Pao-Hsiang Hsi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Pao-Hsiang Hsi has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
Shi-Lin Chen
Chung Yuan Christian University, Chung Li, Taiwan
3 shared publicationsChang-Hsing Lee
National Tsing Hua University, Hsinchu, Taiwan
1 shared publicationJoseph C. P. Shieh
Graduate Institute of Finance, National Taiwan University of Science and Technology, Taipei, Taiwan
1 shared publication- Joseph C. P. Shieh
Graduate Institute of Finance, National Taiwan University of Science and Technology, Taipei 10607, Taiwan
1 shared publication Joseph C.P. Shieh
National Taiwan University of Science and Technology
1 shared publicationRay-Jong Li
1 shared publication
Latest Publications
- Open Access
- 6 May 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (9) , 3880
How Credible Is the 25-Year Photovoltaic (PV) Performance Warranty?—A Techno-Financial Evaluation and Implications for the Sustainable Development of the PV Industry
To support the bankability of PV projects, PV manufacturers have been offering one of the longest warranties in the world, typically in the range of 25–30 years. During the warranty period, PV manufacturers guarantee that the degradation of PV modules will not exceed 0.4–0.6% each year, or the buyer can at any time make a claim to the manufacturer for replacement or compensation for the shortfall. Due to its popularity, the performance warranty terms have become more and more competitive each year. However, long-term PV operating data have been very limited and bankruptcy of PV manufacturers has been quite common. Without a proper methodology to assess the adequacy of PV manufacturer’s warranty fund (WF) reserve, the 25-year performance warranty can become empty promises. To ensure sustainable development of the PV industry, this study develops a probability-weighted expected value method to determine the necessary WF reserve based on benchmark field degradation data and prevailing degradation cap of 0.55% per year. The simulation result shows that, unless the manufacturer’s degradation pattern is significantly better than the benchmark degradation profile, 1.302% of the sales value is required for the WF reserve. To the best of our knowledge, this is the first study that provides WF reserve requirement estimation for 25-year PV performance warranty. The result will provide transparency for PV investors and motivation for PV manufacturers for continuous quality improvement as all such achievement can now be reflected in manufacturers’ annual report result.
- 6 May 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (9) , 3880
Open AccessHow Credible Is the 25-Year Photovoltaic (PV) Performance Warranty?—A Techno-Financial Evaluation and Implications for the Sustainable Development of the PV Industry
To support the bankability of PV projects, PV manufacturers have been offering one of the longest warranties in the world, typically in the range of 25–30 years. During the warranty period, PV manufacturers guarantee that the degradation of PV modules will not exceed 0.4–0.6% each year, or the buyer can at any time make a claim to the manufacturer for replacement or compensation for the shortfall. Due to its popularity, the performance warranty terms have become more and more competitive each year. However, long-term PV operating data have been very limited and bankruptcy of PV manufacturers has been quite common. Without a proper methodology to assess the adequacy of PV manufacturer’s warranty fund (WF) reserve, the 25-year performance warranty can become empty promises. To ensure sustainable development of the PV industry, this study develops a probability-weighted expected value method to determine the necessary WF reserve based on benchmark field degradation data and prevailing degradation cap of 0.55% per year. The simulation result shows that, unless the manufacturer’s degradation pattern is significantly better than the benchmark degradation profile, 1.302% of the sales value is required for the WF reserve. To the best of our knowledge, this is the first study that provides WF reserve requirement estimation for 25-year PV performance warranty. The result will provide transparency for PV investors and motivation for PV manufacturers for continuous quality improvement as all such achievement can now be reflected in manufacturers’ annual report result.
- Open Access
- 17 April 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 12, 56981-56990
Techno-Economic Investment Risk Modeling of Battery Energy Storage System Participating in Day-Ahead Frequency Regulation Market
Owing to its high capital cost, Battery Energy Storage System (BESS) investment risk has received considerable attention in recent years. Currently, day-ahead frequency regulation service is one major revenue source for BESS, and the revenue is exposed to a compound of stochastic market risk and technical risk. On the market risk side, due to a lack of long-term contracts, investors are exposed to “price risk” and “volume (revenue hours) risk” over the entire investment horizon of 5–10 years. On the technical side, performance issues such as equipment degradation and inherent defects can result in reduced or even negative revenue for BESS under the pay-for-performance remuneration structure. Quantifying these risks is important for investors and banks to assess a project’s investability and bankability. However, existing BESS techno-economic literature has mostly focused on developing optimal control strategies to maximize revenue or optimal battery sizing to reduce capital expenditure. To our knowledge, none of the literature to date has addressed the long-term risk perspective of BESS investment. This study aims to fill this gap by developing a long-term probabilistic revenue estimate that considers these risk factors using Monte Carlo simulations. A case study using Taiwan’s newly launched day-ahead market, which has similar grid dynamics and revenue risk factors as in most markets, is also presented in this paper. Simulation result shows that, for the conservative P90 (90% exceedance probability) scenario, expected return of a hypothetical 10MW (half-hour battery) BESS investment is 8.65% and its debt service coverage ratio is 1.189.
