Jing Bian
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Jing Bian has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Changyou Xu
Inner Mongolia Dian Tou Energy Corporation Limited, Tongliao 029200, China
1 shared publication - Gang Chen
State Power Investment Corporation Research Institute, Beijing 102209, China
1 shared publication - Huabo Lu
School of Transportation Science and Engineering, Beihang University, Beijing 100191, China
1 shared publication - Qiuxia Zhang
State Power Investment Corporation Research Institute, Beijing 102209, China
1 shared publication - Zhengke Liu
School of Transportation Science and Engineering, Beihang University, Beijing 100191, China
1 shared publication
Latest Publications
- Open Access
- 2 July 2024
- Published by MDPI AG in Mathematics
- Vol. 12 (13) , 2070
Integrated Optimization of Production Scheduling and Haulage Route Planning in Open-Pit Mines
In mining, deposits are divided into blocks, forming the basis for open-pit mine planning, covering production and haulage route planning. Current studies often stage optimization and lack the consideration of road capacity, leading to suboptimal solutions. A novel approach integrates production scheduling and haulage route planning through a bilevel optimization model. The upper-level model integrates ore mining constraints to establish a mixed-integer production scheduling model, minimizing haulage costs. Spatiotemporal correlation constraints for block mining are determined using a two-stage algorithm. The lower-level model incorporates road capacity, forming a haulage route optimization model based on multicommodity network flow. A solution algorithm with a distance penalty strategy facilitates feedback between the upper and lower levels, achieving optimal solutions. Tested on a real open-pit coal mine with over 5 million blocks, this approach reduces haulage costs by 10.06% compared to stage optimization. Additionally, this approach allows for adjusting haulage demand in both temporal and spatial dimensions, effectively preventing road congestion. This study advances rational mining processes and enhances the efficiency of open-pit mining haulage systems.
- 2 July 2024
- Published by MDPI AG in Mathematics
- Vol. 12 (13) , 2070
Open AccessIntegrated Optimization of Production Scheduling and Haulage Route Planning in Open-Pit Mines
In mining, deposits are divided into blocks, forming the basis for open-pit mine planning, covering production and haulage route planning. Current studies often stage optimization and lack the consideration of road capacity, leading to suboptimal solutions. A novel approach integrates production scheduling and haulage route planning through a bilevel optimization model. The upper-level model integrates ore mining constraints to establish a mixed-integer production scheduling model, minimizing haulage costs. Spatiotemporal correlation constraints for block mining are determined using a two-stage algorithm. The lower-level model incorporates road capacity, forming a haulage route optimization model based on multicommodity network flow. A solution algorithm with a distance penalty strategy facilitates feedback between the upper and lower levels, achieving optimal solutions. Tested on a real open-pit coal mine with over 5 million blocks, this approach reduces haulage costs by 10.06% compared to stage optimization. Additionally, this approach allows for adjusting haulage demand in both temporal and spatial dimensions, effectively preventing road congestion. This study advances rational mining processes and enhances the efficiency of open-pit mining haulage systems.