NLNaufal Budi Laksono

Naufal Budi Laksono

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Naufal Budi Laksono has a total of 16 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • A knowledge-based approach to UAV path planning for bridge maintenance in a digital twin environment

    by Naufal Budi Laksono, Yusuf Latief, Bambang Trigunarsyah, Kim Sunkuk, Nyoman Suaryana

  • Open Access

    A Knowledge-Based Approach to UAV Path Planning for Bridge Maintenance in a Digital Twin Environment

    by Naufal Budi Laksono, Yusuf Latief, Bambang Trigunarsyah, Kim Sunkuk, Nyoman Suaryana

    Unmanned aerial vehicles (UAVs) are increasingly used for bridge inspection to reduce hazardous access and improve scalability. Routes are often manual or coverage-driven, and the collected imagery is not always comparable or aligned with maintenance decision needs. This study proposes a knowledge-based UAV path planning approach that converts maintenance intent into executable and repeatable inspection routes. The method integrates element-level maintenance knowledge from field inspection and maintenance records encoded as priority weights and viewing requirements with BIM derived bridge geometry to generate candidate viewpoints and element specific inspection patterns for substructure and superstructure. Viewpoints are evaluated using a maintenance-weighted utility function. A case study on a conventional concrete box-girder toll-road bridge compares the approach with three baselines manual rule-of-thumb, a coverage only planner, and a robustness oriented feasibility proxy. Results show routes that remain traceable to maintenance priorities and support cycle-to-cycle repeatability for continuous inspection planning.

  • Open Access

    Fuzzy Bayesian Belief Networks Method on Risk Assessment of EPC Pipeline Project

    by Muhammad Yusuf, Yusuf Latief, Ayomi Dita Rarasati, Bambang Trigunarsyah, Naufal Budi Laksono

    Subsea gas pipeline projects are experiencing significant technical and managerial challenges across Engineering, Procurement, and Construction (EPC) phases. To address the challenges, effective risk management in the early project phases is essential to mitigating cascading failures that cause significant schedule delay and cost overrun. Therefore, this study aimed to apply the Fuzzy Bayesian Belief Networks (FBBNs) method to model risk assessment during EPC phases. The findings showed that FBBNs made it possible for a new way to evaluate risks, find interdependencies, and guess what would happen next, which created a strong framework for reducing risk. Based on probabilistic analysis as supported by expert elicitation, risks from the early phase of engineering and procurement showed high probabilities of occurrence, including Incompetent Personnel, Project Mismanagement, Unsupportive Stakeholder, Corruption, and Design Inaccuracies. A significant impact was also observed on Construction Rework, Material Quantity Increase, Construction Delay, and Cost Overrun. The results showed the importance of addressing systemic issues early in the EPC project lifecycle, emphasizing personnel competency, design accuracy, strategic and project management planning, procurement management, stakeholder management, and constructability preparation to reduce vulnerabilities. This integrated method aimed to enhance accuracy predictions by determining causal risk probability relationships in high-risk offshore environments of EPC subsea gas pipeline projects. Doi: 10.28991/CEJ-2025-011-03-013 Full Text: PDF


  • Open Access

    Optimizing Dam Maintenance: An Integrated BIM-WBS Operational Model

    by Diana Rohmatul Fitria, Yusuf Latief, Toha Saleh, Naufal Budi Laksono

    This study addresses the challenges of inefficient dam maintenance by proposing and validating an integrated operational model that leverages Building Information Modelling (BIM) and Work Breakdown Structure (WBS). Traditional dam maintenance often suffers from poor coordination, inadequate resource allocation, and scheduling delays. To overcome these limitations, this research developed a novel model that seamlessly integrates BIM's 3D visualization and data management capabilities with the hierarchical structure of WBS. A mixed-method approach, combining literature review, expert validation, and a case study application, was employed to develop and evaluate the model. The resulting operational model demonstrated improved task efficiency, resource optimization, and stakeholder collaboration through real-time task tracking, streamlined workflows, and enhanced prioritization of maintenance activities. Expert feedback confirmed the model's practicality and effectiveness in resolving common maintenance issues, highlighting its potential to improve communication, reduce delays, and increase the accuracy of maintenance planning. The validated BIM-WBS integrated model provides a robust framework for enhancing dam maintenance performance, offering data-driven decision-making and improved stakeholder collaboration. Future research directions include exploring the model's applicability to other infrastructure types and integrating real-time technologies like IoT and AI for predictive maintenance capabilities.


