Atia Sonda
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Atia Sonda has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
Akbar Gunawan
Industrial Engineering, University of Sultan Ageng Tirtayasa, Serang, Indonesia
2 shared publicationsAsep Ridwan
Sultan Ageng Tirtayasa University
2 shared publications- Ade Irman
Universitas Sultan Ageng Tirtayasa
1 shared publication Ade Sri Mariawati
Sultan Ageng Tirtayasa University
1 shared publicationAmelia Amelia
Department of Industrial Engineering Universitas Sultan Ageng Tirtayasa Jl. Jend. Sudirman KM 3 42435 Cilegon Banten Indonesia
1 shared publication- Ani Umyati
Universitas Sultan Ageng Tirtayasa
1 shared publication
Latest Publications
- Open Access
- 1 January 2024
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2891 (1) , 070016
Planning and evaluation of the university green canteen construction development project
The construction of a green concept canteen on campus is very important as a form of environmental protection and preservation. The construction planning of a g The construction of a green concept canteen on campus is very important as a form of environmental protection and preservation. The construction planning of a g
- 1 January 2024
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2891 (1) , 070016
Open AccessPlanning and evaluation of the university green canteen construction development project
The construction of a green concept canteen on campus is very important as a form of environmental protection and preservation. The construction planning of a g The construction of a green concept canteen on campus is very important as a form of environmental protection and preservation. The construction planning of a g
- Open Access
- 21 November 2023
- Published by LPPM ITN Malang in Industri Inovatif : Jurnal Teknik Industri
- Vol. 13 (2) , 86-91
PENERAPAN METODE HAZARD IDENTIFICATION AND RISK ASESSMENT (HIRA) DAN PENERAPAN STANDAR OPERASIONAL PROSEDUR (SOP) SEBAGAI UPAYA PENINGKATAN PRODUKSI DI UKM HALO OMA
Penelitian ini bertujuan untuk mengetahui seberapa pentingnya penerapan Standar Operasional Prosedur (SOP) dalam kegiatan pra produksi hingga pasca pangan. Metode penelitian yang dipergunakan pada penelitian ini adalah penelitian lapangan (field research), dimana peneliti secara langsung mengambil data dari proyek penelitian, sedangkan cara lain yang dipakai dalam Field Research ini yaitu interview, observasi dan dokumentasi. Hasil yang didapatkan yaitu pembuatan Standar Operasional Prosedur (SOP) proses produksi pembuatan produk Tempe Teri Main Bola, Standar Operasional Prosedur (SOP) pengangkutan berbasis ergonomi dan Standar Operasional Prosedur (SOP) mekanisme dokumentasi dan pencatatan ergonomi untuk UKM Halo Oma. Hasil yang didapat proses produksi pembuatan produk Tempe Teri Main Bola lebih mudah, pekerja tidak merasakan beban kerja berlebih, pekerja lebih terarah, lebih optimal dalam pengerjaan proses produksi, dan meminimalisir kesalahan dalam bekerja yang bisa merugikan UKM Halo Oma. UKM Halo Oma sangat terbantu dengan pembuatan Standar Operasional Prosedur (SOP) karena pelaksanaan kerja saat dalam hal kegiatan produksi menjadi lebih mudah. Kinerja pegawai bisa lebih terarah dan optimal. Serta bisa meminimalisir kesalahan dalam bekerja yang dapat merugikan UKM Halo Oma
- 21 November 2023
- Published by LPPM ITN Malang in Industri Inovatif : Jurnal Teknik Industri
- Vol. 13 (2) , 86-91
Open AccessPENERAPAN METODE HAZARD IDENTIFICATION AND RISK ASESSMENT (HIRA) DAN PENERAPAN STANDAR OPERASIONAL PROSEDUR (SOP) SEBAGAI UPAYA PENINGKATAN PRODUKSI DI UKM HALO OMA
