Jack Acres
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Jack Acres has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
Daniel Blackburn
1 shared publication- Daniel Blackburn
UKAEA (United Kingdom Atomic Energy Authority), Culham Campus , Abingdon, Oxfordshire OX14 3DB, UK
1 shared publication Dhinesh Thanganadar
1 shared publication- Finlay Christie
United Kingdom Atomic Energy Authority (UKAEA), Culham, U.K.
1 shared publication Ioannis Antoniou
1 shared publication- Ioannis Antoniou
United Kingdom Atomic Energy Authority (UKAEA), Culham, U.K.
1 shared publication
Latest Publications
- Open Access
- 18 April 2025
- Published by Elsevier in Fusion Engineering and Design
- Vol. 216
Investigating dynamic scenarios of a spherical tokamak fusion power plant
- 18 April 2025
- Published by Elsevier in Fusion Engineering and Design
- Vol. 216
Open AccessInvestigating dynamic scenarios of a spherical tokamak fusion power plant
- Open Access
- 26 August 2024
- Published by The Royal Society in Philosophical Transactions of the Royal Society A: Mathematical, Physical and Engineering Sciences
- Vol. 382 (2280) , 20230404
Staying positive: producing net power
The Spherical Tokamak for Energy Production (STEP) prototype powerplant (SPP) will be a first-of-a-kind powerplant—its prime objective is to export electrical power, to the national power transmission system (‘grid’), above 100 MWe. As part of a wider issue, addressing the STEP concept design, this article seeks to explore how electrical power will be generated from a spherical tokamak heat source. Accordingly, the following key functions of the SPP power infrastructure are reviewed. Cooling the tokamak : cooling the tokamak while extracting useful thermal energy. Generating power : conversion of thermal energy to electrical energy (power generation). Managing energy : management of the site-wide distribution, storage and energy export. In each of these areas, the design scope, challenges and solution spaces have been discussed. This has shaped the design of the SPP power infrastructure, which in turn has ensured a powerplant design focused on operability and performance. Furthermore, it has been demonstrated that the SPP will achieve its prime objective in generating net power, which is enabled by a unique power infrastructure. Confidence in the ability to generate net power will be refined as the design matures. Finally, this article recommends key opportunities that STEP could use to improve power generation and reduce the parasitic load of the SPP. This article is part of the theme issue ‘Delivering Fusion Energy – The Spherical Tokamak for Energy Production (STEP)’.
- 26 August 2024
- Published by The Royal Society in Philosophical Transactions of the Royal Society A: Mathematical, Physical and Engineering Sciences
- Vol. 382 (2280) , 20230404
Open AccessStaying positive: producing net power
The Spherical Tokamak for Energy Production (STEP) prototype powerplant (SPP) will be a first-of-a-kind powerplant—its prime objective is to export electrical power, to the national power transmission system (‘grid’), above 100 MWe. As part of a wider issue, addressing the STEP concept design, this article seeks to explore how electrical power will be generated from a spherical tokamak heat source. Accordingly, the following key functions of the SPP power infrastructure are reviewed. Cooling the tokamak : cooling the tokamak while extracting useful thermal energy. Generating power : conversion of thermal energy to electrical energy (power generation). Managing energy : management of the site-wide distribution, storage and energy export. In each of these areas, the design scope, challenges and solution spaces have been discussed. This has shaped the design of the SPP power infrastructure, which in turn has ensured a powerplant design focused on operability and performance. Furthermore, it has been demonstrated that the SPP will achieve its prime objective in generating net power, which is enabled by a unique power infrastructure. Confidence in the ability to generate net power will be refined as the design matures. Finally, this article recommends key opportunities that STEP could use to improve power generation and reduce the parasitic load of the SPP. This article is part of the theme issue ‘Delivering Fusion Energy – The Spherical Tokamak for Energy Production (STEP)’.