Zhangliang Wei
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Zhangliang Wei has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Renzhong Niu
College of Mechanical and Electrical Engineering, Shihezi University, Shihezi 832000, China
5 shared publications - Zhigang Li
College of Information Science and Technology, Shihezi University, Shihezi, China
5 shared publications - Zipeng Yu
College of Information Science and Technology, Shihezi University, Shihezi 832000, China
4 shared publications - Peilin Jin
College of Information Science and Technology, Shihezi University, Shihezi 832000, China
3 shared publications - Qilong Zhao
College of Information Science and Technology, Shihezi University, Shihezi 832000, China
2 shared publications - Qi Zhang
Xinjiang Production and Construction Corps Key Laboratory of Computing Intelligence and Network Information Security, Shihezi University, Shihezi 832003, China
1 shared publication
Latest Publications
- Open Access
Digital Twin-Based Improved YOLOv8 Algorithm for Micro-Defect Detection of Labyrinth Drip Emitters in High-Speed Agricultural Production Lines
In water-scarce regions such as Xinjiang, China, agricultural development is constrained not only by limited water resources but also by a strong reliance on water-saving irrigation technologies. Drip irrigation is a key measure for improving irrigation efficiency and promoting the sustainable development of water-saving agriculture. However, defects arising during the manufacture of labyrinth Drip emitters—the core components of drip irrigation systems—can undermine system reliability, leading to channel blockage and non-uniform irrigation. To tackle this issue, a defect detection approach is developed by integrating Digital Twin technology with an enhanced YOLOv8 model for online inspection of labyrinth Drip emitters on drip irrigation tape production lines. In parallel, a self-built dataset covering six defect categories is established. Supported by the DT framework, the standard YOLOv8 network is refined to strengthen its capability in identifying complex micro-defects. Specifically, DySnakeConv is introduced to better represent the curved and slender characteristics of labyrinth channels; DySample is incorporated to improve the reconstruction and representation of fine-grained details; an Efficient Multi-Scale Attention module is adopted to capture richer contextual information while suppressing background noise; and Inner-SIoU is applied to optimize the bounding-box regression process. Experimental results show that the model achieves 89.6% precision, 90.9% recall, and 93.9% mAP50. Compared with the baseline YOLOv8, precision, recall, and mAP50 are improved by 7.3, 3.9, and 3.3 percentage points, respectively. Under the same training conditions, the proposed model outperforms YOLOv10 and YOLOv11 in accuracy-related metrics. Specifically, compared with YOLOv11, precision, recall, and mAP50 are improved by 4.8, 5.0, and 2.6 percentage points, respectively; compared with YOLOv10, they are improved by 10.0, 7.7, and 7.3 percentage points, respectively. Meanwhile, the model maintains a lightweight size of 3.7 M parameters and a real-time inference speed of 150.2 FPS, demonstrating a favorable accuracy–efficiency trade-off. By extending manufacturing-level quality control to agricultural applications, the approach helps ensure uniform irrigation and improve water-use efficiency, providing practical technical support for precision agriculture in arid regions.
