Nail Zamaliyev
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Nail Zamaliyev has a total of 21 co-authors. Here are the top co-authors by number of shared publications:
- Denis Akhmatnurov
Abylkas Saginov Karaganda Technical University
6 shared publications - Nikita Ganyukov
Abylkas Saginov Karaganda Technical University
6 shared publications - R. A. Mussin
Abylkas Saginov Karaganda Technical University
6 shared publications - Krzysztof Skrzypkowski
Faculty of Civil Engineering and Resource Management, AGH University of Krakow, Mickiewicza 30 Av., 30-059 Krakow, Poland
5 shared publications - Jerzy Stasica
Faculty of Civil Engineering and Resource Management, AGH University of Krakow, 30-059 Kraków, Poland
4 shared publications - Krzysztof Zagórski
Faculty of Mechanical Engineering and Robotics, AGH University of Krakow, Mickiewicza 30 Av., 30-059 Krakow, Poland
3 shared publications
Latest Publications
- Open Access
Assessment of Strength Characteristics and Structural Heterogeneity of Coal Seams in the Karaganda Basin by Geophysical Methods for Enhancing Mining Safety
The principal difficulty in studying the physico-mechanical and filtration-capacity properties of coals and host rocks under laboratory conditions using core samples lies in reproducing natural thermodynamic conditions characteristic of in situ depths. To address this issue, specialized equipment and methodologies for transferring measurement results are employed, including the Hoek–Brown failure criterion, the structural weakening coefficient, and the development of thermodynamic models. The reliability and accuracy of such measurements are determined by the degree of conformity between the adopted laboratory conditions and natural in situ conditions, the number of samples representing different lithological varieties, and the adequacy of sampling procedures ensuring representativeness. Particular challenges arise when sampling cleated and fractured coals formed under natural stress–strain conditions and contain methane, which significantly influences their physical properties. These difficulties are especially pronounced in prepared-for-mining high-gas-content coal seams of the Karaganda Basin at depths of approximately 700 m, where obtaining representative samples is technically complicated. Reliable values of the physico-mechanical properties of the coal–rock mass are essential for geomechanical calculations aimed at ensuring safe mining of high-gas-content seams through risk assessment of geodynamic phenomena, particularly in zones of geological disturbances, floor heave, and roof collapse. In this context, the use of a comprehensive suite of geophysical logging data from exploration boreholes makes it possible to obtain continuous, high-precision information on physico-mechanical and filtration-capacity properties. These methods are particularly important for characterizing the coal–rock mass in operating mines, since the natural state of host rocks and prepared coal seams is altered due to stress relief caused by mine workings, preliminary degasification measures, and hydraulic fracturing. The problem addressed is the need for reliable assessment of rock and coal seam parameters under natural thermodynamic stress–strain conditions, taking into account lithological composition, structural heterogeneity, fracture development, stratigraphic differentiation, and gas saturation. The aim of this study is to ensure efficient and safe coal extraction based on geomechanical calculations utilizing physico-mechanical and filtration-capacity properties of host rocks and gas-bearing coal seams, whether prepared for mining or not yet extracted. The research methods are based on an integrated complex of geophysical logging of exploration wells, specialized software tools, and statistical processing techniques to identify patterns in physico-mechanical and filtration-capacity properties of host rocks and coal seams under natural stress–strain conditions, as well as to determine the nature of changes in these properties within coal seams and roof and floor rocks in prepared mining areas. The physico-mechanical and filtration-capacity properties of host rocks and coals from the Lenin and Kazakhstanskaya mines were determined. Regularities governing the application of these parameters to coals of different formations and depths were established; fracture orientations and characteristics were evaluated; and relationships between changes in coal seam parameters and gas content were identified. A comprehensive methodological framework for studying the physical and capacity properties of the coal–rock mass under natural thermodynamic conditions has been developed. Its primary application is the investigation of coal seams prepared for mining to support geomechanical calculations for efficient and safe coal extraction, the implementation of degasification measures for high-gas-content seams, and the assessment of gas-dynamic risks based on the character of variations in physical parameters.