- 17 April 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 12, 56981-56990
Open AccessTechno-Economic Investment Risk Modeling of Battery Energy Storage System Participating in Day-Ahead Frequency Regulation Market
Owing to its high capital cost, Battery Energy Storage System (BESS) investment risk has received considerable attention in recent years. Currently, day-ahead frequency regulation service is one major revenue source for BESS, and the revenue is exposed to a compound of stochastic market risk and technical risk. On the market risk side, due to a lack of long-term contracts, investors are exposed to “price risk” and “volume (revenue hours) risk” over the entire investment horizon of 5–10 years. On the technical side, performance issues such as equipment degradation and inherent defects can result in reduced or even negative revenue for BESS under the pay-for-performance remuneration structure. Quantifying these risks is important for investors and banks to assess a project’s investability and bankability. However, existing BESS techno-economic literature has mostly focused on developing optimal control strategies to maximize revenue or optimal battery sizing to reduce capital expenditure. To our knowledge, none of the literature to date has addressed the long-term risk perspective of BESS investment. This study aims to fill this gap by developing a long-term probabilistic revenue estimate that considers these risk factors using Monte Carlo simulations. A case study using Taiwan’s newly launched day-ahead market, which has similar grid dynamics and revenue risk factors as in most markets, is also presented in this paper. Simulation result shows that, for the conservative P90 (90% exceedance probability) scenario, expected return of a hypothetical 10MW (half-hour battery) BESS investment is 8.65% and its debt service coverage ratio is 1.189.
- 1 June 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1278-1281
Financial Challenges and Risk Management of Solar Warranty Risks
Financial success of PV projects is contingent upon the long-term reliable performance of PV panels. Most PV manufacturers provide 25-year performance warranty to enhance bankability of their products. However, this also places huge financial burdens on the PV manufactures. Establishing solid credibility of such warranty is critical in today's market where global PV subsidy diminishes and the interest rate increases. Any further increase in the perceived risk of PV warranty could imply much higher financing cost for PV projects thereby offsetting PV industry's efforts to reduce cost. This paper provides a risk management perspective on the three key risk drivers for perceived PV warranty risk with a goal to support the PV industry addressing PV investors and lenders' concern.
- 1 June 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1278-1281
Financial Challenges and Risk Management of Solar Warranty Risks
Financial success of PV projects is contingent upon the long-term reliable performance of PV panels. Most PV manufacturers provide 25-year performance warranty to enhance bankability of their products. However, this also places huge financial burdens on the PV manufactures. Establishing solid credibility of such warranty is critical in today's market where global PV subsidy diminishes and the interest rate increases. Any further increase in the perceived risk of PV warranty could imply much higher financing cost for PV projects thereby offsetting PV industry's efforts to reduce cost. This paper provides a risk management perspective on the three key risk drivers for perceived PV warranty risk with a goal to support the PV industry addressing PV investors and lenders' concern.
- 12 August 2010
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Delivery
- Vol. 26 (2) , 1008-1016
Transferring of VFTO From an EHV to MV System as Observed in Taiwan's No. 3 Nuclear Power Plant
The severe insulation breakdown on one medium-voltage (MV) switchgear led to a complete blackout of Taipower's 3rd nuclear power plant on March 18th, 2001. This has been one of the most serious incidents during the past 30 years of Taipower's nuclear generation and while the cause of the event was a combination of design, maintenance, and equipment aging issue, it is apparent that repeated switching operation on the extra-high-voltage (EHV) side eventually caused this severe insulation breakdown on MV switchgear. Very-fast transient overvoltage (VFTO) is the phenomenon of transient overvoltage generated during switching operation characterized by a very short rise time of 4 to 100 ns. Prior research on this topic focused on VFTO's impact on the EHV side of the transformer and this paper presents the field measurement result together with long-duration multiple-restrike simulation for the VFTO transferred from the EHV side to the MV system through the power transformers. It is shown that this VFTO can be as high as 7 times the rated line-to-ground peak voltage and the maximum VFTO often occusr neither at the first nor at the last strike due to the superposition of restriking voltage on top of oscillation voltage created by prior strikes.
