Nikola Budimir
Research Subjects
Nikola Budimir has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Marko Jarić
Innovation Centre of the Faculty of Mechanical Engineering, University of Belgrade, 11120 Belgrade, Serbia
1 shared publication Nikola Vitas
1 shared publication- Sanja Petronić
Institute of General and Physical Chemistry, 11158 Belgrade, Serbia
1 shared publication - Simon Sedmak
Innovation Centre of the Faculty of Mechanical Engineering, Belgrade, Serbia
1 shared publication
Latest Publications
- 15 May 2024
- Published by Society for Structural Integrity and Life "Prof. dr Stojan Sedmak" in Structural Integrity and Life
- Vol. 24 (1) , 111-115
Analysis of remediation of manifold line damaged by longitudinal crack in the piping elbow of oil and gas well collector
The paper deals with damage mechanisms affecting the piping and piping elements during working life of the well collector as an integral part of the upstream plant. An initiated crack has propagated in the vertical piping elbow and caused leakage. The damaged elbow has a sensitive cut, and a new elbow is welded onto the pipe by GTAW and SMAW processes. Necessary NDE was performed after repair welding activities showing that remediation of the line is properly conducted. The line is successfully put into service.
- 15 May 2024
- Published by Society for Structural Integrity and Life "Prof. dr Stojan Sedmak" in Structural Integrity and Life
- Vol. 24 (1) , 111-115
Analysis of remediation of manifold line damaged by longitudinal crack in the piping elbow of oil and gas well collector
The paper deals with damage mechanisms affecting the piping and piping elements during working life of the well collector as an integral part of the upstream plant. An initiated crack has propagated in the vertical piping elbow and caused leakage. The damaged elbow has a sensitive cut, and a new elbow is welded onto the pipe by GTAW and SMAW processes. Necessary NDE was performed after repair welding activities showing that remediation of the line is properly conducted. The line is successfully put into service.