SCShuxu Chen

Shuxu Chen

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Shuxu Chen has a total of 13 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    A Study on Power Grid Project Portfolio Based on Multiscale Feature Integration

    by Xianing Jin, Jicong You, Liang Ma, Dong Zhao, Shuxu Chen, Xiaohai Gao, Hongwei Wang

    Power grid companies have established a feasibility study reserve phase to optimize the rolling schedule of annual investments, in which projects undergo preliminary feasibility studies, are incorporated into a project reserve pool, and subsequently proceed through release, implementation, and monitoring. However, the lack of synergy among projects in this process makes it difficult to maximize investment returns. To address this issue, this paper proposes a multiscale feature integration approach to power grid project portfolio management to optimize project management and investment efficiency. The proposed method constructs a multidimensional project association network integrating strategic, geographic, and semantic factors, and it extracts and fuses multiscale features to support project portfolio decision-making. Experimental results demonstrate that the proposed method effectively optimizes power grid project portfolios and is better suited to power grid projects than existing project optimization methods.

  • Open Access

    Critical Cluster Mining and Optimal Allocation for Power Grid Projects Based on Complex Networks and Multidimensional Metrics

    by Minghong Liu, Shuxu Chen, Xianing Jin, Wenxin Mu, Huan Zhang

    With the increasing complexity of grid project systems, it is difficult for an individual project management perspective to meet the macro management needs of the project, unapplicable to overall project layout management. However, the current grid project portfolio management (PPM) configuration lacks systematic methodological support, and the synergistic relationships between projects in terms of resources, strategy, and other aspects have not been effectively utilized, making it difficult to optimize the effectiveness of management and investment schemes. Therefore, in this paper, we propose a method called CNMI-PGPC, which combines complex networks and multidimensional indicators to explore the correlations among grid projects, deeply mines the key grid project clusters and the optimal allocation strategy, and is devoted to improving the comprehensive efficiency of grid projects. The methodology was validated on data derived from the Grid Multi-Category Reserve Project (including grid infrastructure, production technology improvement, and grid digitization). The results show that the proposed method can effectively provide a scientific basis for configuring and managing grid projects, support the preferential decision-making tasks of projects, and optimize the layouts of grid projects. We shift from single-project optimization to global synergy, quantify the comprehensive benefits of the project team in terms of economics, strategy, and other dimensions, bridge the gap between the previous individual project assessment perspectives, and provide a systematic decision-making basis for grid project portfolio planning.