D. V. Medvedev
D. V. Medvedev has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- A. S. Tovb
“SOVNET” Project Management Association
1 shared publication - D. G. Maksin
Russian Presidential Academy of National Economy and Public Administration
1 shared publication G.S. Guzaeva
1 shared publication- I. B. Khrapkov
Educational and Consulting Center “KURS Project
1 shared publication - N.V. Kashkina1 shared publication
- S.G. Konyukhova
Central Research Institute of Dentistry and Maxillofacial Surgery
1 shared publication
Latest Publications
- Open Access
- 19 March 2026
- Published by State University of Management in Journal of Project Management
- Vol. 1 (4) , 12-22
IPMA CCT certification: providing competence for consultants, coaches, and trainers in project management
IPMA CCT certification for consultants, coaches, and trainers in project ma nagement, which is part of the certification line of the International Project Management Association (IPMA), has been analyzed. The certification is based on the IPMA ICB4CCT standard requirements. In Russia, this certification is implemented by the National Project Management Association “SOVNET”. The relevance of the research stems from the growing need to ensure the quality of educational and consulting support for project activities. Implementing IPMA CCT certification is a logical response to the challenges associated with the need to confirm the competence of specialists developing project management talent. The study is based on an analysis of IPMA regulatory and methodological documentation (ICB4, ICB4CCT, and ICRCCT), as well as internal materials and practices of the SOVNET’s certification programs. Methods of system analysis, classification, and comparative description have been used. The authors define the CCT certification’s place within the IPMA-SOVNET certification system, describe its three-level structure, and outline key candidate requirements. The competencybased assessment model has been analyzed, and the end-to-end certification process has been described. It has been concluded that the CCT certification implementation in Russia expands opportunities for professional growth for consul tants, coaches, and trainers and contributes to improving the quality of training for project management specialists.
- 19 March 2026
- Published by State University of Management in Journal of Project Management
- Vol. 1 (4) , 12-22
Open AccessIPMA CCT certification: providing competence for consultants, coaches, and trainers in project management
IPMA CCT certification for consultants, coaches, and trainers in project ma nagement, which is part of the certification line of the International Project Management Association (IPMA), has been analyzed. The certification is based on the IPMA ICB4CCT standard requirements. In Russia, this certification is implemented by the National Project Management Association “SOVNET”. The relevance of the research stems from the growing need to ensure the quality of educational and consulting support for project activities. Implementing IPMA CCT certification is a logical response to the challenges associated with the need to confirm the competence of specialists developing project management talent. The study is based on an analysis of IPMA regulatory and methodological documentation (ICB4, ICB4CCT, and ICRCCT), as well as internal materials and practices of the SOVNET’s certification programs. Methods of system analysis, classification, and comparative description have been used. The authors define the CCT certification’s place within the IPMA-SOVNET certification system, describe its three-level structure, and outline key candidate requirements. The competencybased assessment model has been analyzed, and the end-to-end certification process has been described. It has been concluded that the CCT certification implementation in Russia expands opportunities for professional growth for consul tants, coaches, and trainers and contributes to improving the quality of training for project management specialists.
- 1 January 2024
- Published by Media Sphere Publishing Group in Russian Journal of Stomatology
- Vol. 17 (1)
On the issue of optimizing the remote interaction system of medical workers using telemedicine technologies by project management methods
The developed project concept, which foundation was a methodology of project management, optimizes a control system of the remote interaction system of medical workers in the provision of medical care using telemedicine technologies for prototyping in the preparation of a pilot project. As a result of the study, there is a developed variant of integrating project management methods into a healthcare organization to find the best solution at the project planning stage. The proposed concept fits the requirements of project management to initiate a project with the possibility of practical implementation. The study aims to develop a concept of optimizing the remote interaction system of medical workers in the provision of medical care using telemedicine technologies by project management methods to improve the quality of planning and implementation of similar projects in healthcare. MATERIALS AND METHODS The study includes an analysis of 47 sources of regulatory legal documentation, 31 works of scientific literature and 617 applications, an application of the empirical method, and traditional and agile methods of project management for achievement to the objectives of the study. The search for primary material includes sources from funds of the State Central Scientific Medical Library, on the Russian information and analytical portal in the field of science, medicine, and education ‘eLIBRARY.RU’, computer databases of legal reference systems ‘Consultant-plus’, ‘Garant’ and ‘Pravo.RU’. The depth of the study was 39 years. DISCUSSION AND CONCLUSION In the case of continuing the development of the project concept, it is necessary to establish requirements for the project and their evaluation ways, further organizational and methodological planning, phased implementation and coordination of processes, including project scaling procedures, take into account organizational, technological, ethical and legal aspects. As a result of the study with application of project management methods, there are the developed concept of the project ‘Optimization of the control system of the remote interaction system of medical workers in the organization and provision of medical care using telemedicine technologies’ and the determined conditions, under which the best value properties of this interaction can be achieved. Transparency of the obtained results can help to check the correctness of tactical decisions and prepare for their implementation at the planning stage of an actual pilot project on this topic.
- 1 January 2024
- Published by Media Sphere Publishing Group in Russian Journal of Stomatology
- Vol. 17 (1)
On the issue of optimizing the remote interaction system of medical workers using telemedicine technologies by project management methods
The developed project concept, which foundation was a methodology of project management, optimizes a control system of the remote interaction system of medical workers in the provision of medical care using telemedicine technologies for prototyping in the preparation of a pilot project. As a result of the study, there is a developed variant of integrating project management methods into a healthcare organization to find the best solution at the project planning stage. The proposed concept fits the requirements of project management to initiate a project with the possibility of practical implementation. The study aims to develop a concept of optimizing the remote interaction system of medical workers in the provision of medical care using telemedicine technologies by project management methods to improve the quality of planning and implementation of similar projects in healthcare. MATERIALS AND METHODS The study includes an analysis of 47 sources of regulatory legal documentation, 31 works of scientific literature and 617 applications, an application of the empirical method, and traditional and agile methods of project management for achievement to the objectives of the study. The search for primary material includes sources from funds of the State Central Scientific Medical Library, on the Russian information and analytical portal in the field of science, medicine, and education ‘eLIBRARY.RU’, computer databases of legal reference systems ‘Consultant-plus’, ‘Garant’ and ‘Pravo.RU’. The depth of the study was 39 years. DISCUSSION AND CONCLUSION In the case of continuing the development of the project concept, it is necessary to establish requirements for the project and their evaluation ways, further organizational and methodological planning, phased implementation and coordination of processes, including project scaling procedures, take into account organizational, technological, ethical and legal aspects. As a result of the study with application of project management methods, there are the developed concept of the project ‘Optimization of the control system of the remote interaction system of medical workers in the organization and provision of medical care using telemedicine technologies’ and the determined conditions, under which the best value properties of this interaction can be achieved. Transparency of the obtained results can help to check the correctness of tactical decisions and prepare for their implementation at the planning stage of an actual pilot project on this topic.