma. Fusion for Energy (F4E), the European Domestic Agency for ITER, is responsible for the supply of 10 TF coils and 5 PF coils to the ITER project. The ITER Organization (IO) team is instead responsible for the design of such coils as well for the coordination of the activities of the different Domestic Agencies (DAs) producing the different components, and their assembly into the Tokamak. The PF coils utilize NbTi Cable-in-Conduit-Conductor and have different diameters between 8 and 24 meters and weights of up to 400 tons. Regarding the PF coils produced by F4E, so far one has been completed by the Institute of Plasma Physics Chinese Academy of Sciences (ASIPP) under a collaboration agreement with F4E. The other 4 PF coils are being produced at the ITER site in Saint Paul lez Durance, France, under F4E supervision. The first of these (PF5) will be completed by July 2020 while the last coil (PF3) will be ready be the end of 2023. The TF coils utilize Nb $_3$ Sn conductor and are manufactured with the “Wind, React & Transfer” method. The first TF coil is close to completion and will be delivered to the ITER site in early 2020. Subsequent TF coils will follow at a rate of about one every 3-4 months. In this article we will report on the production status of both PF and TF coils and, in particular, the different manufacturing strategies employed. The main challenges faced so far and the results obtained are also described.- 31 March 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 30 (4) , 1-13
Toward Completion and Delivery of the First EU ITER Magnets
The plasma confinement of the International Tokamak Experimental Rector (ITER) is provided by the magnetic field generated by 18 toroidal field (TF) coils while 6 poloidal field (PF) and 6 central solenoid coils have the function to drive, shape and pre-heat the plasma. Fusion for Energy (F4E), the European Domestic Agency for ITER, is responsible for the supply of 10 TF coils and 5 PF coils to the ITER project. The ITER Organization (IO) team is instead responsible for the design of such coils as well for the coordination of the activities of the different Domestic Agencies (DAs) producing the different components, and their assembly into the Tokamak. The PF coils utilize NbTi Cable-in-Conduit-Conductor and have different diameters between 8 and 24 meters and weights of up to 400 tons. Regarding the PF coils produced by F4E, so far one has been completed by the Institute of Plasma Physics Chinese Academy of Sciences (ASIPP) under a collaboration agreement with F4E. The other 4 PF coils are being produced at the ITER site in Saint Paul lez Durance, France, under F4E supervision. The first of these (PF5) will be completed by July 2020 while the last coil (PF3) will be ready be the end of 2023. The TF coils utilize Nb $_3$ Sn conductor and are manufactured with the “Wind, React & Transfer” method. The first TF coil is close to completion and will be delivered to the ITER site in early 2020. Subsequent TF coils will follow at a rate of about one every 3-4 months. In this article we will report on the production status of both PF and TF coils and, in particular, the different manufacturing strategies employed. The main challenges faced so far and the results obtained are also described.