Muhirwa Fernand
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Muhirwa Fernand has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
- Georges Irankunda
School of Civil and Hydraulic Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
2 shared publications - Wei Zhang
Department of Civil and Hydraulic Engineering, Huazhong University of Science and Technology (HUST), Wuhan 430074, China
2 shared publications Zhenjun Yang
2 shared publications- Byiringiro David
School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan 430070, China
1 shared publication - Irakoze Jean Paul
School of Civil Engineering and Architecture, Wuhan University of Technology 2 , 122# Luoshi Rd., Hongshan District, Wuhan 430074, Hubei Province
1 shared publication - Jianrong Zhang
School of Civil and Hydraulic Engineering, Huazhong University of Science and Technology, Wuhan, China
1 shared publication
Latest Publications
- 27 May 2026
- Published by ASTM International in Journal of Testing and Evaluation
- Vol. 54 (5)
Toward Advanced Field-Evaluation Methods for Load Transfer (LT) Capacity in Portland Cement Concrete Pavements (PCCPs): A Review
Portland cement concrete pavements (PCCPs) are widely used for their durability, long service life, and ability to withstand heavy traffic. To ensure performance and reduce maintenance costs, regular evaluation of joint load transfer (LT) capacity is essential. Traditional destructive tests (DTs) provide direct LT data but are localized, time-consuming, costly, and damaging to the pavement. In contrast, nondestructive tests (NDTs) allow broader and non-invasive evaluation, though they require careful interpretation. NDT methods can be divided into discrete and continuous testing devices. Discrete devices, such as the Benkelman beam deflectometer and falling weight deflectometer, stop to apply forces and measure deflections at selected locations. Continuous devices, including the rolling dynamic deflectometer (RDD), rolling weight deflectometer (RWD), and traffic speed deflectometer (TSD), measure pavement deflections while moving at traffic speeds. These continuous systems offer significant advantages by enabling large-scale, traffic speed assessment; however, they generate vast datasets that pose challenges in processing, calibration, and test condition sensitivity. Recent advancements are improving the accuracy and efficiency of LT assessment. Modern high-speed deflectometers integrate advanced technologies such as Doppler velocity sensors for real-time monitoring, ground-penetrating radar for subsurface characterization, traffic-induced excitation as an alternative to impulse loading, and machine learning algorithms for automated data processing. Further, artificial intelligence combined with geographic information systems enhances pavement management systems, enabling smarter decision-making and cost-effective maintenance planning. Future developments in LT evaluation are expected to focus on refining RDD, RWD, and TSD technologies, improving calibration protocols, integrating multi-sensor data, and establishing standardized procedures. Special attention should also be given to applying these advanced methods to precast concrete pavements, where joint performance plays a critical role in service life. Overall, emerging NDT solutions offer great potential for more reliable, efficient, and sustainable pavement monitoring.
- 27 May 2026
- Published by ASTM International in Journal of Testing and Evaluation
- Vol. 54 (5)
Toward Advanced Field-Evaluation Methods for Load Transfer (LT) Capacity in Portland Cement Concrete Pavements (PCCPs): A Review
Portland cement concrete pavements (PCCPs) are widely used for their durability, long service life, and ability to withstand heavy traffic. To ensure performance and reduce maintenance costs, regular evaluation of joint load transfer (LT) capacity is essential. Traditional destructive tests (DTs) provide direct LT data but are localized, time-consuming, costly, and damaging to the pavement. In contrast, nondestructive tests (NDTs) allow broader and non-invasive evaluation, though they require careful interpretation. NDT methods can be divided into discrete and continuous testing devices. Discrete devices, such as the Benkelman beam deflectometer and falling weight deflectometer, stop to apply forces and measure deflections at selected locations. Continuous devices, including the rolling dynamic deflectometer (RDD), rolling weight deflectometer (RWD), and traffic speed deflectometer (TSD), measure pavement deflections while moving at traffic speeds. These continuous systems offer significant advantages by enabling large-scale, traffic speed assessment; however, they generate vast datasets that pose challenges in processing, calibration, and test condition sensitivity. Recent advancements are improving the accuracy and efficiency of LT assessment. Modern high-speed deflectometers integrate advanced technologies such as Doppler velocity sensors for real-time monitoring, ground-penetrating radar for subsurface characterization, traffic-induced excitation as an alternative to impulse loading, and machine learning algorithms for automated data processing. Further, artificial intelligence combined with geographic information systems enhances pavement management systems, enabling smarter decision-making and cost-effective maintenance planning. Future developments in LT evaluation are expected to focus on refining RDD, RWD, and TSD technologies, improving calibration protocols, integrating multi-sensor data, and establishing standardized procedures. Special attention should also be given to applying these advanced methods to precast concrete pavements, where joint performance plays a critical role in service life. Overall, emerging NDT solutions offer great potential for more reliable, efficient, and sustainable pavement monitoring.
