AVAli Vaezi

Ali Vaezi

*This is an algorithmically generated author record based on publicly available information.

Ali Vaezi has a total of 7 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    A Stochastic User Equilibrium Model for Multimodal Transportation in Tehran: A Behavioural Game-Theoretic Analysis

    by Ali Vaezi, Sahand Alitanlo, Amirhossein Naghedi Ahmadi

    Multimodal transportation modeling lacks a framework that embeds hierarchical mode choice under endogenous congestion within a game of incomplete information over travellers' preferences. Existing Bayesian routing games treat the private type as a signal about the uncertain network state; we instead treat it as the commuter's income-driven value of time. We develop a Nested-Logit Stochastic User Equilibrium (NL-SUE) formulated as a non-atomic Bayesian game in which income is a private Harsanyi type.The model couples a two-nest logit structure, private (Car, Taxi, Motorcycle) and public (Carpool, Metro, BRT), with a variational inequality representation. We prove existence and uniqueness constructively, under a sufficient condition, by reducing it to a scalar fixed point in aggregate road demand whose monotonicity follows from the structural decoupling of grade-separated transit. Because the equilibrium surplus is convex in value of time, preference heterogeneity strictly raises welfare: the value-of-time prior is a behavioural primitive, not reducible to its mean. A two-stage calibration to Tehran Statistical Yearbook 1402 data reproduces the observed six-mode split within 2.3 percentage points.Four policy experiments show that welfare incidence is structurally determined by nest architecture and congestion feedback, not instrument size. Fuel taxation is less effective and more regressive than BRT priority enforcement; this pattern follows from private-nest congestion dynamics and is expected in cities with similar modal hierarchies. Sensitivity analysis identifies the logit scale as the dominant behavioural parameter, generating a 33.4 percentage-point range in car share.The methodology transfers to cities with aggregate mode shares and income strata.

  • Open Access

    Remaining Useful Life Assessment for Remanufacturing Decisions: Reproduction of Hu et al. (2014) and Validation on the XJTU-SY Run-to-Failure Bearing Dataset

    by Ali Vaezi, Mehrdad Mohammadi, Amin Najafqolian

    Hu, Liu, Lu and Zhang (2014) proposed a method that predicts the vibration level of a rolling bearing with support vector regression (SVR), converts the prediction into a reliability value, and uses that reliability to choose one of three end-of-life actions: reuse, remanufacture, or recycle. The original paper did not publish code or the exact data segment it used. During this internship the method was first rebuilt from scratch in Python, with every equation traced back to the paper and verified by unit tests. It was then reproduced on the same data family the paper used (the IMS bearing dataset) and, as the final step, tested on an independent dataset that the paper never used: the XJTU-SY run-to-failure bearing dataset. Three sets of results are compared side by side in this report: the numbers published in the paper, our reproduction on IMS, and our validation on XJTU-SY. On IMS the reproduction matches the paper: the prediction error stays inside the 2 to 10 percent band the paper reports, and the decision sequence (reuse, then remanufacture, then recycle) is identical. On XJTU-SY the outcome depends strongly on which of the paper's two forecasting variants is used. The simplified variant, a single SVR on the denoised signal, fails with a mean absolute error of 28.4 percent, because XJTU-SY bearings degrade very fast and the SVR cannot predict values far outside its training range. The paper's full variant, one SVR per wavelet sub-band, stays close to the published error band with a mean absolute error of 10.0 percent, and reaches 1.6 to 8.9 percent on six of the ten usable bearings. In addition, on most XJTU-SY bearings the decision sequence skips the remanufacture step completely, because the reliability drops from high to low in only two or three monitoring steps. These results show under which conditions the 2014 method works and where it breaks down.