Ngo Thanh Long
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Ngo Thanh Long has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
Nguyen Hoang Giang
Faculty of Mechanical Engineering, Hanoi University of Civil Engineering, 55 Giai Phong road, Hai Ba Trung district, Hanoi, Vietnam
3 shared publications- Hui Ping Tserng
Department of Civil Engineering, National Taiwan University, No. 1 Roosevelt Rd., Sec. 4, Taipei, Taiwan
1 shared publication - Huu Tung Pham
Institute of Environmental Technology, Vietnam Academy of Science and Technology, 18 Hoang Quoc Viet, Cau Giay, Ha Noi, Viet Nam
1 shared publication - Minh Tuan Nguyen
Institute of Environmental Technology, Vietnam Academy of Science and Technology, 18 Hoang Quoc Viet, Cau Giay, Hanoi 100000, Viet Nam
1 shared publication - Phuong Thao Nguyen
Institute of Environmental Technology, Vietnam Academy of Science and Technology, 18 Hoang Quoc Viet, Cau Giay, Ha Noi, Viet Nam
1 shared publication Samuel Yen-Liang Yin
Department of Civil Engineering, National Taiwan University, No. 1 Roosevelt Rd., Sec. 4, Taipei, Taiwan; Ruentex Group, 14F., No. 308, Section 2, Bade Road, Taipei, Taiwan
1 shared publication
Latest Publications
- 27 January 2025
- Published by Emerald Publishing in International Journal of Building Pathology and Adaptation
- Vol. 44 (2) , 454-466
An estimation of the crane safety risk factors in the Vietnamese construction industry
Purpose: Cranes are vital machinery in the construction industry, widely used on most construction sites. However, they are also among the most hazardous equipment, contributing to a significant number of serious accidents in Vietnam and globally. Although previous studies have identified and analysed crane safety risk factors, they often lack the use of quantitative data analysis to assess the risk levels of these factors. This paper aims to identify and evaluate crane safety risk factors within the Vietnamese construction industry. Design/methodology/approach: A well-structured questionnaire, utilizing a five-point Likert scale, was developed and distributed to 60 crane-related practitioners working in both southern and northern Vietnam. Findings: The study identified 59 crane safety risk factors in the Vietnamese construction industry. The most frequent factor is “Crane workers with stress due to time pressure,” while the factor “Crane with bad manufacture quality” has the highest severity. Additionally, the findings reveal that 50 out of 59 factors (84.74%) are classified as having a medium risk level, with “Crane with bad manufacture quality” exhibiting the highest risk level. Originality/value: This is the first study to apply quantitative data analysis to identify and evaluate crane safety risk factors in the Vietnamese construction industry. The methodology presented can also be adapted to estimate safety risk factors for other construction machinery in Vietnam.
- 27 January 2025
- Published by Emerald Publishing in International Journal of Building Pathology and Adaptation
- Vol. 44 (2) , 454-466
An estimation of the crane safety risk factors in the Vietnamese construction industry
Purpose: Cranes are vital machinery in the construction industry, widely used on most construction sites. However, they are also among the most hazardous equipment, contributing to a significant number of serious accidents in Vietnam and globally. Although previous studies have identified and analysed crane safety risk factors, they often lack the use of quantitative data analysis to assess the risk levels of these factors. This paper aims to identify and evaluate crane safety risk factors within the Vietnamese construction industry. Design/methodology/approach: A well-structured questionnaire, utilizing a five-point Likert scale, was developed and distributed to 60 crane-related practitioners working in both southern and northern Vietnam. Findings: The study identified 59 crane safety risk factors in the Vietnamese construction industry. The most frequent factor is “Crane workers with stress due to time pressure,” while the factor “Crane with bad manufacture quality” has the highest severity. Additionally, the findings reveal that 50 out of 59 factors (84.74%) are classified as having a medium risk level, with “Crane with bad manufacture quality” exhibiting the highest risk level. Originality/value: This is the first study to apply quantitative data analysis to identify and evaluate crane safety risk factors in the Vietnamese construction industry. The methodology presented can also be adapted to estimate safety risk factors for other construction machinery in Vietnam.