Open AccessAssessment of Strength Characteristics and Structural Heterogeneity of Coal Seams in the Karaganda Basin by Geophysical Methods for Enhancing Mining Safety
The principal difficulty in studying the physico-mechanical and filtration-capacity properties of coals and host rocks under laboratory conditions using core samples lies in reproducing natural thermodynamic conditions characteristic of in situ depths. To address this issue, specialized equipment and methodologies for transferring measurement results are employed, including the Hoek–Brown failure criterion, the structural weakening coefficient, and the development of thermodynamic models. The reliability and accuracy of such measurements are determined by the degree of conformity between the adopted laboratory conditions and natural in situ conditions, the number of samples representing different lithological varieties, and the adequacy of sampling procedures ensuring representativeness. Particular challenges arise when sampling cleated and fractured coals formed under natural stress–strain conditions and contain methane, which significantly influences their physical properties. These difficulties are especially pronounced in prepared-for-mining high-gas-content coal seams of the Karaganda Basin at depths of approximately 700 m, where obtaining representative samples is technically complicated. Reliable values of the physico-mechanical properties of the coal–rock mass are essential for geomechanical calculations aimed at ensuring safe mining of high-gas-content seams through risk assessment of geodynamic phenomena, particularly in zones of geological disturbances, floor heave, and roof collapse. In this context, the use of a comprehensive suite of geophysical logging data from exploration boreholes makes it possible to obtain continuous, high-precision information on physico-mechanical and filtration-capacity properties. These methods are particularly important for characterizing the coal–rock mass in operating mines, since the natural state of host rocks and prepared coal seams is altered due to stress relief caused by mine workings, preliminary degasification measures, and hydraulic fracturing. The problem addressed is the need for reliable assessment of rock and coal seam parameters under natural thermodynamic stress–strain conditions, taking into account lithological composition, structural heterogeneity, fracture development, stratigraphic differentiation, and gas saturation. The aim of this study is to ensure efficient and safe coal extraction based on geomechanical calculations utilizing physico-mechanical and filtration-capacity properties of host rocks and gas-bearing coal seams, whether prepared for mining or not yet extracted. The research methods are based on an integrated complex of geophysical logging of exploration wells, specialized software tools, and statistical processing techniques to identify patterns in physico-mechanical and filtration-capacity properties of host rocks and coal seams under natural stress–strain conditions, as well as to determine the nature of changes in these properties within coal seams and roof and floor rocks in prepared mining areas. The physico-mechanical and filtration-capacity properties of host rocks and coals from the Lenin and Kazakhstanskaya mines were determined. Regularities governing the application of these parameters to coals of different formations and depths were established; fracture orientations and characteristics were evaluated; and relationships between changes in coal seam parameters and gas content were identified. A comprehensive methodological framework for studying the physical and capacity properties of the coal–rock mass under natural thermodynamic conditions has been developed. Its primary application is the investigation of coal seams prepared for mining to support geomechanical calculations for efficient and safe coal extraction, the implementation of degasification measures for high-gas-content seams, and the assessment of gas-dynamic risks based on the character of variations in physical parameters.
- Open Access
Geomechanical Modeling of the Northern Katpar Deposit (Kazakhstan): Assessing the Impact of Rock Mass Disturbance on Stability Safety Factor
The development of a geomechanical model is aimed at enhancing the safety of mining operations through the determination of optimal slope angles and the probabilistic assessment of pit wall stability. For the conditions of open-pit mining, three-dimensional geomechanical models were constructed based on the calculation of the slope stability factor using the Rocscience Slide2/Slide3 (v.9.027, 2023) software package. The stress–strain state of the rock mass at the final stage of extraction was evaluated using the finite element method. Strength reduction factors (SRF) were determined considering the physico-mechanical properties of the rocks forming the near-contour zone of the massif. The stability of the pit slopes was assessed along individual geological cross-sections in accordance with the design contours of the Northern Katpar open pit. Calculations performed using several methods confirmed the overall stability of the pit walls. The final design parameters of the projected open pit were determined. For the first time, it was established that in the southern and southwestern sectors of the Northern Katpar pit, within the elevation range of +700 to +400 m, a reduction in the SFR (from 1.18 to 1.41) occurs due to the predominance of siltstones and the presence of tectonic disturbances. The generalized results of numerical slope stability analyses for the design pit contour, together with the developed geological–structural model of the deposit, provide a basis for ensuring the safe conduct of mining operations at the site.
