Qing Liu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Qing Liu has a total of 17 co-authors. Here are the top co-authors by number of shared publications:
- Chenggang Wang
School of Electrical Engineering, Beijing Jiaotong University, Beijing, China
1 shared publication Haruhiko Shirai
University of Fukui
1 shared publicationHisakazu Ogura
University of Fukui
1 shared publicationJia Tian
State Grid Anhui Electric Power Co., Ltd,Hefei,China
1 shared publication- Jianqiang Liu
School of Electrical Engineering, Beijing Jiaotong University, Beijing 100044, China
1 shared publication Jiaqing Wang
State Grid Anhui Electric Power Co., Ltd,Hefei,China
1 shared publication
Latest Publications
- Open Access
- 15 April 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 12, 55669-55681
A Topology and Control Method for Operational Testing of ±800 kV/8 GW Flexible DC Transmission Modular Multilevel Converter Valve
Due to the relatively low operational reliability of the MMC valve, it is necessary to establish corresponding test methods to examine the tolerance of the valve to electrical and thermal stresses under engineering requirements through operational tests, to verify its operational reliability. To meet the operational testing requirements for higher voltage and larger current converter valves, an appropriate test topology is required. The paper first analyzes the voltage and current stress characteristics of capacitor components and MMC converter valves in ±800 kV/8 GW Flexible DC transmission system, providing a theoretical basis for the stress of operational testing valve, requiring that to be equivalent to actual operating conditions. Addressing the operational testing demands for high voltage and large current converter valves in the ±800 kV/8 GW flexible DC transmission MMC, a test topology is proposed. This topology can meet the operating conditions of higher voltage and larger current and simultaneously conduct tests on valve segments and modules, significantly improving operational testing efficiency and reducing testing costs. Additionally, a control method applicable to this test topology is proposed, enabling flexible adjustment of DC and AC in the test circuit, thereby enhancing the equivalency of operational tests. In this paper, the proposed topology and control method have enhanced testing efficiency, reduced testing costs, improved testing equivalence, and enhanced the precision of current and capacitor voltage control. Finally, simulations and experiments are constructed to validate the feasibility and effectiveness of the proposed operational test topology and its control method through simulations and experiments.
- 15 April 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 12, 55669-55681
Open AccessA Topology and Control Method for Operational Testing of ±800 kV/8 GW Flexible DC Transmission Modular Multilevel Converter Valve
Due to the relatively low operational reliability of the MMC valve, it is necessary to establish corresponding test methods to examine the tolerance of the valve to electrical and thermal stresses under engineering requirements through operational tests, to verify its operational reliability. To meet the operational testing requirements for higher voltage and larger current converter valves, an appropriate test topology is required. The paper first analyzes the voltage and current stress characteristics of capacitor components and MMC converter valves in ±800 kV/8 GW Flexible DC transmission system, providing a theoretical basis for the stress of operational testing valve, requiring that to be equivalent to actual operating conditions. Addressing the operational testing demands for high voltage and large current converter valves in the ±800 kV/8 GW flexible DC transmission MMC, a test topology is proposed. This topology can meet the operating conditions of higher voltage and larger current and simultaneously conduct tests on valve segments and modules, significantly improving operational testing efficiency and reducing testing costs. Additionally, a control method applicable to this test topology is proposed, enabling flexible adjustment of DC and AC in the test circuit, thereby enhancing the equivalency of operational tests. In this paper, the proposed topology and control method have enhanced testing efficiency, reduced testing costs, improved testing equivalence, and enhanced the precision of current and capacitor voltage control. Finally, simulations and experiments are constructed to validate the feasibility and effectiveness of the proposed operational test topology and its control method through simulations and experiments.