- Open Access
- 25 December 2024
- Published by Hanoi University of Civil Engineering (HUCE) in Journal of Science and Technology in Civil Engineering
- Vol. 18 (4) , 83–97
Causes of crane safety risk in the Vietnamese construction industry
Crane is one of the most important machineries in the construction field. They are used to move large or heavy loads on most construction sites. However, crane operations in construction are very dangerous activities and contribute to a big ratio of serious accidents around the world and in Vietnam. The paper aimed to identify and evaluate crane safety risk causes as well as groups of causes in the Vietnamese construction industry. The paperevaluated from the perspective of various related people involved in crane activities, namely drivers, managers,and workers. A well-structured questionnaire using a five-point Likert scale was produced and sent to collectdata from 60 valid crane-related practitioners. The paper finds 59 specific causes that give rise to crane safety risks in the Vietnamese construction industry. However, there are noteworthy differences in answers from managers, drivers, and workers. The managers, drivers, and workers showed the most common safety risks“Stress of crane workers due to time pressure”, “Insufficient safety awareness and behavior of crane workers”, and “Subcontractor does not establish safety funds for the construction safety”, respectively. They pointed out that “Crane manufacturers with bad manufacturing quality” are the most severe cause of safety risk. The managers, drivers, and workers also showed the highest safety risk level of cause “Stress of crane workers due to time pressure”, “Insufficient supervise of main contractor for the crane foundation and installation task”, and “Government lacks a good implementation of certificate management and graduation for crane operators”,respectively. Crane management of construction site-related causes is the most common safety risk and the highest safety risk level. Regulatory bodies and stakeholders-related causes have the highest degree of severity.
- 25 December 2024
- Published by Hanoi University of Civil Engineering (HUCE) in Journal of Science and Technology in Civil Engineering
- Vol. 18 (4) , 83–97
Open AccessCauses of crane safety risk in the Vietnamese construction industry
Crane is one of the most important machineries in the construction field. They are used to move large or heavy loads on most construction sites. However, crane operations in construction are very dangerous activities and contribute to a big ratio of serious accidents around the world and in Vietnam. The paper aimed to identify and evaluate crane safety risk causes as well as groups of causes in the Vietnamese construction industry. The paperevaluated from the perspective of various related people involved in crane activities, namely drivers, managers,and workers. A well-structured questionnaire using a five-point Likert scale was produced and sent to collectdata from 60 valid crane-related practitioners. The paper finds 59 specific causes that give rise to crane safety risks in the Vietnamese construction industry. However, there are noteworthy differences in answers from managers, drivers, and workers. The managers, drivers, and workers showed the most common safety risks“Stress of crane workers due to time pressure”, “Insufficient safety awareness and behavior of crane workers”, and “Subcontractor does not establish safety funds for the construction safety”, respectively. They pointed out that “Crane manufacturers with bad manufacturing quality” are the most severe cause of safety risk. The managers, drivers, and workers also showed the highest safety risk level of cause “Stress of crane workers due to time pressure”, “Insufficient supervise of main contractor for the crane foundation and installation task”, and “Government lacks a good implementation of certificate management and graduation for crane operators”,respectively. Crane management of construction site-related causes is the most common safety risk and the highest safety risk level. Regulatory bodies and stakeholders-related causes have the highest degree of severity.
