RARustem Alzhanov

Rustem Alzhanov

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Rustem Alzhanov has a total of 8 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Study of Potential Failure Points of Ventilation Shafts

    by Nurbol Bakhtybaev, Ravil Mussin, Rustem Alzhanov, Sholpan Zeitinova, Oraz Abil

    This study aims to identify potential failure zones in the ventilation shaft to enhance its safety and durability. The study involved parameter measurement, software modeling, finite element analysis, and analytical calculations. The study confirmed that loose ventilation pits pose a potential operational hazard. The creation of technological regulations for their fixation, including their specifics, proved necessary to ensure safety. The analysis of inelastic deformation zones using RocData and RS3 software revealed that RocData allowed a successful transition from laboratory rock characteristics to massive rock characteristics. At the same time, RS3 provided effective numerical modeling of the stress-strain state of rocks using the finite element method. The analysis results identified the areas of the ventilation shaft that are most vulnerable to failure under various loads, including wind forces, snow loads, and seismic activity. The application of a comprehensive approach, including assessment of the current condition, determination of load types, modeling and analysis of structural integrity, as well as the development of safety and strengthening measures, allowed us to formulate effective strategies for maintaining the safety of the ventilation shaft. Regular monitoring and inspection ensure the reliability and durability of the infrastructure. Based on the identified vulnerable areas, recommendations are developed to strengthen and protect the shaft structure. Proposed safety measures may include changing materials, adding reinforcements, or modifying the structure's geometry.


  • Жомарт 2 кенішінің геомеханикалық жағдайларын талдау

    by Н.б. Бахтыбаев, Р.х. Альжанов, Э.р. Халикова, С.с. Ефремова

    Статья посвящена изучению механических свойств руды и вмещающих пород, начиная со стадии разведки, рудника Жомарт II. Все накопленные данные проанализированы и сведены в таблицу. Представлены определения природного напряженного состояния массива и нарушенность массива разломами, в связи с чем приведены условия целесообразности заложения горных выработок при проектировании горных работ. В статье отражены сведения о нарушенности массива трещинами, а именно количество и процентное содержание крутопадающих, наклонных и пологих трещин; создана 3D геомеханическая блочная модель трещиноватости массива для прогноза нарушенности массива руды и непосредственной кровли. Произведена оценка жесткостей руды и вмещающей толщи пород для расчетов нагруженности целиков и процессов перераспределения горного давления при повторной разработке. Оценка сделана по скоростям упругих продольных и поперечных волн Мақала Жомарт II кенішінің барлау кезеңінен бастап кеннің және негізгі жыныстардың механикалық қасиеттерін зерттеуге арналған. Барлық жинақталған деректер талданады және кестеге келтіріледі. Массивтің табиғи кернеу күйінің анықтамалары және массивтің ақаулармен бұзылуы ұсынылған, осыған байланысты тау-кен жұмыстарын жобалау кезінде тау-кен қазбаларын салудың орындылығы шарттары келтірілген. Мақалада жарықтар массивінің бұзылуы туралы ақпарат, атап айтқанда тік құлаған, көлбеу және жұмсақ жарықтардың саны мен пайызы көрсетілген; кен массивінің және тікелей шатырдың бұзылуын болжау үшін массивтің жарылуының 3D геомеханикалық блок моделі жасалды. Кеннің қаттылығын және тау жыныстарының сыйымдылығын бағалау, қайта игеру кезінде тау қысымын қайта бөлу процестері мен бүтіндердің жүктемесін есептеу үшін жүргізілді. Бағалау серпімді бойлық және көлденең толқындардың жылдамдығымен жасалады The article is devoted to the study of the mechanical properties of ore and host rocks, starting from the exploration stage of the Jomart II mine. All accumulated data has been analyzed and tabulated. Definitions of the natural stress state of the massif and the disturbance of the massif by faults are presented, in connection with which the conditions for the expediency of laying mining workings in the design of mining operations are given. The article reflects information about the disturbance of the massif by cracks, namely the number and percentage of steeply falling, inclined and shallow cracks; A 3D geomechanical block model of the fracturing of the massif has been created to predict the disturbance of the ore massif and the immediate roof. The hardness of the ore and the host rock thickness was estimated to calculate the loading of the pillars and the processes of redistribution of rock pressure during re-mining. The estimation is based on the velocities of elastic longitudinal and transverse waves

  • Желдеткіш шурфтың аузын бекітуді әзірлеу

    by Р.а. Мусин, Н.б. Бахтыбаев, С.с. Ефремова, Р.х. Альжанов

    В данной статье рассмотрен способ крепления вентиляционного шурфа на месторождении Жаман-Айбат, Карагандинской области, т.к. в настоящее время стенки шурфа остаются незакрепленными. В условиях рудника Жомарт шурфы были пройдены задолго до возведения крепи, поэтому секционный способ крепления не может быть реализован для горных выработок. Исходя из зависимости параметров крепи основной части ствола, от действующих в массиве напряжений, выполняется оценка напряженно-деформированного состояния. Для данного рудника определена длина анкеров и расстояние между ними. Определена технология крепления бортов и устьев шурфов, расчитаны длина анкеров и толщина торкретбетона. Крепь шурфа должна состоять из двух частей: возле устья закреплена монолитной железобетонной крепью и основную часть ствола рекомендуется крепить комбинированной крепью Бұл мақалада Қарағанды облысы, Жаманай-Айбат кен орнында желдеткіш шурфты бекіту әдісі қарастырылған, себебі қазіргі уақытта шурфтың қабырғалары бекітілмеген күйінде қалып отыр. Жомарт кенішінің жағдайында шурфтар бекіткіш тұрғызылғанға дейін ұзақ уақыт өткен, сондықтан секциялық бекіту әдісін тау-кен қазбалары үшін іске асыру мүмкін емес. Магистральдың негізгі бөлігін бекіту параметрлерінің массивтегі кернеулерге тәуелділігіне сүйене отырып, кернеулі деформацияланған күйді бағалау жүргізіледі. Бұл кеніш үшін якорьдің ұзындығы және олардың арасындағы қашықтық анықталады. Шурфтардың бүйірлері мен сағаларын бекіту технологиясы анықталды, якорьдің ұзындығы мен бетон торкретінің қалыңдығы есептелді. Шурфтың бекіткіші екі бөліктен тұруы керек: сағаның жанында монолитті темірбетон бекіткішпен бекітілген және магистральдың негізгі бөлігін біріктірілген бекіткішпен бекіту ұсынылады This article discusses the method of fixing the ventilation pit at the Zhaman-Aybat deposit, Karaganda region, because at present the walls of the pit remain not fixed. In the conditions of the Zhomart mine, the pits were passed long before the construction of the support, so the sectional method of fastening cannot be implemented for mining. Based on the dependence of the parameters of the support of the main part of the trunk on the stresses acting in the array, the stress-strain state is evaluated. The length of the anchors and the distance between them are determined for this mine. The technology of fixing the sides and mouths of the pits is determined, the length of the anchors and the thickness of the shotcrete concrete are calculated. The pit support should consist of two parts: it is fixed near the mouth with a monolithic reinforced concrete support and it is recommended to attach the main part of the trunk with a combined support