Yuxin Cao
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Yuxin Cao has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Baojin Zhang
Key Laboratory of the Ministry of Education for Urban Underground Engineering, Beijing Jiaotong University, Beijing 100044, China
1 shared publication - Jinpeng Zhao
University of Science and Technology Beijing
1 shared publication - Xiaomin Fan
Key Laboratory of Urban Underground Engineering, Ministry of Education, Beijing Jiaotong University, Beijing 100044, China
1 shared publication - Yongtao Jiang
Power China Railway Construction Co., Ltd., Beijing 100044, China
1 shared publication - Zhongsheng Tan
Key Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China
1 shared publication
Latest Publications
- Open Access
- 28 May 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (11) , 4623
Analysis of Shield Tunneling Parameters and Research on Prediction Model of Tunneling Excavation Speed in Volcanic Ash Strata of Jakarta–Bandung High-Speed Railway Project
Insufficient investigations have been conducted on the analysis of shield tunneling parameters and the prediction of the tunneling excavation speed in formations composed of volcanic ash strata. To address this issue, we employ a comprehensive approach utilizing literature research, mathematical statistics, and other methodologies, centered on the analysis of the No. 1 Tunnel of the Jakarta–Bandung High-Speed Railway. Our focus is on examining the evolution patterns and inter-relationships of shield tunneling parameters within volcanic ash strata. Subsequently, we propose an optimized strategy for these tunneling parameters. By employing six machine-learning algorithms to construct prediction models, we compare and analyze their performance in predicting the tunneling excavation speed. The results indicate a positive correlation between slurry pressure and tunnel depth in volcanic ash strata, suggesting that the grouting pressure should exceed the slurry pressure by approximately 0.22 MPa. In the composite stratum of “volcanic ash debris + round gravel”, the cutter torque exhibits a strong negative correlation with the total thrust (−0.77). Due to tool wear and ground resistance, the excavation speed and cutter speed are weakly negatively correlated. Compared to other strata, shield tunneling in volcanic ash strata exhibits larger grouting pressure fluctuations, slower tunneling excavation speed, greater total thrust, higher cutter torque, and lower cutter speed. Regarding shield tunneling excavation speed prediction, the ranking of the algorithm performance is RF > DNN > ANN > BPNN > MNR > SVM, with RF achieving a decision coefficient of 0.829. The RF model is well-suited for predicting the shield structure tunneling excavation speed.
- 28 May 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (11) , 4623
Open AccessAnalysis of Shield Tunneling Parameters and Research on Prediction Model of Tunneling Excavation Speed in Volcanic Ash Strata of Jakarta–Bandung High-Speed Railway Project
Insufficient investigations have been conducted on the analysis of shield tunneling parameters and the prediction of the tunneling excavation speed in formations composed of volcanic ash strata. To address this issue, we employ a comprehensive approach utilizing literature research, mathematical statistics, and other methodologies, centered on the analysis of the No. 1 Tunnel of the Jakarta–Bandung High-Speed Railway. Our focus is on examining the evolution patterns and inter-relationships of shield tunneling parameters within volcanic ash strata. Subsequently, we propose an optimized strategy for these tunneling parameters. By employing six machine-learning algorithms to construct prediction models, we compare and analyze their performance in predicting the tunneling excavation speed. The results indicate a positive correlation between slurry pressure and tunnel depth in volcanic ash strata, suggesting that the grouting pressure should exceed the slurry pressure by approximately 0.22 MPa. In the composite stratum of “volcanic ash debris + round gravel”, the cutter torque exhibits a strong negative correlation with the total thrust (−0.77). Due to tool wear and ground resistance, the excavation speed and cutter speed are weakly negatively correlated. Compared to other strata, shield tunneling in volcanic ash strata exhibits larger grouting pressure fluctuations, slower tunneling excavation speed, greater total thrust, higher cutter torque, and lower cutter speed. Regarding shield tunneling excavation speed prediction, the ranking of the algorithm performance is RF > DNN > ANN > BPNN > MNR > SVM, with RF achieving a decision coefficient of 0.829. The RF model is well-suited for predicting the shield structure tunneling excavation speed.