Jingsi Lin
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Jingsi Lin has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Mohammad Waqar Ali Asad
Curtin University
4 shared publications Erkan Topal
Affiliation Western Australian School of Mines: Minerals, Energy, and Chemical Engineering, Curtin University, Carlisle, Australia
2 shared publications- Erkan Topal
Curtin University
2 shared publications Ping Chang
Curtin University
2 shared publications- Ping Chang
Curtin University
2 shared publications Jinxin Huang
1 shared publication
Latest Publications
- Open Access
- 3 June 2026
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- p. 1-33
Metaheuristic approaches for open-pit mine production scheduling: a comprehensive review
- 3 June 2026
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- p. 1-33
Open AccessMetaheuristic approaches for open-pit mine production scheduling: a comprehensive review
- Open Access
- 7 October 2025
- Published by Public Library of Science (PLoS) in PLOS ONE
- Vol. 20 (10) , e0333606
A new simulated annealing algorithm for simultaneous open-pit and waste dump scheduling in mining complexes
Production scheduling models for open-pit mining complexes determine the optimal sequence for extracting mining blocks while adhering to technical and operational constraints. Although various mathematical models are available in the literature, solving them for large-scale operations remains computationally intensive. This challenge becomes more complex when models aim to simultaneously schedule block extraction and waste dumping, as this introduces additional variables and constraints, further complicating the problem. This paper presents a novel Simulated Annealing (SA)-based algorithm as a solution method for the simultaneous optimisation of block extraction and waste dumping sequences in open-pit mining complexes. The proposed approach incorporates an innovative variable reduction technique and a heuristic for generating reliable initial solutions. Numerical results show that the proposed algorithm achieves an NPV within 6.08% of the exact solution derived through a commercial solver while reducing the runtime by 82%. More importantly, for relatively larger instances that commercial solver fails to resolve, the proposed method maintains robust performance and delivers high-quality solutions within reasonable computational times.
- 7 October 2025
- Published by Public Library of Science (PLoS) in PLOS ONE
- Vol. 20 (10) , e0333606
Open AccessA new simulated annealing algorithm for simultaneous open-pit and waste dump scheduling in mining complexes
Production scheduling models for open-pit mining complexes determine the optimal sequence for extracting mining blocks while adhering to technical and operational constraints. Although various mathematical models are available in the literature, solving them for large-scale operations remains computationally intensive. This challenge becomes more complex when models aim to simultaneously schedule block extraction and waste dumping, as this introduces additional variables and constraints, further complicating the problem. This paper presents a novel Simulated Annealing (SA)-based algorithm as a solution method for the simultaneous optimisation of block extraction and waste dumping sequences in open-pit mining complexes. The proposed approach incorporates an innovative variable reduction technique and a heuristic for generating reliable initial solutions. Numerical results show that the proposed algorithm achieves an NPV within 6.08% of the exact solution derived through a commercial solver while reducing the runtime by 82%. More importantly, for relatively larger instances that commercial solver fails to resolve, the proposed method maintains robust performance and delivers high-quality solutions within reasonable computational times.
- Open Access
- 8 August 2025
- Published by Elsevier in Resources Policy
- Vol. 109
Comparative analysis of mathematical models for integrated production scheduling and sustainable waste management in open-pit mining complexes
- 8 August 2025
- Published by Elsevier in Resources Policy
- Vol. 109
Open AccessComparative analysis of mathematical models for integrated production scheduling and sustainable waste management in open-pit mining complexes
- Open Access
- 29 March 2024
- Published by Elsevier in Resources Policy
- Vol. 91
A novel model for sustainable production scheduling of an open-pit mining complex considering waste encapsulation
- 29 March 2024
- Published by Elsevier in Resources Policy
- Vol. 91
Open AccessA novel model for sustainable production scheduling of an open-pit mining complex considering waste encapsulation