He Bai has a total of 23 co-authors. Here are the top co-authors by number of shared publications:
Chunjiang Bai
1 shared publicationGuanghong Ju
Northwest Engineering Corporation Limited, Power China, Xi’an, China
1 shared publicationGuanghui Miao
1 shared publication- Huan Wei
National Key Laboratory of Science and Technology on Space Microwave, China Academy of Space Technology, Xian, China
1 shared publication Jing Yang
1 shared publication- Jinrong Bao
School of Chemistry and Chemical Engineering, Inner Mongolia University, Hohhot 010021, China
1 shared publication
Latest Publications
- 6 November 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1463-1470
Study on simulation method of prestressed anchor cable reinforcement for large toppling slopes
The construction of prestressed anchor cables is an effective means to improve the stability of slopes. Revealing its reinforcement mechanism has important theoretical significance for guiding the design of slope supports. Based on the reinforcement characteristics, anchoring process and failure modes of prestressed anchor cables, this paper proposes a simulation method of the cables in combination with discrete elements. This approach can truly reflect the interaction between mortar, anchor cable and rock mass in the anchorage section, and it can also reflect the existence of anchor piers. Taking the left bank slope of Delsi Hydropower Station as a research object, and aiming at the deformation and failure characteristics of deep flexural toppling, the design principle of prestressed anchor cable reinforcement for large toppling masses is put forward. The stress of anchor cables and the deformation of the slope under the conditions of different support strength, reinforcement position and construction time are analyzed. The reinforcement effect of prestressed anchor cables and the influence on slope stability of each scheme are evaluated. Finally, for high rock slopes that are prone to toppling instability, prevention suggestions are provided during excavation and reinforcement.
- 6 November 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1463-1470
Study on simulation method of prestressed anchor cable reinforcement for large toppling slopes
The construction of prestressed anchor cables is an effective means to improve the stability of slopes. Revealing its reinforcement mechanism has important theoretical significance for guiding the design of slope supports. Based on the reinforcement characteristics, anchoring process and failure modes of prestressed anchor cables, this paper proposes a simulation method of the cables in combination with discrete elements. This approach can truly reflect the interaction between mortar, anchor cable and rock mass in the anchorage section, and it can also reflect the existence of anchor piers. Taking the left bank slope of Delsi Hydropower Station as a research object, and aiming at the deformation and failure characteristics of deep flexural toppling, the design principle of prestressed anchor cable reinforcement for large toppling masses is put forward. The stress of anchor cables and the deformation of the slope under the conditions of different support strength, reinforcement position and construction time are analyzed. The reinforcement effect of prestressed anchor cables and the influence on slope stability of each scheme are evaluated. Finally, for high rock slopes that are prone to toppling instability, prevention suggestions are provided during excavation and reinforcement.