  • Open Access

    Enhancing BIM Application for Bridge Maintenance and Preservation in Indonesia: A Comprehensive Mathematical Evaluation Through SEM PLS – ANN of Policy, Organization, and Funding Strategies

    by N. B. Laksono, Y. Latief, B. Trigunarsyah

    Bridge is important infrastructure that supports societal connectivity, mobility, and the smooth flow of goods as well as services in Indonesia. In the last 3 years, 60% of bridges in Indonesia have become old and deteriorated, necessitating the need for proper maintenance and preservation. Implementation challenges often arise due to policy issues, inefficient organizational structures, and limited adequate Funding. Therefore, this research aimed to evaluate the policies, organizational structures, and Funding related to bridge maintenance and preservation in Indonesia. Secondary data obtained from current policy regulations, present organizational structures, and budget allocations for bridge maintenance using Partial Least Square Structural Equation Modeling (SEM-PLS) – Artifical Neural Network (ANN) Method were qualitatively and quantitatively analyzed. Surveys and interviews with stakeholders, such as government entities, relevant institutions, and contractors involved in bridge maintenance were conducted. The result provided insights into the challenges faced in bridge maintenance and preservation implementation. Furthermore, it provided policy recommendations needed to enhance the effectiveness of policies, organizational structures, and Funding related to bridge maintenance and preservation.


  • Open Access

    Development of Construction Safety Dashboard Based on Four-Dimensional Building Information Modeling for Fall Prevention: Case Study of Stadium Roof Works

    by Rossy Armyn Machfudiyanto, Titi Sari Nurul Rachmawati, Naufal Budi Laksono, Mehrtash Soltani, Chansik Park

    The construction sector is known for exposing workers to numerous potential hazards, with falls from heights being the leading cause. These fatal fall accidents not only result in human loss but also impose significant financial costs on construction projects. However, current safety planning and management is typically carried out manually using safety documents and 2D models, which are time-consuming and labor-intensive. There is also a lack of visualization for the placement of temporary safety facilities (TSFs) during construction. Meanwhile, Building Information Modeling (BIM) has the potential to be used as a comprehensive workspace planning for TSFs in a scheduling manner. Therefore, this study proposes the development of a construction safety dashboard to inform workers about fall hazards using spatial–temporal data stored in 4D BIM. The proposed approach includes four modules: (1) identification and assessment of risk from identified work activities, (2) development of 4D BIM model, (3) creation of a dashboard to share safety knowledge, and (4) validation of the dashboard through interviews with safety managers and site workers. This approach is tested on a stadium project, particularly focusing on roof work activities, where workers are most prone to fall hazards. The proposed method aims to provide ease for site workers to access safety knowledge, including risk identification (including risk, fatality, location, and time), visualization of TSFs, personal protective equipment, and safety work instructions. This interactive dashboard also enables safety managers to plan safety measures, allocate TSFs efficiently, and make well-informed decisions to effectively mitigate risks.


  • Open Access

    Sustainable Infrastructure Development in The IKN Region (Nusantara Capital): Simulation of The Smart Self-Sustaining Urban Center Area Development

    by Naufal Budi Laksono, Universitas Indonesia, Yusuf Latief

    Embarking on the quest for a sustainable urban future, this research immerses itself in the vibrant landscape of "Sustainable Infrastructure Development in the IKN Region (Nusantara Capital)." This study investigates the financial viability and economic attractiveness of the Five City project, focusing on efficient infrastructure management for sustainable settlement development. The core facility comprises four vertical residential towers with supporting amenities. The research aims to evaluate the project''s feasibility over a 25-year investment period through comprehensive financial analyses.The research employs a structured approach, encompassing regulatory analysis, stakeholder identification, financial capability analysis, and risk management. Parameters such as Net Present Value (NPV), Benefit/Cost Ratio (BCR), Internal Rate of Return (IRR), and Payback Period are used for economic feasibility analysis. The study employs a detailed Risk Breakdown Structure (RBS) and Risk Register for risk management. The results collectively highlight the project''s promising economic outlook and proactive risk management approach.In conclusion, the study underscores the feasibility of the Five City project as a sound venture in project financing. The findings contribute valuable insights into infrastructure development, project finance, and risk management, providing a blueprint for sustainable housing projects in the Nusantara Capital Region. Recommendations include continuous monitoring, transparent communication, and adaptability for long-term success.