- Open Access
- 25 September 2024
- Published by Hanoi University of Civil Engineering (HUCE) in Journal of Science and Technology in Civil Engineering
- Vol. 18 (3) , 60–75
An estimation of the tower crane safety risk factors in the Vietnamese construction industry
The construction industry is among the riskiest sectors worldwide due to its involvement in complex and hazardous activities, primarily because of the use of tower cranes. Tower cranes are considered the most hazardous construction machinery, contributing to a high rate of serious accidents, including fatalities and disabling injuries, not only in Vietnam but also globally. In this paper, we identify and evaluate 42 tower crane safety risk factors specific to the Vietnamese construction industry based on their probability of occurrence, severity of impact, and associated risk levels. The paper reveals that the most probable risk factor is “Unfavorable winds (including intensity, direction, etc.)” with a mean value of 3.641. The factor with the highest severity is “Wire rope is broken” with a mean value of 4.179. Furthermore, the study shows that twenty-five out of forty-two (59.52%) factors present a moderate risk level, with a Relative Significant Index Score (RSIS) ranging from 8.019 to 13.047. Among these, the factor “Bad maintenance management of the tower crane and auxiliary aids” poses the highest risk level, with an RSIS value of 13.047. This paper aims to enhance the understanding oftower crane safety among subcontractors, government safety regulators, main contractors, maintenance personnel, and workers in the Vietnamese construction industry. Additionally, the methodology presented in this paper can be adapted for assessing safety risk factors in other industries within Vietnam.
- 25 September 2024
- Published by Hanoi University of Civil Engineering (HUCE) in Journal of Science and Technology in Civil Engineering
- Vol. 18 (3) , 60–75
Open AccessAn estimation of the tower crane safety risk factors in the Vietnamese construction industry
The construction industry is among the riskiest sectors worldwide due to its involvement in complex and hazardous activities, primarily because of the use of tower cranes. Tower cranes are considered the most hazardous construction machinery, contributing to a high rate of serious accidents, including fatalities and disabling injuries, not only in Vietnam but also globally. In this paper, we identify and evaluate 42 tower crane safety risk factors specific to the Vietnamese construction industry based on their probability of occurrence, severity of impact, and associated risk levels. The paper reveals that the most probable risk factor is “Unfavorable winds (including intensity, direction, etc.)” with a mean value of 3.641. The factor with the highest severity is “Wire rope is broken” with a mean value of 4.179. Furthermore, the study shows that twenty-five out of forty-two (59.52%) factors present a moderate risk level, with a Relative Significant Index Score (RSIS) ranging from 8.019 to 13.047. Among these, the factor “Bad maintenance management of the tower crane and auxiliary aids” poses the highest risk level, with an RSIS value of 13.047. This paper aims to enhance the understanding oftower crane safety among subcontractors, government safety regulators, main contractors, maintenance personnel, and workers in the Vietnamese construction industry. Additionally, the methodology presented in this paper can be adapted for assessing safety risk factors in other industries within Vietnam.
- Open Access
- 16 August 2024
- Published by Publishing House for Science and Technology, Vietnam Academy of Science and Technology (Publications) in Vietnam Journal of Science and Technology
- Vol. 62 (4) , 775-786
Ammonia removal from digested swine wastewater using a High-Performance Rotating Reactor
The wastewater generated from the livestock industry is an enormous source of pollution that is challenging the sustainable development of the agricultural sector. Even the anaerobic digestion is adopted, the characteristic of the digested wastewater is still way polluted compared to the discharge standard. The high content of ammonia in this wastewater resulted in a low C/N ratio, consequently inhibiting the aerobic biological treatment. Hence, it is necessary to pretreat the excessive concentration of ammonia from the input stream of livestock wastewater. The High-Performance Rotating Reactor (HP2R) equipment has been proven to be a promising and advanced equipment to remove high concentrations of ammonia from synthetic wastewater via stripping. Therefore, ammonia removal using HP2R equipment was comprehensively studied with the digested swine wastewater under various operational conditions. In this study, the effects of pre-alkalinization (pHi), rotating speed (ω), gas flow rate (QG), and swine wastewater flow rate (QL) on the ammonia removal efficiency (ARE) and the overall liquid mass transfer coefficient (KLa) was evaluated. The results indicated that the HP2R could effectively remove ammonia from the wastewater in instant batch mode at a laboratory scale. The ARE by stripping via HP2R varied from 33% to 78% at various gas and liquid flow rate with the pre-alkalinization of swine wastewater pHi of 11, ω of 900-1200 rpm, and the initial ammonia concentration of approximately 660 mg/L. Especially, the mass transfer of the process was enhanced compared to the conventional packed column as the KLa varied from 0.0014 s-1 to 0.0038 s-1.