Open AccessGeomechanical Modeling of the Northern Katpar Deposit (Kazakhstan): Assessing the Impact of Rock Mass Disturbance on Stability Safety Factor
The development of a geomechanical model is aimed at enhancing the safety of mining operations through the determination of optimal slope angles and the probabilistic assessment of pit wall stability. For the conditions of open-pit mining, three-dimensional geomechanical models were constructed based on the calculation of the slope stability factor using the Rocscience Slide2/Slide3 (v.9.027, 2023) software package. The stress–strain state of the rock mass at the final stage of extraction was evaluated using the finite element method. Strength reduction factors (SRF) were determined considering the physico-mechanical properties of the rocks forming the near-contour zone of the massif. The stability of the pit slopes was assessed along individual geological cross-sections in accordance with the design contours of the Northern Katpar open pit. Calculations performed using several methods confirmed the overall stability of the pit walls. The final design parameters of the projected open pit were determined. For the first time, it was established that in the southern and southwestern sectors of the Northern Katpar pit, within the elevation range of +700 to +400 m, a reduction in the SFR (from 1.18 to 1.41) occurs due to the predominance of siltstones and the presence of tectonic disturbances. The generalized results of numerical slope stability analyses for the design pit contour, together with the developed geological–structural model of the deposit, provide a basis for ensuring the safe conduct of mining operations at the site.
- Open Access
Research Progress of Environmental Studies of a Mining Facility for Land Restoration (Using the Example of a Mining Enterprise in the Karaganda Region)
This article is devoted to the crucial actual problem of the restoration of lands disturbed by the mining industry. It has been determined that before the reclamation of disturbed lands, it is essential to conduct an environmental impact assessment. The main objective of the research is to find and study the most optimal methods for reducing the technogenic impact of the mining industry on the environment by restoring disturbed areas. The object of the study was a mining enterprise in the Karaganda region. The Karaganda region was chosen for the study due to being the one with the most mining industry. After the extraction of mineral resources, the territories of the region became the most vulnerable and required the clearest solution for land restoration, taking into account the physical and geographical conditions. The work includes a statistical analysis of historical data on the state of disturbed territories of the Karaganda region, and laboratory and field studies. The comprehensive study revealed a clear need to restore disturbed lands. This will prevent further degradation of land resources and will make it possible to use them for new agricultural purposes. For the first time, studies were conducted for various soils, including technogenic soils, typical for areas where mining enterprises are located. For the first time, a reclamation algorithm has been developed for a mining enterprise in the Karaganda region, taking into account engineering and geological surveys.
Open AccessResearch Progress of Environmental Studies of a Mining Facility for Land Restoration (Using the Example of a Mining Enterprise in the Karaganda Region)
This article is devoted to the crucial actual problem of the restoration of lands disturbed by the mining industry. It has been determined that before the reclamation of disturbed lands, it is essential to conduct an environmental impact assessment. The main objective of the research is to find and study the most optimal methods for reducing the technogenic impact of the mining industry on the environment by restoring disturbed areas. The object of the study was a mining enterprise in the Karaganda region. The Karaganda region was chosen for the study due to being the one with the most mining industry. After the extraction of mineral resources, the territories of the region became the most vulnerable and required the clearest solution for land restoration, taking into account the physical and geographical conditions. The work includes a statistical analysis of historical data on the state of disturbed territories of the Karaganda region, and laboratory and field studies. The comprehensive study revealed a clear need to restore disturbed lands. This will prevent further degradation of land resources and will make it possible to use them for new agricultural purposes. For the first time, studies were conducted for various soils, including technogenic soils, typical for areas where mining enterprises are located. For the first time, a reclamation algorithm has been developed for a mining enterprise in the Karaganda region, taking into account engineering and geological surveys.
- Open Access
- 28 July 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (15) , 8372
Geomechanical Basis for Assessing Open-Pit Slope Stability in High-Altitude Gold Mining
The development of mining operations in high-altitude regions is associated with a number of geomechanical challenges caused by increased rock fracturing, adverse climatic conditions, and high seismic activity. These issues are particularly relevant for the exploitation of gold ore deposits, where the stability of open-pit slopes directly affects both safety and extraction efficiency. The aim of this study is to develop and practically substantiate a comprehensive approach to assessing and ensuring slope stability, using the Bozymchak gold ore deposit—located in a high-altitude and seismically active zone—as a case study. The research involves the laboratory testing of rock samples obtained from engineering–geological boreholes, field shear tests on rock prisms, laser scanning of pit slopes, and digital geomechanical modeling. The developed calculation schemes take into account the structural features of the rock mass, geological conditions, and the design contours of the pit. In addition, special bench excavation technologies with pre-shear slotting and automated GeoMoS monitoring are implemented for real-time slope condition tracking. The results of the study make it possible to reliably determine the strength characteristics of the rocks under natural conditions, identify critical zones of potential collapse, and develop recommendations for optimizing slope parameters and mining technologies. The implemented approach ensures the required level of safety.
