Caixia Guo
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Caixia Guo has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
Leilei Shi
Beijing No.4 Municipal Construction Engineering Co., Ltd. Beijing 100176, China
2 shared publications- Heng Kong
Beijing Municipal Construction Group Co., Ltd., A40 Xingshikou Road, Haidian District, Beijing 100195, China
1 shared publication - Huayang Lei
School of Civil Engineering and Architecture, Guangxi University, Nanning, China
1 shared publication - Kaihang Han
College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, China
1 shared publication - Mingming Jin
Key Laboratory of Coast Civil Structure Safety of the Education Ministry, School of Civil Engineering, Tianjin Univ., 92# Weijin Rd., Nankai District, Tianjin, China
1 shared publication Mingzhe Cui
Department of Civil and Environmental Engineering University of California Los Angeles CA 90095, USA
1 shared publication
Latest Publications
- 1 September 2018
- Published by Coastal Education and Research Foundation in Journal of Coastal Research
- Vol. 83 (sp1) , 300-304
Superiority Analysis of Composite Structure of Initial Lining Segment and Secondary Lining Molded Concrete
- 1 September 2018
- Published by Coastal Education and Research Foundation in Journal of Coastal Research
- Vol. 83 (sp1) , 300-304
Superiority Analysis of Composite Structure of Initial Lining Segment and Secondary Lining Molded Concrete
- 1 September 2018
- Published by Coastal Education and Research Foundation in Journal of Coastal Research
- Vol. 83 (sp1) , 237-246
The Influence of Earth Pressure Balanced Shield Tunnel Underpassing Coastal Water Body on Stratum Deformation
Guo, C.; Guan, X.; Shi, L., and Qiu, S., 2018. The influence of earth pressure balanced shield tunnel underpassing coastal water body on stratum deformation. In: Liu, Z.L. and Mi, C. (eds.), Advances in Sustainable Port and Ocean Engineering. Journal of Coastal Research, Special Issue No. 83, pp. 237–246. Coconut Creek (Florida), ISSN 0749-0208. The complexity of construction technology and the surrounding soil environment of shield tunnel, especially the construction of soil pressure balanced shield tunnel in soft foundation, will inevitably cause the settlement of the overlying soil stratum and surface of tunnel. When there is coastal water body on the surface above the tunnel, it will change the distribution and size of pore water pressure in the soil stratum below the coastal water body, thus affecting the settlement of the overlying soil stratum of tunnel. However, most urban subway tunnels are double-tunnel single-track shield tunnels, and successive tunnel construction will also cause the change of settlement law. In this paper, based on the analytical solution of Verruijt and Booker, combining with the principle of stratum equivalent stiffness and the distribution and action of surface coastal water body, the formula for calculating the stratum settlement caused by the construction of double-tunnel single-track shield tunnel underpassing coastal water body was derived. Taking the shield tunnel in Chaoyang Park Station-Zaoying Station of Beijing Metro Line No. 14 Project underpassing the Chaoyang Park lake body as the research object, the settlement values of the original stratum were calculated by the derived formula, and the calculated settlement values were compared with the monitoring settlement values. The results showed that the calculated settlement values were in good agreement with the monitoring settlement values, which verified the rationality and applicability of the formula, thereby providing a basis and reference for similar projects in the future.
- 1 September 2018
- Published by Coastal Education and Research Foundation in Journal of Coastal Research
- Vol. 83 (sp1) , 237-246
The Influence of Earth Pressure Balanced Shield Tunnel Underpassing Coastal Water Body on Stratum Deformation
Guo, C.; Guan, X.; Shi, L., and Qiu, S., 2018. The influence of earth pressure balanced shield tunnel underpassing coastal water body on stratum deformation. In: Liu, Z.L. and Mi, C. (eds.), Advances in Sustainable Port and Ocean Engineering. Journal of Coastal Research, Special Issue No. 83, pp. 237–246. Coconut Creek (Florida), ISSN 0749-0208. The complexity of construction technology and the surrounding soil environment of shield tunnel, especially the construction of soil pressure balanced shield tunnel in soft foundation, will inevitably cause the settlement of the overlying soil stratum and surface of tunnel. When there is coastal water body on the surface above the tunnel, it will change the distribution and size of pore water pressure in the soil stratum below the coastal water body, thus affecting the settlement of the overlying soil stratum of tunnel. However, most urban subway tunnels are double-tunnel single-track shield tunnels, and successive tunnel construction will also cause the change of settlement law. In this paper, based on the analytical solution of Verruijt and Booker, combining with the principle of stratum equivalent stiffness and the distribution and action of surface coastal water body, the formula for calculating the stratum settlement caused by the construction of double-tunnel single-track shield tunnel underpassing coastal water body was derived. Taking the shield tunnel in Chaoyang Park Station-Zaoying Station of Beijing Metro Line No. 14 Project underpassing the Chaoyang Park lake body as the research object, the settlement values of the original stratum were calculated by the derived formula, and the calculated settlement values were compared with the monitoring settlement values. The results showed that the calculated settlement values were in good agreement with the monitoring settlement values, which verified the rationality and applicability of the formula, thereby providing a basis and reference for similar projects in the future.
- 6 February 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 553-568
Three-Dimensional Calculation on Vertical Soil Displacement of Shield Tunnel Induced by Ground Loss Considering Consolidation
The soil settlement or heave of shield tunnel caused by tunneling excavation is a three dimensional problem. Based on the previous research results, this paper proposed a three dimensional unified equation to calculate the vertical soil displacement induced by ground loss under non-synchronous construction for double-tube shield tunnels. The equation takes into account the lag time of construction and the effect of soil consolidation. Analyzed results showed that the following vertical soil displacement can be obtained simultaneously through the equation: (a) at ground surface and any depth of ground, (b) along transversal and longitudinal direction, (c) under non-synchronous and synchronous construction, and (d) for single-tube tunnel and double-tube tunnels. Meanwhile, the equation can be applied to illustrate the two-dimensional and three-dimensional curves of vertical soil displacement. Compared with the monitoring data of shield tunnel section between Zaoying Station and Dongfeng Beiqiao Station in Beijing Metro Line 14, the rationality and applicability of the proposed equation were verified. The influencing factors and changing tendency of vertical soil displacement for shield tunnel were investigated by adopting the equation.
- 6 February 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 553-568
Three-Dimensional Calculation on Vertical Soil Displacement of Shield Tunnel Induced by Ground Loss Considering Consolidation
The soil settlement or heave of shield tunnel caused by tunneling excavation is a three dimensional problem. Based on the previous research results, this paper proposed a three dimensional unified equation to calculate the vertical soil displacement induced by ground loss under non-synchronous construction for double-tube shield tunnels. The equation takes into account the lag time of construction and the effect of soil consolidation. Analyzed results showed that the following vertical soil displacement can be obtained simultaneously through the equation: (a) at ground surface and any depth of ground, (b) along transversal and longitudinal direction, (c) under non-synchronous and synchronous construction, and (d) for single-tube tunnel and double-tube tunnels. Meanwhile, the equation can be applied to illustrate the two-dimensional and three-dimensional curves of vertical soil displacement. Compared with the monitoring data of shield tunnel section between Zaoying Station and Dongfeng Beiqiao Station in Beijing Metro Line 14, the rationality and applicability of the proposed equation were verified. The influencing factors and changing tendency of vertical soil displacement for shield tunnel were investigated by adopting the equation.