- 1 May 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 6-11
Cost-benefit Optimization of Reserve Considering UHVDC transmission System and Wind Power
With the penetration of wind power and the development of Ultra-high voltage direct current (UHVDC) transmission system, the traditional deterministic reserve capacity allocation can no longer meet the requirements of economy and reliability in power system. In this paper, a new joint optimization model of generation and reserve based on cost-benefit analysis is proposed, considering the random faults of conventional unit, load forecasting errors, wind power forecasting errors and the random faults of UHVDC transmission system. In this model, the forecasting error of load and wind power, UHVDC transmission system are considered as multi-state units, which are introduced to the outage capacity probability table. The expected energy not served (EENS) is used to calculate the reserve benefit, Taking the minimum sum of system operation cost, reserve cost and reserve benefit as objective function, the joint optimization model is established to calculate the operational status and reserve capacity of each conventional unit during each research period, and the sensitive analysis of reserve on the related factors is performed.
- 1 May 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 6-11
Cost-benefit Optimization of Reserve Considering UHVDC transmission System and Wind Power
With the penetration of wind power and the development of Ultra-high voltage direct current (UHVDC) transmission system, the traditional deterministic reserve capacity allocation can no longer meet the requirements of economy and reliability in power system. In this paper, a new joint optimization model of generation and reserve based on cost-benefit analysis is proposed, considering the random faults of conventional unit, load forecasting errors, wind power forecasting errors and the random faults of UHVDC transmission system. In this model, the forecasting error of load and wind power, UHVDC transmission system are considered as multi-state units, which are introduced to the outage capacity probability table. The expected energy not served (EENS) is used to calculate the reserve benefit, Taking the minimum sum of system operation cost, reserve cost and reserve benefit as objective function, the joint optimization model is established to calculate the operational status and reserve capacity of each conventional unit during each research period, and the sensitive analysis of reserve on the related factors is performed.
- Open Access
- 1 January 2014
- Published by Institute of Electronics, Information and Communications Engineers (IEICE) in IEICE Transactions on Information and Systems
- Vol. E97.D (3) , 455-468
A New Artificial Fish Swarm Algorithm for the Multiple Knapsack Problem
- 1 January 2014
- Published by Institute of Electronics, Information and Communications Engineers (IEICE) in IEICE Transactions on Information and Systems
- Vol. E97.D (3) , 455-468
Open AccessA New Artificial Fish Swarm Algorithm for the Multiple Knapsack Problem
- 1 May 2009
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1757-1761
A there-level AC chopper with clock-interleaved constant frequency integration control
Multilevel converter has been widely used in DC / DC converter, inverter and rectifier, but it is rarely used in AC chopper. In the very few reports of multilevel AC chopper, the attention stress is limited on the study of the circuit topology and working principle. The report about the closed-loop control of multilevel AC chopper has not been seen yet. In this paper, on the basis of a three-level AC chopper principle of an in-depth analysis, the closed-loop controls of multilevel AC chopper are primary studied. Compare with common PI control, unified frequency integration control have fast dynamic response, good tracing ability, good regulating capacity and simple structure. Clock-interleaved unified frequency integration control is proposed to implement the closed-loop control of three-level AC chopper. The proposed control method not only can be applied to the mentioned three-level circuit, but also used in others three-level AC chopper. Even for the high number of circuit topology, it is easy to expand. The simulation experiment result proves the feasibility and validity of the proposed control method.
- 1 May 2009
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1757-1761
A there-level AC chopper with clock-interleaved constant frequency integration control
Multilevel converter has been widely used in DC / DC converter, inverter and rectifier, but it is rarely used in AC chopper. In the very few reports of multilevel AC chopper, the attention stress is limited on the study of the circuit topology and working principle. The report about the closed-loop control of multilevel AC chopper has not been seen yet. In this paper, on the basis of a three-level AC chopper principle of an in-depth analysis, the closed-loop controls of multilevel AC chopper are primary studied. Compare with common PI control, unified frequency integration control have fast dynamic response, good tracing ability, good regulating capacity and simple structure. Clock-interleaved unified frequency integration control is proposed to implement the closed-loop control of three-level AC chopper. The proposed control method not only can be applied to the mentioned three-level circuit, but also used in others three-level AC chopper. Even for the high number of circuit topology, it is easy to expand. The simulation experiment result proves the feasibility and validity of the proposed control method.