MWMengze Wu

Mengze Wu

*This is an algorithmically generated author record based on publicly available information.

Mengze Wu has a total of 6 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Whole Life Cycle for Tracking Higher Education Infrastructure Project Audit Through the Use of BIM Technology in China

    by Yingying He, Yujie Wu, Dongxue Li, Mengze Wu, Yi Liu

    Despite the increasing adoption of building information modeling (BIM) in higher education infrastructure projects, limited research has systematically identified which project stages and enabling factors most critically enhance audit efficiency from the perspective of audit practitioners. Moreover, existing studies lack a multi‐criteria framework that links BIM functionalities to whole life cycle audit performance in public sector educational projects. This study expands the application of BIM technology beyond its conventional use in engineering projects to the audit of infrastructure projects in higher education. This study examines the benefits, drawbacks and challenges of higher education infrastructure projects in China, alongside their whole life cycle audit. By employing a comprehensive weighting method, the study identifies the impact of different indicators at various criterion levels on enhancing the audit efficiency of higher education auditing. Additionally, the TOPSIS method is utilised to analyse the results. The results indicate that the design stage is the most significant stage for employing BIM technology to enhance audit efficiency throughout the life cycle of the project. This finding contributes to the body of knowledge by proposing a weighted multi‐criteria evaluation framework for BIM‐enabled auditing. It also offers practical guidance for auditors and facility managers to prioritise resources at the design stage and provides policymakers with evidence‐based support for promoting BIM adoption in public higher education audits.

  • Open Access

    Decision‐Making Evaluation and Optimization Strategies for Construction EPC Project Developers Utilizing BIM Technology

    by Yujie Wu, Xiaoming He, Tianyi Cui, Mengze Wu

    In the context of the advancing construction engineering field in China, there has been a significant increase in the adoption of building information modeling (BIM) technology within engineering–procurement–construction (EPC) projects. This emerging technology is expected to significantly influence the decision‐making practices of professionals in the construction and engineering domain. Consequently, there is an urgent need for comprehensive research focused on construction management specifically pertaining to the effectiveness of construction developer management. This study examines seven representative EPC projects where BIM technology was implemented and it considers various factors that have the potential to influence project decision‐making while taking into account time and cost considerations. A comprehensive multidimensional evaluation method that combines the analytic hierarchy process (AHP) and the fuzzy comprehensive evaluation method is introduced in this study. The results of this study emphasize that the efficiency enhancement strategies derived from the judgment indicator method demonstrate favorable practical outcomes. This research highlights the importance of a comprehensive evaluation method combining the AHP and the fuzzy comprehensive evaluation method to enhance decision‐making efficiency for construction developer management staff.