- 12 August 2010
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Delivery
- Vol. 26 (2) , 1008-1016
Transferring of VFTO From an EHV to MV System as Observed in Taiwan's No. 3 Nuclear Power Plant
The severe insulation breakdown on one medium-voltage (MV) switchgear led to a complete blackout of Taipower's 3rd nuclear power plant on March 18th, 2001. This has been one of the most serious incidents during the past 30 years of Taipower's nuclear generation and while the cause of the event was a combination of design, maintenance, and equipment aging issue, it is apparent that repeated switching operation on the extra-high-voltage (EHV) side eventually caused this severe insulation breakdown on MV switchgear. Very-fast transient overvoltage (VFTO) is the phenomenon of transient overvoltage generated during switching operation characterized by a very short rise time of 4 to 100 ns. Prior research on this topic focused on VFTO's impact on the EHV side of the transformer and this paper presents the field measurement result together with long-duration multiple-restrike simulation for the VFTO transferred from the EHV side to the MV system through the power transformers. It is shown that this VFTO can be as high as 7 times the rated line-to-ground peak voltage and the maximum VFTO often occusr neither at the first nor at the last strike due to the superposition of restriking voltage on top of oscillation voltage created by prior strikes.
- 1 May 1999
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 14 (2) , 452-459
Simulating on-line dynamic voltages of multiple trains under real operating conditions for AC railways
The analysis of railway power supplies (RPS) presents a unique type of load flow problem which is characterized by its constant moving loads, dynamically changing load types (constant current/constant power), and its specialized network structure. When multiple trains and the capacitors for power factor correction are also involved, the analysis of this special kind of power system can be very complicated and time consuming which will prevent on-line state analysis from becoming possible. This paper presents a novel and extremely efficient algorithm to solve this special kind of power flow problem with high precision. By first decoupling the autotransformer (AT) current into 2 equal phasor components and then applying an iteration-based circuit-analysis approach, the RPS power flow problem can be solved in an accurate but extremely efficient manner. An on-line railway power-supply state analyzer (RPSA) based on this approach is presented in this paper while the extension of using this approach to perform power factor corrector (PFC) simulation is also presented
- 1 May 1999
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 14 (2) , 452-459
Simulating on-line dynamic voltages of multiple trains under real operating conditions for AC railways
The analysis of railway power supplies (RPS) presents a unique type of load flow problem which is characterized by its constant moving loads, dynamically changing load types (constant current/constant power), and its specialized network structure. When multiple trains and the capacitors for power factor correction are also involved, the analysis of this special kind of power system can be very complicated and time consuming which will prevent on-line state analysis from becoming possible. This paper presents a novel and extremely efficient algorithm to solve this special kind of power flow problem with high precision. By first decoupling the autotransformer (AT) current into 2 equal phasor components and then applying an iteration-based circuit-analysis approach, the RPS power flow problem can be solved in an accurate but extremely efficient manner. An on-line railway power-supply state analyzer (RPSA) based on this approach is presented in this paper while the extension of using this approach to perform power factor corrector (PFC) simulation is also presented
- 1 July 1998
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Delivery
- Vol. 13 (3) , 728-734
Distribution automation communication infrastructure
[[abstract]]Communication is very important to distribution automation (DA) because DA relies on the coordinated effort of various elements in the system. Many communication systems have been designed for DA so far. However, most of these communication systems use proprietary (vendor specific) protocols and are for individual instead of all DA functions. Thus, there has long been a great need for an open and integrated communication system capable of supporting all DA functions transparently. This paper presents a new communication infrastructure, PS-TCP/IP (power system TCP/IP), for all DA communications including customer services. PS-TCP/IP can support all DA functions transparently because it follows three design principles. First, each network element (NE) involved in DA communications, including customer meters, is assigned a unique network-layer address which corresponds to their relative position in the power distribution network. Second, all NEs can communicate with each other as long as they encapsulate their data in a standard-format “IP datagram”. Third, any ISO layer 1 and 2 protocols can be incorporated easily. PS-TCP/IP's design follows ISO's layered approach. This means that the structure of the communication system is independent of that of any DA function's, thus creating a truly open and transparent communication environment for all DA functions[[fileno]]2030164010021[[department]]電機工程學
- 1 July 1998
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Delivery
- Vol. 13 (3) , 728-734
Distribution automation communication infrastructure
[[abstract]]Communication is very important to distribution automation (DA) because DA relies on the coordinated effort of various elements in the system. Many communication systems have been designed for DA so far. However, most of these communication systems use proprietary (vendor specific) protocols and are for individual instead of all DA functions. Thus, there has long been a great need for an open and integrated communication system capable of supporting all DA functions transparently. This paper presents a new communication infrastructure, PS-TCP/IP (power system TCP/IP), for all DA communications including customer services. PS-TCP/IP can support all DA functions transparently because it follows three design principles. First, each network element (NE) involved in DA communications, including customer meters, is assigned a unique network-layer address which corresponds to their relative position in the power distribution network. Second, all NEs can communicate with each other as long as they encapsulate their data in a standard-format “IP datagram”. Third, any ISO layer 1 and 2 protocols can be incorporated easily. PS-TCP/IP's design follows ISO's layered approach. This means that the structure of the communication system is independent of that of any DA function's, thus creating a truly open and transparent communication environment for all DA functions[[fileno]]2030164010021[[department]]電機工程學