Penelitian ini bertujuan untuk mengetahui seberapa pentingnya penerapan Standar Operasional Prosedur (SOP) dalam kegiatan pra produksi hingga pasca pangan. Metode penelitian yang dipergunakan pada penelitian ini adalah penelitian lapangan (field research), dimana peneliti secara langsung mengambil data dari proyek penelitian, sedangkan cara lain yang dipakai dalam Field Research ini yaitu interview, observasi dan dokumentasi. Hasil yang didapatkan yaitu pembuatan Standar Operasional Prosedur (SOP) proses produksi pembuatan produk Tempe Teri Main Bola, Standar Operasional Prosedur (SOP) pengangkutan berbasis ergonomi dan Standar Operasional Prosedur (SOP) mekanisme dokumentasi dan pencatatan ergonomi untuk UKM Halo Oma. Hasil yang didapat proses produksi pembuatan produk Tempe Teri Main Bola lebih mudah, pekerja tidak merasakan beban kerja berlebih, pekerja lebih terarah, lebih optimal dalam pengerjaan proses produksi, dan meminimalisir kesalahan dalam bekerja yang bisa merugikan UKM Halo Oma. UKM Halo Oma sangat terbantu dengan pembuatan Standar Operasional Prosedur (SOP) karena pelaksanaan kerja saat dalam hal kegiatan produksi menjadi lebih mudah. Kinerja pegawai bisa lebih terarah dan optimal. Serta bisa meminimalisir kesalahan dalam bekerja yang dapat merugikan UKM Halo Oma
- Open Access
- 31 March 2023
- Published by Universitas Sultan Ageng Tirtayasa (ASCEE) in Journal Industrial Servicess
- Vol. 9 (1) , 53-58
Product quality control analysis using the six sigma method
Product quality control analysis using the six sigma method
- 31 March 2023
- Published by Universitas Sultan Ageng Tirtayasa (ASCEE) in Journal Industrial Servicess
- Vol. 9 (1) , 53-58
Open AccessProduct quality control analysis using the six sigma method
Product quality control analysis using the six sigma method
- Open Access
- 8 November 2022
- Published by Universitas Negeri Gorontalo in Jambura Journal of Probability and Statistics
- Vol. 3 (2) , 151-160
PEMODELAN SPASIAL PRODUKSI IKAN PADA INDUSTRI BUDIDAYA PERIKANAN DI KOTA CILEGON
The aquaculture industry in Cilegon City is fairly substantial. In the year 2020, 230.09 tons of farmed fish were produced. In Cilegon City, fish production statistics is often used for each sub-district. So far, no research has been undertaken to examine the dependency of fish output from one district to the next. Spatial modeling is used to examine the spatial correlation of fish production data in each sub-district, making it easier to characterize observations in a sub-district and their relationships with other sub-districts. A semivariogram model was fitted using the fish production data, and it was discovered that fish production in the city of Cilegon followed the cubic model with model parameters C = 2.9891 and range a = 5.28. Furthermore, using this spatial model, assessment of fish production in a location, in this example Cilegon City, can be carried out in further research in an effort to see food security.
- 8 November 2022
- Published by Universitas Negeri Gorontalo in Jambura Journal of Probability and Statistics
- Vol. 3 (2) , 151-160
Open AccessPEMODELAN SPASIAL PRODUKSI IKAN PADA INDUSTRI BUDIDAYA PERIKANAN DI KOTA CILEGON
The aquaculture industry in Cilegon City is fairly substantial. In the year 2020, 230.09 tons of farmed fish were produced. In Cilegon City, fish production statistics is often used for each sub-district. So far, no research has been undertaken to examine the dependency of fish output from one district to the next. Spatial modeling is used to examine the spatial correlation of fish production data in each sub-district, making it easier to characterize observations in a sub-district and their relationships with other sub-districts. A semivariogram model was fitted using the fish production data, and it was discovered that fish production in the city of Cilegon followed the cubic model with model parameters C = 2.9891 and range a = 5.28. Furthermore, using this spatial model, assessment of fish production in a location, in this example Cilegon City, can be carried out in further research in an effort to see food security.