Open AccessDigital Twin-Based Improved YOLOv8 Algorithm for Micro-Defect Detection of Labyrinth Drip Emitters in High-Speed Agricultural Production Lines
In water-scarce regions such as Xinjiang, China, agricultural development is constrained not only by limited water resources but also by a strong reliance on water-saving irrigation technologies. Drip irrigation is a key measure for improving irrigation efficiency and promoting the sustainable development of water-saving agriculture. However, defects arising during the manufacture of labyrinth Drip emitters—the core components of drip irrigation systems—can undermine system reliability, leading to channel blockage and non-uniform irrigation. To tackle this issue, a defect detection approach is developed by integrating Digital Twin technology with an enhanced YOLOv8 model for online inspection of labyrinth Drip emitters on drip irrigation tape production lines. In parallel, a self-built dataset covering six defect categories is established. Supported by the DT framework, the standard YOLOv8 network is refined to strengthen its capability in identifying complex micro-defects. Specifically, DySnakeConv is introduced to better represent the curved and slender characteristics of labyrinth channels; DySample is incorporated to improve the reconstruction and representation of fine-grained details; an Efficient Multi-Scale Attention module is adopted to capture richer contextual information while suppressing background noise; and Inner-SIoU is applied to optimize the bounding-box regression process. Experimental results show that the model achieves 89.6% precision, 90.9% recall, and 93.9% mAP50. Compared with the baseline YOLOv8, precision, recall, and mAP50 are improved by 7.3, 3.9, and 3.3 percentage points, respectively. Under the same training conditions, the proposed model outperforms YOLOv10 and YOLOv11 in accuracy-related metrics. Specifically, compared with YOLOv11, precision, recall, and mAP50 are improved by 4.8, 5.0, and 2.6 percentage points, respectively; compared with YOLOv10, they are improved by 10.0, 7.7, and 7.3 percentage points, respectively. Meanwhile, the model maintains a lightweight size of 3.7 M parameters and a real-time inference speed of 150.2 FPS, demonstrating a favorable accuracy–efficiency trade-off. By extending manufacturing-level quality control to agricultural applications, the approach helps ensure uniform irrigation and improve water-use efficiency, providing practical technical support for precision agriculture in arid regions.
- Open Access
- 19 February 2025
- Published by MDPI AG in Agriculture
- Vol. 15 (4) , 442
Research on Flexible Job Shop Scheduling Method for Agricultural Equipment Considering Multi-Resource Constraints
The agricultural equipment market has the characteristics of rapid demand changes and high demand for machine models, etc., so multi-variety, small-batch, and customized production methods have become the mainstream of agricultural machinery enterprises. The flexible job shop scheduling problem (FJSP) in the context of agricultural machinery and equipment manufacturing is addressed, which involves multiple resources including machines, workers, and automated guided vehicles (AGVs). The aim is to optimize two objectives: makespan and the maximum continuous working hours of all workers. To tackle this complex problem, a Multi-Objective Discrete Grey Wolf Optimization (MODGWO) algorithm is proposed. The MODGWO algorithm integrates a hybrid initialization strategy and a multi-neighborhood local search to effectively balance the exploration and exploitation capabilities. An encoding/decoding method and a method for initializing a mixed population are introduced, which includes an operation sequence vector, machine selection vector, worker selection vector, and AGV selection vector. The solution-updating mechanism is also designed to be discrete. The performance of the MODGWO algorithm is evaluated through comprehensive experiments using an extended version of the classic Brandimarte test case by randomly adding worker and AGV information. The experimental results demonstrate that MODGWO achieves better performance in identifying high-quality solutions compared to other competitive algorithms, especially for medium- and large-scale cases. The proposed algorithm contributes to the research on flexible job shop scheduling under multi-resource constraints, providing a novel solution approach that comprehensively considers both workers and AGVs. The research findings have practical implications for improving production efficiency and balancing multiple objectives in agricultural machinery and equipment manufacturing enterprises.
