BLBo Lei

Bo Lei

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Bo Lei has a total of 4 co-authors. Here are the top co-authors by number of shared publications:

  • Taiyue Qi

    School of Civil Engineering, Southwest Jiaotong University, Chengdu, China

    1 shared publication
  • Wangping Qian

    School of Mechanics and Civil Engineering, China University of Mining and Technology, Xuzhou 221116, China

    1 shared publication
  • Yan Li

    State Key Laboratory of Geo-hazard Prevention and Geo-environment Protection, Chengdu University of Technology, Chengdu, China

    1 shared publication
  • Zongyang Li

    Southwest Jiaotong University, Laboratory of Transportation Tunnel Engineering, Ministry of Education, Chengdu, China.;

    1 shared publication

Latest Publications

  • An iterative inversion method using transient electromagnetic data to predict water-filled caves during the excavation of a tunnel

    by Yan Li, Taiyue Qi, Bo Lei, Zongyang Li, Wangping Qian

    The correct interpretation of full-space transient electromagnetic data has always constituted a critical safety problem during tunnel excavation projects. Targeting the interpretation of water-filled caves under narrow tunnel conditions, we have developed an iterative inversion method based on 3D finite-difference time-domain (FDTD) forward calculations and a direction algorithm. In total, 125 groups of 3D FDTD forward calculation results are analyzed to identify the correlations between the response data and the geometric conditions of the cave. A direction algorithm is established based on the correlations, thereby increasing the iterative inversion convergence speed. Using the proposed iterative inversion method, the location and volume of the water-filled cave in front of the tunnel face are successfully inverted. Through an iterative program, the inversion results of simulations involving the detection of water-filled caves under tunnel conditions are accurately analyzed, and the relative error is less than 10%. The application of the iterative inversion method to the Mingyue Mountain Tunnel project suggests that this method is capable of interpreting the size of water-filled caves and it is valid for a narrow tunnel face with only a single available measurement point. The proposed iterative inversion method can be used alone or in combination with other detection techniques, thereby providing engineers with a better early warning system for detecting water-filled caves in tunnels.