- 28 July 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (15) , 8372
Open AccessGeomechanical Basis for Assessing Open-Pit Slope Stability in High-Altitude Gold Mining
The development of mining operations in high-altitude regions is associated with a number of geomechanical challenges caused by increased rock fracturing, adverse climatic conditions, and high seismic activity. These issues are particularly relevant for the exploitation of gold ore deposits, where the stability of open-pit slopes directly affects both safety and extraction efficiency. The aim of this study is to develop and practically substantiate a comprehensive approach to assessing and ensuring slope stability, using the Bozymchak gold ore deposit—located in a high-altitude and seismically active zone—as a case study. The research involves the laboratory testing of rock samples obtained from engineering–geological boreholes, field shear tests on rock prisms, laser scanning of pit slopes, and digital geomechanical modeling. The developed calculation schemes take into account the structural features of the rock mass, geological conditions, and the design contours of the pit. In addition, special bench excavation technologies with pre-shear slotting and automated GeoMoS monitoring are implemented for real-time slope condition tracking. The results of the study make it possible to reliably determine the strength characteristics of the rocks under natural conditions, identify critical zones of potential collapse, and develop recommendations for optimizing slope parameters and mining technologies. The implemented approach ensures the required level of safety.
- Open Access
Optimization of Reinforcement Schemes for Stabilizing the Working Floor in Coal Mines Based on an Assessment of Its Deformation State
In the Karaganda coal basin, deteriorating geomechanical conditions have been observed, including seam disturbances, diminished strength of argillite–aleurolite strata, water ingress, and pronounced floor heave, all of which markedly increase the labor intensity of maintaining developmental headings. The maintenance and operation of these entries for a reference coal yield of 1000 t necessitate 72–75 man-shifts, of which 90–95% are expended on mitigating ground pressure effects and restoring support integrity. Conventional heave control measures—such as relief drifts, slotting, drainage, secondary blasting, and the application of concrete or rock–bolt systems—deliver either transient efficacy or incur prohibitive labor and material expenditures while lacking unified methodologies for predictive forecasting and support parameter design. This study therefore advocates for an integrated framework that synergizes geomechanical characterization, deformation prognosis, and the tailored selection of reinforcement schemes (incorporating both sidewall and floor-anchoring systems with directed preloading), calibrated to seam depth, geometry, and lithological properties. Employing deformation state assessments to optimize reinforcement layouts for floor stabilization in coal mine workings is projected to curtail repair volumes by 30–40% whilst significantly enhancing operational safety, efficiency, and the punctuality of face preparation.
Open AccessOptimization of Reinforcement Schemes for Stabilizing the Working Floor in Coal Mines Based on an Assessment of Its Deformation State
In the Karaganda coal basin, deteriorating geomechanical conditions have been observed, including seam disturbances, diminished strength of argillite–aleurolite strata, water ingress, and pronounced floor heave, all of which markedly increase the labor intensity of maintaining developmental headings. The maintenance and operation of these entries for a reference coal yield of 1000 t necessitate 72–75 man-shifts, of which 90–95% are expended on mitigating ground pressure effects and restoring support integrity. Conventional heave control measures—such as relief drifts, slotting, drainage, secondary blasting, and the application of concrete or rock–bolt systems—deliver either transient efficacy or incur prohibitive labor and material expenditures while lacking unified methodologies for predictive forecasting and support parameter design. This study therefore advocates for an integrated framework that synergizes geomechanical characterization, deformation prognosis, and the tailored selection of reinforcement schemes (incorporating both sidewall and floor-anchoring systems with directed preloading), calibrated to seam depth, geometry, and lithological properties. Employing deformation state assessments to optimize reinforcement layouts for floor stabilization in coal mine workings is projected to curtail repair volumes by 30–40% whilst significantly enhancing operational safety, efficiency, and the punctuality of face preparation.
- 10 May 2025
- Published by LLC Gornaya Kniga in Mining informational and analytical bulletin
- Vol. 6
Application of mine geophysics method to solving problems of geology
- 10 May 2025
- Published by LLC Gornaya Kniga in Mining informational and analytical bulletin
- Vol. 6
Application of mine geophysics method to solving problems of geology