- 16 August 2024
- Published by Publishing House for Science and Technology, Vietnam Academy of Science and Technology (Publications) in Vietnam Journal of Science and Technology
- Vol. 62 (4) , 775-786
Open AccessAmmonia removal from digested swine wastewater using a High-Performance Rotating Reactor
The wastewater generated from the livestock industry is an enormous source of pollution that is challenging the sustainable development of the agricultural sector. Even the anaerobic digestion is adopted, the characteristic of the digested wastewater is still way polluted compared to the discharge standard. The high content of ammonia in this wastewater resulted in a low C/N ratio, consequently inhibiting the aerobic biological treatment. Hence, it is necessary to pretreat the excessive concentration of ammonia from the input stream of livestock wastewater. The High-Performance Rotating Reactor (HP2R) equipment has been proven to be a promising and advanced equipment to remove high concentrations of ammonia from synthetic wastewater via stripping. Therefore, ammonia removal using HP2R equipment was comprehensively studied with the digested swine wastewater under various operational conditions. In this study, the effects of pre-alkalinization (pHi), rotating speed (ω), gas flow rate (QG), and swine wastewater flow rate (QL) on the ammonia removal efficiency (ARE) and the overall liquid mass transfer coefficient (KLa) was evaluated. The results indicated that the HP2R could effectively remove ammonia from the wastewater in instant batch mode at a laboratory scale. The ARE by stripping via HP2R varied from 33% to 78% at various gas and liquid flow rate with the pre-alkalinization of swine wastewater pHi of 11, ω of 900-1200 rpm, and the initial ammonia concentration of approximately 660 mg/L. Especially, the mass transfer of the process was enhanced compared to the conventional packed column as the KLa varied from 0.0014 s-1 to 0.0038 s-1.
- Open Access
- 25 December 2023
- Published by Hanoi University of Civil Engineering (HUCE) in Journal of Science and Technology in Civil Engineering
- Vol. 17 (4) , 109-121
Causes of safety risk during tower crane operations on construction sites in Vietnam
The construction industry holds significant importance for any nation; however, it remains a high-risk sector characterized by a significant number of fatalities and grave injuries. Among these risks, tower crane operations stand out as a leading contributor to the heightened risk rate. This research paper endeavors to assess the safety risks inherent in tower crane operations at construction sites in Vietnam. This assessment is conducted from the perspective of various stakeholders involved in tower crane activities, namely managers, operators, and workers. To achieve this, a meticulously structured questionnaire utilizing a five-point Likert scale was formulated and distributed to gather insights from 78 proficient individuals engaged in tower crane-related tasks. The outcomes from all participants collectively underscore 21 distinct causes that give rise to safety risks during tower crane operations in Vietnam. Nonetheless, noticeable differences in opinions appear when looking at answers from managers, operators, and workers. The operators and workers showed that “Winds (wind intensity seriously affects the lifted load and tower crane itself)” are the most common safety risk. On the other hand, the managers highlighted the issue of whether the “Tower crane operator is an in-house staff member or outsourced” as their main concern. The managers, operators and workers showed that “Experience and skills of the operator during operating tower crane”, “Maintenance management degree of the tower crane and lifting aids”, and “Overhead power lines in the tower crane’s work region” are the most severe cause of safety risk, respectively. Operators and workers pointed out that the "Degree of maintenance management for tower cranes and lifting aids"has the highest safety risk level. However, managers highlighted that “Winds (wind intensity seriously affects the lifted load and tower crane itself)” pose the highest safety risk level.
