Abhaysinha Gunvantrao Shelake
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Abhaysinha Gunvantrao Shelake has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
- Nivedita Gogate
Dr. Vishwanath Karad MIT World Peace University
3 shared publications - Pravin Minde
Dr. Vishwanath Karad MIT World Peace University, Pune, India
3 shared publications - Mrudula Kulkarni
Dr. Vishwanath Karad MIT World Peace University, Pune, India
2 shared publications Nivedita G. Gogate
Department of Civil Engineering, Dr. Vishwanath Karad MIT World Peace University, Pune, India
2 shared publications- Adinath Yadhav
Dr. Vishwanath Karad MIT World Peace University, Pune, India
1 shared publication - Arpit R. Patel
Physical Research Laboratory, Ahmedabad, India
1 shared publication
Latest Publications
- 2 October 2025
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 42 (3-4) , 357-385
Activity-centric risk analysis for delay prediction in Indian tunnel projects
- 2 October 2025
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 42 (3-4) , 357-385
Activity-centric risk analysis for delay prediction in Indian tunnel projects
- Open Access
- 11 October 2024
- Published by Springer Nature in Discover Materials
- Vol. 4 (1) , 1-15
Comprehensive review on the use of plastic waste in sustainable concrete construction
- 11 October 2024
- Published by Springer Nature in Discover Materials
- Vol. 4 (1) , 1-15
Open AccessComprehensive review on the use of plastic waste in sustainable concrete construction
- 18 May 2024
- Published by Springer Nature
- p. 517-529
An Experimental Study on the Effects of PVA, Jute, and Recron 3S Fibers on Bendable Concrete Properties
- 18 May 2024
- Published by Springer Nature
- p. 517-529
An Experimental Study on the Effects of PVA, Jute, and Recron 3S Fibers on Bendable Concrete Properties
- 28 March 2024
- Published by Springer Nature
- p. 239-250
AHP Framework for Prioritising Risk Factors in Bridge Construction
- 28 March 2024
- Published by Springer Nature
- p. 239-250
AHP Framework for Prioritising Risk Factors in Bridge Construction
- 26 March 2024
- Published by Springer Nature
- p. 177-187
AHP Approach for Risk Factors Prioritisation in Tunnel Construction
- 26 March 2024
- Published by Springer Nature
- p. 177-187
AHP Approach for Risk Factors Prioritisation in Tunnel Construction
- 20 October 2023
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 24 (2) , 161-176
Selection of most significant risk factors for Indian tunnel projects: an integrated fuzzy-based MCDM approach
- 20 October 2023
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 24 (2) , 161-176
Selection of most significant risk factors for Indian tunnel projects: an integrated fuzzy-based MCDM approach
- 17 October 2023
- Published by Springer Nature in Innovative Infrastructure Solutions
- Vol. 8 (11) , 1-15
A systematic approach for rework reduction in precast buildings in India
- 17 October 2023
- Published by Springer Nature in Innovative Infrastructure Solutions
- Vol. 8 (11) , 1-15
A systematic approach for rework reduction in precast buildings in India
- Open Access
- 2 August 2023
- Published by Springer Nature in Research Square
Integration of activity-based risk factors in PERT scheduling: case study of Indian metro tunnel projects
In construction sector, tunneling is a costly and risky affair. The time and cost involved in tunnel construction is very high. Hence, it is necessary to use more comprehensive method like Program Evaluation Review Technique (PERT) while preparing schedule of tunnel construction projects. As PERT considers three different time durations, the reliability of the schedule prepared at planning stage of the project gets enhanced significantly. However, the schedule preparation of tunneling projects still relies mainly on the optimistic time. In this work the author attempts to prepare a PERT schedule for metro tunnel projects by integrating activity-wise risk factors. Initially, the critical risk factors are taken from previous literature and further these are mapped with tunnel construction activities. The list of construction activities along with optimistic schedule and respective activity-wise risk factor list is then supplied to tunnel experts for capturing their opinion on pessimistic and most likely time values. Finally, a comparative analysis is carried out by estimating project cost and developing a relation between the different times and costs associated with metro tunnel projects. The intent of this paper is to integrate the activity-wise risk factors in project scheduling to reduce delays and subsequent cost escalations. Integrating risk factors into PERT scheduling will improve risk management, enhance decision-making and enable realistic project planning. This will significantly improve project success rate. By considering risks in the scheduling process, project managers can effectively manage uncertainties and minimize their impact on project outcomes.
- 2 August 2023
- Published by Springer Nature in Research Square
Open AccessIntegration of activity-based risk factors in PERT scheduling: case study of Indian metro tunnel projects
In construction sector, tunneling is a costly and risky affair. The time and cost involved in tunnel construction is very high. Hence, it is necessary to use more comprehensive method like Program Evaluation Review Technique (PERT) while preparing schedule of tunnel construction projects. As PERT considers three different time durations, the reliability of the schedule prepared at planning stage of the project gets enhanced significantly. However, the schedule preparation of tunneling projects still relies mainly on the optimistic time. In this work the author attempts to prepare a PERT schedule for metro tunnel projects by integrating activity-wise risk factors. Initially, the critical risk factors are taken from previous literature and further these are mapped with tunnel construction activities. The list of construction activities along with optimistic schedule and respective activity-wise risk factor list is then supplied to tunnel experts for capturing their opinion on pessimistic and most likely time values. Finally, a comparative analysis is carried out by estimating project cost and developing a relation between the different times and costs associated with metro tunnel projects. The intent of this paper is to integrate the activity-wise risk factors in project scheduling to reduce delays and subsequent cost escalations. Integrating risk factors into PERT scheduling will improve risk management, enhance decision-making and enable realistic project planning. This will significantly improve project success rate. By considering risks in the scheduling process, project managers can effectively manage uncertainties and minimize their impact on project outcomes.
- 31 July 2023
- Published by Springer Nature
- p. 41-53
Delay Analysis of Residential Construction by Using Augmented Reality and Virtual Reality
- 31 July 2023
- Published by Springer Nature
- p. 41-53
Delay Analysis of Residential Construction by Using Augmented Reality and Virtual Reality