- 19 February 2025
- Published by MDPI AG in Agriculture
- Vol. 15 (4) , 442
Open AccessResearch on Flexible Job Shop Scheduling Method for Agricultural Equipment Considering Multi-Resource Constraints
The agricultural equipment market has the characteristics of rapid demand changes and high demand for machine models, etc., so multi-variety, small-batch, and customized production methods have become the mainstream of agricultural machinery enterprises. The flexible job shop scheduling problem (FJSP) in the context of agricultural machinery and equipment manufacturing is addressed, which involves multiple resources including machines, workers, and automated guided vehicles (AGVs). The aim is to optimize two objectives: makespan and the maximum continuous working hours of all workers. To tackle this complex problem, a Multi-Objective Discrete Grey Wolf Optimization (MODGWO) algorithm is proposed. The MODGWO algorithm integrates a hybrid initialization strategy and a multi-neighborhood local search to effectively balance the exploration and exploitation capabilities. An encoding/decoding method and a method for initializing a mixed population are introduced, which includes an operation sequence vector, machine selection vector, worker selection vector, and AGV selection vector. The solution-updating mechanism is also designed to be discrete. The performance of the MODGWO algorithm is evaluated through comprehensive experiments using an extended version of the classic Brandimarte test case by randomly adding worker and AGV information. The experimental results demonstrate that MODGWO achieves better performance in identifying high-quality solutions compared to other competitive algorithms, especially for medium- and large-scale cases. The proposed algorithm contributes to the research on flexible job shop scheduling under multi-resource constraints, providing a novel solution approach that comprehensively considers both workers and AGVs. The research findings have practical implications for improving production efficiency and balancing multiple objectives in agricultural machinery and equipment manufacturing enterprises.
- Open Access
- 21 January 2025
- Published by MDPI AG in Preprints.org
Research on Flexible Job Shop Scheduling Method for Agricultural Equipment Considering Multi-Resource Constraints
Agricultural equipment market has the characteristics of rapid demand changes and high demand for machine models, etc., so multi variety, small batch, and customized production methods have become the mainstream of agricultural machinery enterprises. Flexible job shop scheduling problem (FJSP) in the context of agricultural machinery and equipment manufacturing is addressed, which involves multiple resources including machines, workers, and automated guided vehicles (AGVs). The aim is to optimize two objectives: makespan and the maximum continuous working hours of all workers. To tackle this complex problem, a Multi-Objective Discrete Grey Wolf Optimization (MODGWO) algorithm is proposed. The MODGWO algorithm integrates a hybrid initialization strategy and a multi-neighborhood local search to effectively balance the exploration and exploitation capabilities. An encoding/decoding method and a method for initializing a mixed population are introduced, which includes operation sequence vector, machine selection vector, worker selection vector, and AGV selection vector. The solution updating mechanism is also designed to be discrete. The performance of the MODGWO algorithm is evaluated through comprehensive experiments using an extended version of the classic Brandimarte test case by randomly adding worker and AGV information. The experimental results demonstrate that MODGWO achieves better performance in identifying high-quality solutions compared to other competitive algorithms, especially for medium and large-scale cases. The proposed algorithm contributes to the research on flexible job shop scheduling under multi-resource constraints, providing a novel solution approach that comprehensively considers both workers and AGVs. The research findings have practical implications for improving production efficiency and balancing multiple objectives in agricultural machinery and equipment manufacturing enterprises.
- 21 January 2025
- Published by MDPI AG in Preprints.org
Open AccessResearch on Flexible Job Shop Scheduling Method for Agricultural Equipment Considering Multi-Resource Constraints
Agricultural equipment market has the characteristics of rapid demand changes and high demand for machine models, etc., so multi variety, small batch, and customized production methods have become the mainstream of agricultural machinery enterprises. Flexible job shop scheduling problem (FJSP) in the context of agricultural machinery and equipment manufacturing is addressed, which involves multiple resources including machines, workers, and automated guided vehicles (AGVs). The aim is to optimize two objectives: makespan and the maximum continuous working hours of all workers. To tackle this complex problem, a Multi-Objective Discrete Grey Wolf Optimization (MODGWO) algorithm is proposed. The MODGWO algorithm integrates a hybrid initialization strategy and a multi-neighborhood local search to effectively balance the exploration and exploitation capabilities. An encoding/decoding method and a method for initializing a mixed population are introduced, which includes operation sequence vector, machine selection vector, worker selection vector, and AGV selection vector. The solution updating mechanism is also designed to be discrete. The performance of the MODGWO algorithm is evaluated through comprehensive experiments using an extended version of the classic Brandimarte test case by randomly adding worker and AGV information. The experimental results demonstrate that MODGWO achieves better performance in identifying high-quality solutions compared to other competitive algorithms, especially for medium and large-scale cases. The proposed algorithm contributes to the research on flexible job shop scheduling under multi-resource constraints, providing a novel solution approach that comprehensively considers both workers and AGVs. The research findings have practical implications for improving production efficiency and balancing multiple objectives in agricultural machinery and equipment manufacturing enterprises.