- Open Access
- 9 December 2021
- Published by Universitas Muhammadiyah Palembang in Integrasi: Jurnal Ilmiah Teknik Industri
- Vol. 6 (2) , 70-80
Analisis Penerapan Lean Six Sigma untuk Mengurangi Turn Around Time (TAT) C-CHECK pada Jasa Perawatan Pesawat
PT. XYZ merupakan perusahaan yang bergerak di bidang jasa maintenance, reparasi dan overhaul pesawat maupun engine pesawat. Waktu Turn Around Time (TAT) digunakan sebagai indikator kinerja pada sebuah perusahaan MRO’s. Turn Around Time (TAT) merupakan interval waktu maintenance yang diperlukan suatu pekerjaan mulai masuk kedalam sistem sampai proses tersebut selesai yang menunjukan suatu siklus kerja. Pada saat proses perawatan yang berlangsung di PT. XYZ umumnya terkadang terjadi deviasi dari TAT atau dengan kata lain pekerjaan mengalami delay, tujuan dari penelitian ini ialah untuk menhindari dan juga meminimasi keterlambatan dari Turn Around Time, maka untuk meminimasi hal tersebut digunakan metode lean six sigma. Dari hasil root cause analysis terdapat tiga faktor utama yang menyebabkan terjadinya keterlambatan dari Turn Around Time yang telah ditetapkan ialah dikarenakan kekurangan manpower, proses menunggu material yang terbagi menjadi dua jenis material yaitu shortage (material dibeli oleh pihak PT. XYZ) dan juga subcont (material yang akan diperbaiki di luar PT. XYZ), dan juga lamanya memproses finding (temuan permasalahan pada saat proses inspeksi), dan dari hasil perhitungan nilai sigma dari proses maintenance yang didapatkan ialah sebesar 2.60? dimana nilai sigma ini setara dengan rata – rata industri di Indonesia,Sehingga dengan perbaikan yang dilakukan diharapkan akan mampu menambah produktivitas serta efisiensi dari proses maintenance yang ada dan juga mampu meningkatkan kepercayaan customer yang akan menambah citra baik bagi PT. XYZ itu sendiri.
- 9 December 2021
- Published by Universitas Muhammadiyah Palembang in Integrasi: Jurnal Ilmiah Teknik Industri
- Vol. 6 (2) , 70-80
Open AccessAnalisis Penerapan Lean Six Sigma untuk Mengurangi Turn Around Time (TAT) C-CHECK pada Jasa Perawatan Pesawat
PT. XYZ merupakan perusahaan yang bergerak di bidang jasa maintenance, reparasi dan overhaul pesawat maupun engine pesawat. Waktu Turn Around Time (TAT) digunakan sebagai indikator kinerja pada sebuah perusahaan MRO’s. Turn Around Time (TAT) merupakan interval waktu maintenance yang diperlukan suatu pekerjaan mulai masuk kedalam sistem sampai proses tersebut selesai yang menunjukan suatu siklus kerja. Pada saat proses perawatan yang berlangsung di PT. XYZ umumnya terkadang terjadi deviasi dari TAT atau dengan kata lain pekerjaan mengalami delay, tujuan dari penelitian ini ialah untuk menhindari dan juga meminimasi keterlambatan dari Turn Around Time, maka untuk meminimasi hal tersebut digunakan metode lean six sigma. Dari hasil root cause analysis terdapat tiga faktor utama yang menyebabkan terjadinya keterlambatan dari Turn Around Time yang telah ditetapkan ialah dikarenakan kekurangan manpower, proses menunggu material yang terbagi menjadi dua jenis material yaitu shortage (material dibeli oleh pihak PT. XYZ) dan juga subcont (material yang akan diperbaiki di luar PT. XYZ), dan juga lamanya memproses finding (temuan permasalahan pada saat proses inspeksi), dan dari hasil perhitungan nilai sigma dari proses maintenance yang didapatkan ialah sebesar 2.60? dimana nilai sigma ini setara dengan rata – rata industri di Indonesia,Sehingga dengan perbaikan yang dilakukan diharapkan akan mampu menambah produktivitas serta efisiensi dari proses maintenance yang ada dan juga mampu meningkatkan kepercayaan customer yang akan menambah citra baik bagi PT. XYZ itu sendiri.