- Open Access
Understanding Critical Delay Causative Factors and Their Mitigation Measures in Burundi Communal Construction Projects: A Factor Analysis and Structural Equation Modeling Approach
The execution of a construction project faces many potentials challenges, and delays are one of them. Communal construction projects in Burundi (CCP-Burundi projects) were considered as one field that could generate a Burundi government development plan. However, according to the frequency of delays encountered by these projects, at a rate of 70% on average every year, the government’s target seems far from being achieved. As no scientific study exists on how to avoid CCP delays, this paper aims to identify and analyze factors that cause delays in CCP-Burundi and provide related measures to overcome them. Based on a list of fifty delay factors gathered from the National Communal Investment Fund institution FONIC (Fond National d’Investissement Communal), communal annual reports, and the literature, a questionnaire survey was developed and dispersed to CCP stakeholders to collect data about critical factors. The top fifteen factors were identified using a relative importance index and a factor analysis was performed. “Weather conditions” was the top-ranked factor, while “Claims” was the lowest ranked. A structural equation modeling approach was adopted to evaluate influences at the relationship level among delay factor groups. A standardized calculation revealed that Factors During Awarding of Bid (FDABs) positively influence Factors After the Award of Bid (FAABs). The findings were implemented in case studies to assess their efficacy. This paper’s findings could assist upcoming construction practitioners and future researchers aiming to explore construction-related project delays, providing a fundamental understanding of the significant delays encountered in the Burundi construction industry.
Open AccessUnderstanding Critical Delay Causative Factors and Their Mitigation Measures in Burundi Communal Construction Projects: A Factor Analysis and Structural Equation Modeling Approach
The execution of a construction project faces many potentials challenges, and delays are one of them. Communal construction projects in Burundi (CCP-Burundi projects) were considered as one field that could generate a Burundi government development plan. However, according to the frequency of delays encountered by these projects, at a rate of 70% on average every year, the government’s target seems far from being achieved. As no scientific study exists on how to avoid CCP delays, this paper aims to identify and analyze factors that cause delays in CCP-Burundi and provide related measures to overcome them. Based on a list of fifty delay factors gathered from the National Communal Investment Fund institution FONIC (Fond National d’Investissement Communal), communal annual reports, and the literature, a questionnaire survey was developed and dispersed to CCP stakeholders to collect data about critical factors. The top fifteen factors were identified using a relative importance index and a factor analysis was performed. “Weather conditions” was the top-ranked factor, while “Claims” was the lowest ranked. A structural equation modeling approach was adopted to evaluate influences at the relationship level among delay factor groups. A standardized calculation revealed that Factors During Awarding of Bid (FDABs) positively influence Factors After the Award of Bid (FAABs). The findings were implemented in case studies to assess their efficacy. This paper’s findings could assist upcoming construction practitioners and future researchers aiming to explore construction-related project delays, providing a fundamental understanding of the significant delays encountered in the Burundi construction industry.
- Retracted
- 10 January 2025
- Published by Elsevier in Engineering Structures
- Vol. 327
RETRACTED: Structural and microstructural behavior of novel 3DP-UHPFRC beam with discrete steel fibers and steel-FRP composite bar
- 10 January 2025
- Published by Elsevier in Engineering Structures
- Vol. 327
RetractedRETRACTED: Structural and microstructural behavior of novel 3DP-UHPFRC beam with discrete steel fibers and steel-FRP composite bar
- Open Access
- 10 October 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (20) , 8735
Assessing the Resilience of Critical Infrastructure Facilities toward a Holistic and Theoretical Approach: A Multi-Scenario Evidence and Case Study
Given the increasing frequency of natural disasters, which result in substantial damage to critical infrastructures and disrupt the functioning of modern societies, numerous studies have been conducted in recent decades to propose sustainable preventive and enhancement measures to safeguard the environmental and societal development. This paper contributes to the existing literature by introducing a novel environmentally conscious infrastructural resilience assessment approach named the Novel Infrastructure Resilience Assessment Curve (NIRAC). Unlike past works which typically focused on a single infrastructure scenario, the NIRAC is conceptualized around multi-scenario resilience assets, integrating sustainable principles to enhance environmental resilience. Additionally, this paper presents a road infrastructure resilience assessment (RIRA) framework, developed from factors and dimensions pertinent to road infrastructure resilience and environmental sustainability. The RIRA framework is applied to a case study of a road damaged by heavy rains, emphasizing the need for sustainable recovery efforts which minimize environmental impact. The results demonstrate the effectiveness of the RIRA framework in guiding road recovery efforts. The insights provided in this paper are valuable for disaster managers and policymakers, as they extend their resilience assessment knowledge with a focus on sustainable development and environmental protection. This expanded knowledge facilitates the implementation of appropriate interventions to prevent and mitigate the societal consequences of disasters more efficiently.
- 10 October 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (20) , 8735
Open AccessAssessing the Resilience of Critical Infrastructure Facilities toward a Holistic and Theoretical Approach: A Multi-Scenario Evidence and Case Study
Given the increasing frequency of natural disasters, which result in substantial damage to critical infrastructures and disrupt the functioning of modern societies, numerous studies have been conducted in recent decades to propose sustainable preventive and enhancement measures to safeguard the environmental and societal development. This paper contributes to the existing literature by introducing a novel environmentally conscious infrastructural resilience assessment approach named the Novel Infrastructure Resilience Assessment Curve (NIRAC). Unlike past works which typically focused on a single infrastructure scenario, the NIRAC is conceptualized around multi-scenario resilience assets, integrating sustainable principles to enhance environmental resilience. Additionally, this paper presents a road infrastructure resilience assessment (RIRA) framework, developed from factors and dimensions pertinent to road infrastructure resilience and environmental sustainability. The RIRA framework is applied to a case study of a road damaged by heavy rains, emphasizing the need for sustainable recovery efforts which minimize environmental impact. The results demonstrate the effectiveness of the RIRA framework in guiding road recovery efforts. The insights provided in this paper are valuable for disaster managers and policymakers, as they extend their resilience assessment knowledge with a focus on sustainable development and environmental protection. This expanded knowledge facilitates the implementation of appropriate interventions to prevent and mitigate the societal consequences of disasters more efficiently.