- Open Access
A Study on the Man-Hour Prediction in Structural Steel Fabrication
Longitudinal cutting is the most common process in steel structure manufacturing, and the man-hours of the process provide an important basis for enterprises to generate production schedules. However, currently, the man-hours in factories are mainly estimated by experts, and the accuracy of this method is relatively low. In this study, we propose a system that predicts man-hours with history data in the manufacturing process and that can be applied in practical structural steel fabrication. The system addresses the data inconsistency problem by one-hot encoding and data normalization techniques, Pearson correlation coefficient for feature selection, and the Random Forest Regression (RFR) for prediction. Compared with the other three Machine-Learning (ML) algorithms, the Random Forest algorithm has the best performance. The results demonstrate that the proposed system outperforms the conventional approach and has better forecast accuracy so it is suitable for man-hours prediction.
Open AccessA Study on the Man-Hour Prediction in Structural Steel Fabrication
Longitudinal cutting is the most common process in steel structure manufacturing, and the man-hours of the process provide an important basis for enterprises to generate production schedules. However, currently, the man-hours in factories are mainly estimated by experts, and the accuracy of this method is relatively low. In this study, we propose a system that predicts man-hours with history data in the manufacturing process and that can be applied in practical structural steel fabrication. The system addresses the data inconsistency problem by one-hot encoding and data normalization techniques, Pearson correlation coefficient for feature selection, and the Random Forest Regression (RFR) for prediction. Compared with the other three Machine-Learning (ML) algorithms, the Random Forest algorithm has the best performance. The results demonstrate that the proposed system outperforms the conventional approach and has better forecast accuracy so it is suitable for man-hours prediction.
- Open Access
- 6 May 2024
- Published by MDPI AG in Preprints.org
A Study on the Man-Hour Prediction in Structural Steel Fabrication
Longitudinal cutting is a most common process in steel structure manufacturing, and the man-hours of the process provide an important basis for enterprises to generate production schedules.However, currently the man-hours in factories are mainly estimated by experts, and the accuracy of this method is relatively low.In this study,we propose a system that predicts man-hours with history data in the manufacturing process and that can be applied in practical structural steel fabrication.The system addresses the data inconsistency problem by one-hot encoding and data normalization techniques,Pearson correlation coefficient for feature selection,and the Random Forest Regression(RFR) for prediction.Compared with the other three Machine Learning(ML) algorithms, the Random Forest algorithm has the best performance.The results demonstrate that the proposed system outperforms the conventional approach and has better forecast accuracy, so that it is suitable for man-hours prediction.
- 6 May 2024
- Published by MDPI AG in Preprints.org
Open AccessA Study on the Man-Hour Prediction in Structural Steel Fabrication
Longitudinal cutting is a most common process in steel structure manufacturing, and the man-hours of the process provide an important basis for enterprises to generate production schedules.However, currently the man-hours in factories are mainly estimated by experts, and the accuracy of this method is relatively low.In this study,we propose a system that predicts man-hours with history data in the manufacturing process and that can be applied in practical structural steel fabrication.The system addresses the data inconsistency problem by one-hot encoding and data normalization techniques,Pearson correlation coefficient for feature selection,and the Random Forest Regression(RFR) for prediction.Compared with the other three Machine Learning(ML) algorithms, the Random Forest algorithm has the best performance.The results demonstrate that the proposed system outperforms the conventional approach and has better forecast accuracy, so that it is suitable for man-hours prediction.