- 25 December 2023
- Published by Hanoi University of Civil Engineering (HUCE) in Journal of Science and Technology in Civil Engineering
- Vol. 17 (4) , 109-121
Open AccessCauses of safety risk during tower crane operations on construction sites in Vietnam
The construction industry holds significant importance for any nation; however, it remains a high-risk sector characterized by a significant number of fatalities and grave injuries. Among these risks, tower crane operations stand out as a leading contributor to the heightened risk rate. This research paper endeavors to assess the safety risks inherent in tower crane operations at construction sites in Vietnam. This assessment is conducted from the perspective of various stakeholders involved in tower crane activities, namely managers, operators, and workers. To achieve this, a meticulously structured questionnaire utilizing a five-point Likert scale was formulated and distributed to gather insights from 78 proficient individuals engaged in tower crane-related tasks. The outcomes from all participants collectively underscore 21 distinct causes that give rise to safety risks during tower crane operations in Vietnam. Nonetheless, noticeable differences in opinions appear when looking at answers from managers, operators, and workers. The operators and workers showed that “Winds (wind intensity seriously affects the lifted load and tower crane itself)” are the most common safety risk. On the other hand, the managers highlighted the issue of whether the “Tower crane operator is an in-house staff member or outsourced” as their main concern. The managers, operators and workers showed that “Experience and skills of the operator during operating tower crane”, “Maintenance management degree of the tower crane and lifting aids”, and “Overhead power lines in the tower crane’s work region” are the most severe cause of safety risk, respectively. Operators and workers pointed out that the "Degree of maintenance management for tower cranes and lifting aids"has the highest safety risk level. However, managers highlighted that “Winds (wind intensity seriously affects the lifted load and tower crane itself)” pose the highest safety risk level.
- Open Access
- 9 June 2014
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 20 (3) , 389-403
AN IMPROVED APPROACH TO THE SUBCONTRACTING PROCUREMENT PROCESS IN A LEAN CONSTRUCTION SETTING
The subcontracting procurement process is one of the most important issues impacting the costs of engineering projects and construction projects, in particular. Traditional procedures of subcontracting procurement tend to limit the opportunities for price negotiation and cooperative relationships between contractors and neglect potential issues such as engineering interface, construction risk, and waste. Based on case studies of construction projects, we propose a “lean” subcontracting procurement process (LSPP) drawing from lean construction theory. The process consists of a novel Seven-Arrangement operation plan and four types of standard operating flows. Not only does the proposed LSPP help sub-contractors eliminate various types of waste in construction projects, it also establishes a common information platform and cooperative environment that help participating contractors understand the work emphasis of each operation and the whole operation in sequence. As a result, the relationships between participating contractors become cooperative, potential risks in construction projects can be discovered early, and profits are shared between contractors. Thus, this process allows contractors to obtain long-term benefits.
- 9 June 2014
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 20 (3) , 389-403
Open AccessAN IMPROVED APPROACH TO THE SUBCONTRACTING PROCUREMENT PROCESS IN A LEAN CONSTRUCTION SETTING
The subcontracting procurement process is one of the most important issues impacting the costs of engineering projects and construction projects, in particular. Traditional procedures of subcontracting procurement tend to limit the opportunities for price negotiation and cooperative relationships between contractors and neglect potential issues such as engineering interface, construction risk, and waste. Based on case studies of construction projects, we propose a “lean” subcontracting procurement process (LSPP) drawing from lean construction theory. The process consists of a novel Seven-Arrangement operation plan and four types of standard operating flows. Not only does the proposed LSPP help sub-contractors eliminate various types of waste in construction projects, it also establishes a common information platform and cooperative environment that help participating contractors understand the work emphasis of each operation and the whole operation in sequence. As a result, the relationships between participating contractors become cooperative, potential risks in construction projects can be discovered early, and profits are shared between contractors. Thus, this process allows contractors to obtain long-term benefits.