David Ndiyamba
David Ndiyamba has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Francis Mafuratidze2 shared publications
- Hagreaves Kumba
Department of Industrial Engineering, Durban University of Technology, Durban 4001, South Africa
2 shared publications Ackson Gondo
1 shared publication- Joseph Akpan
Department of Industrial Engineering, Durban University of Technology, Durban, 4001, South Africa
1 shared publication - Oludolapo Akanni Olanrewaju
Department of Industrial Engineering, Durban University of Technology, Durban 4001, South Africa
1 shared publication
Latest Publications
- Open Access
- 8 July 2026
- Published by LIDSEN Publishing Inc in Journal of Energy and Power Technology
- Vol. 08 (03) , 1-24
Technical and Economic Feasibility Assessment of a Mini Wind Turbine Using Statistical Method for Sustainable Urban Energy: A Case Study of Zvishavane Urban, Zimbabwe
Unreliable electricity supply remains a significant barrier to economic development in sub-Saharan Africa, with Zimbabwe experiencing acute load-shedding that disrupts residential, commercial, and industrial activity. This paper presents a techno-economic feasibility assessment of a mini wind turbine for distributed urban energy generation in Zvishavane, Zimbabwe. Wind resource data were sourced from two independent platforms Weather Spark (30-year climatological record) and Meteoblue (high-resolution reanalysis) and analysed using both direct calculation and the Rayleigh statistical distribution model applied to monthly bin-frequency data at a measurement height of 10 m above ground level. Mean wind speeds at the measurement height range from 3.31 m/s (May) to 5.03 m/s (October), placing the site in the low wind power density class (Class 1: P/A ≤ 100 W/m2) under direct assessment. Application of the Rayleigh probability density function yields substantially higher mean power density estimates, a minimum of 78.98 W/m2 and a maximum of 277.15 W/m2, elevating the site into the fair-to-moderate resource class (150-200 W/m2). Boundary layer wind profile analysis using the logarithmic law indicates that the rated cut-in speed of 5 m/s is achievable at a minimum tower height of 27 m, while a tower of 63 m achieves the low-category power density threshold, both technically practicable. An annual energy production of 438-683 kWh/year is estimated for a representative 400 W rated mini turbine, yielding a levelised cost of energy (LCOE) of USD 0.143-0.224/kWh. At the grid-equivalent avoided cost of USD 0.10-0.15/kWh and with realistic capital expenditure assumptions, the simple payback period ranges from 8 to 14 years, which improves to 5-8 years under preferential financing conditions. The study demonstrates that, while Zvishavane is not a premium wind resource site, targeted turbine deployment at optimised tower heights is technically viable and approaches economic competitiveness under current tariff and financing conditions, particularly as an energy resilience measure against chronic grid outages.
- 8 July 2026
- Published by LIDSEN Publishing Inc in Journal of Energy and Power Technology
- Vol. 08 (03) , 1-24
Open AccessTechnical and Economic Feasibility Assessment of a Mini Wind Turbine Using Statistical Method for Sustainable Urban Energy: A Case Study of Zvishavane Urban, Zimbabwe
Unreliable electricity supply remains a significant barrier to economic development in sub-Saharan Africa, with Zimbabwe experiencing acute load-shedding that disrupts residential, commercial, and industrial activity. This paper presents a techno-economic feasibility assessment of a mini wind turbine for distributed urban energy generation in Zvishavane, Zimbabwe. Wind resource data were sourced from two independent platforms Weather Spark (30-year climatological record) and Meteoblue (high-resolution reanalysis) and analysed using both direct calculation and the Rayleigh statistical distribution model applied to monthly bin-frequency data at a measurement height of 10 m above ground level. Mean wind speeds at the measurement height range from 3.31 m/s (May) to 5.03 m/s (October), placing the site in the low wind power density class (Class 1: P/A ≤ 100 W/m2) under direct assessment. Application of the Rayleigh probability density function yields substantially higher mean power density estimates, a minimum of 78.98 W/m2 and a maximum of 277.15 W/m2, elevating the site into the fair-to-moderate resource class (150-200 W/m2). Boundary layer wind profile analysis using the logarithmic law indicates that the rated cut-in speed of 5 m/s is achievable at a minimum tower height of 27 m, while a tower of 63 m achieves the low-category power density threshold, both technically practicable. An annual energy production of 438-683 kWh/year is estimated for a representative 400 W rated mini turbine, yielding a levelised cost of energy (LCOE) of USD 0.143-0.224/kWh. At the grid-equivalent avoided cost of USD 0.10-0.15/kWh and with realistic capital expenditure assumptions, the simple payback period ranges from 8 to 14 years, which improves to 5-8 years under preferential financing conditions. The study demonstrates that, while Zvishavane is not a premium wind resource site, targeted turbine deployment at optimised tower heights is technically viable and approaches economic competitiveness under current tariff and financing conditions, particularly as an energy resilience measure against chronic grid outages.
- Open Access
- 19 April 2024
- Published by IntechOpen
Engineering Education and Industry Synergy in Zimbabwe: A Divide and Redirection
Engineering education in Zimbabwe is crucial for the country’s Vision 2030 Economic Agenda, but the education system is inadequate due to the mismatch between the provided talents and the ever-changing engineering world. This shortage of skilled engineers hinders economic growth and efforts to combat poverty, infrastructural deficit, and other sustainable development challenges. Traditional teaching methods and outdated materials negatively impact the outcomes of engineering graduates entering the industry. The Ministry of Higher and Tertiary Education transitioned from the Education 3.0 model in 2017 to Education 5.0, which incorporates innovation and industrialization. The increasing demand for qualified engineers to drive economic growth in Zimbabwe is discussed in this paper, which also offers recommendations for improving engineering education in the country. The study uses short questionnaires and semi-structured interviews with engineering and academic stakeholders with a response rate of 95.9% to investigate the current gap between engineering education and industry. The aim is to inspire academic institutions, education designers, and curriculum developers to create programs that provide sustainable education, industry, and engineering development in Zimbabwe.
- 19 April 2024
- Published by IntechOpen
Open AccessEngineering Education and Industry Synergy in Zimbabwe: A Divide and Redirection
Engineering education in Zimbabwe is crucial for the country’s Vision 2030 Economic Agenda, but the education system is inadequate due to the mismatch between the provided talents and the ever-changing engineering world. This shortage of skilled engineers hinders economic growth and efforts to combat poverty, infrastructural deficit, and other sustainable development challenges. Traditional teaching methods and outdated materials negatively impact the outcomes of engineering graduates entering the industry. The Ministry of Higher and Tertiary Education transitioned from the Education 3.0 model in 2017 to Education 5.0, which incorporates innovation and industrialization. The increasing demand for qualified engineers to drive economic growth in Zimbabwe is discussed in this paper, which also offers recommendations for improving engineering education in the country. The study uses short questionnaires and semi-structured interviews with engineering and academic stakeholders with a response rate of 95.9% to investigate the current gap between engineering education and industry. The aim is to inspire academic institutions, education designers, and curriculum developers to create programs that provide sustainable education, industry, and engineering development in Zimbabwe.