Jun Zhang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Jun Zhang has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Jiguo Liu
CCCC Second Highway Consultants Co., Ltd., Wuhan 430056, China
3 shared publications - Shuoren Fu
School of Mechanics and Civil Engineering, China University of Mining and Technology, Xuzhou 221116, China
2 shared publications - Zequn Hong
School of Mechanics and Civil Engineering, China University of Mining and Technology, Xuzhou 221116, China
2 shared publications - Shutong Dong
School of Architecture and Civil Engineering, Jiangsu University of Science and Technology, Zhenjiang 212100, China
1 shared publication - Silin Wu
School of Architecture and Civil Engineering, Jiangsu University of Science and Technology, Zhenjiang 212100, China
1 shared publication - Xiaohui Sun
College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, China
1 shared publication
Latest Publications
- Open Access
Early-Strength Controllable Geopolymeric CLSM Derived by Shield Tunneling Muck: Performance Optimization and Hydration Mechanism of GGBFS–CS Systems
The large-scale reuse of shield tunneling muck remains a major challenge in urban construction. This study proposes a geopolymeric-controlled low-strength material (GC-CLSM) utilizing shield tunneling muck as the primary raw material and a novel alkali-activated binder composed of ground granulated blast-furnace slag (GGBFS) and carbide slag (CS). Emphasis is placed on early-age strength development and its underlying mechanisms, which were often overlooked in previous CLSM studies. Among the tested mixtures, a GGBFS:CS ratio of 80:20 yielded the best balance between early and long-term strength. Its 1-day UCS reached 1.18–1.75 MPa, representing a 6.3–23.6-fold increase over the low-CS reference (90:10), which achieved only 0.05–0.31 MPa. However, excessive CS content (e.g., 60:40) led to a significant reduction in the 28-day strength—up to nearly 50% compared with the 90:10 mix—due to impaired microstructural densification. Microstructural analyses (pore-solution pH, SEM, EDS, XRD, FTIR, LF-NMR) confirmed that higher CS levels enhanced early C–A–S–H gel formation by increasing OH− and Ca2+ availability while compromising long-term structure. Additionally, the GC-CLSM system reduced carbon emissions by 68.6–70.3% per ton of treated shield tunneling muck compared with conventional cement-based CLSM. Overall, this study offers a sustainable and performance-driven approach for the valorization of shield tunneling muck, enabling the development of early-strength controllable, low-carbon CLSM for infrastructure applications.
Open AccessEarly-Strength Controllable Geopolymeric CLSM Derived by Shield Tunneling Muck: Performance Optimization and Hydration Mechanism of GGBFS–CS Systems
The large-scale reuse of shield tunneling muck remains a major challenge in urban construction. This study proposes a geopolymeric-controlled low-strength material (GC-CLSM) utilizing shield tunneling muck as the primary raw material and a novel alkali-activated binder composed of ground granulated blast-furnace slag (GGBFS) and carbide slag (CS). Emphasis is placed on early-age strength development and its underlying mechanisms, which were often overlooked in previous CLSM studies. Among the tested mixtures, a GGBFS:CS ratio of 80:20 yielded the best balance between early and long-term strength. Its 1-day UCS reached 1.18–1.75 MPa, representing a 6.3–23.6-fold increase over the low-CS reference (90:10), which achieved only 0.05–0.31 MPa. However, excessive CS content (e.g., 60:40) led to a significant reduction in the 28-day strength—up to nearly 50% compared with the 90:10 mix—due to impaired microstructural densification. Microstructural analyses (pore-solution pH, SEM, EDS, XRD, FTIR, LF-NMR) confirmed that higher CS levels enhanced early C–A–S–H gel formation by increasing OH− and Ca2+ availability while compromising long-term structure. Additionally, the GC-CLSM system reduced carbon emissions by 68.6–70.3% per ton of treated shield tunneling muck compared with conventional cement-based CLSM. Overall, this study offers a sustainable and performance-driven approach for the valorization of shield tunneling muck, enabling the development of early-strength controllable, low-carbon CLSM for infrastructure applications.
- Open Access
- 11 October 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (20) , 9274
Theoretical Prediction and Safety Evaluation of Adjacent Pipeline Deformation Caused by Connecting Channel Excavation Reinforced with Freezing Method
Underground excavation by freezing method can ensure the safety of the surrounding structures. The influence of excavation of a connecting channel between two tunnels by freezing method on adjacent pipelines is studied in this paper. Combined with field measurement, numerical simulation, and theoretical analysis, the stress and deformation law of the whole process of channel excavation by freezing method is studied. Based on Euler–Bernoulli beam theory prediction, the influence of temperature field and excavation parameters on the longitudinal deformation of pipeline is analyzed. The results show that the excavation rate significantly affects the pipeline settlement, and the settlement surges when the excavation rate exceeds 1.0 m/d. At the same time, the thick frozen soil wall formed by low freezing temperatures enhances the supporting ability and effectively reduces the formation disturbance and settlement. The study focuses on the influence of connecting channel excavation on the pipelines under uniform formation conditions, and puts forward the evaluation method of pipeline safety to provide a theoretical reference for engineering practice.
- 11 October 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (20) , 9274
Open AccessTheoretical Prediction and Safety Evaluation of Adjacent Pipeline Deformation Caused by Connecting Channel Excavation Reinforced with Freezing Method
Underground excavation by freezing method can ensure the safety of the surrounding structures. The influence of excavation of a connecting channel between two tunnels by freezing method on adjacent pipelines is studied in this paper. Combined with field measurement, numerical simulation, and theoretical analysis, the stress and deformation law of the whole process of channel excavation by freezing method is studied. Based on Euler–Bernoulli beam theory prediction, the influence of temperature field and excavation parameters on the longitudinal deformation of pipeline is analyzed. The results show that the excavation rate significantly affects the pipeline settlement, and the settlement surges when the excavation rate exceeds 1.0 m/d. At the same time, the thick frozen soil wall formed by low freezing temperatures enhances the supporting ability and effectively reduces the formation disturbance and settlement. The study focuses on the influence of connecting channel excavation on the pipelines under uniform formation conditions, and puts forward the evaluation method of pipeline safety to provide a theoretical reference for engineering practice.
- Open Access
Influence of Freezing Tunnel Excavation on Foundation Settlement of Buildings
In this paper, the effects of the cement content and excavation speed parameters on the improvement effect of the artificial freezing method and the characteristics of frozen walls are studied by means of a field test, numerical simulation and theoretical model. The optimization effect of the cement content in the artificial freezing method is studied. It is found that 10% is the best content, which can maximize the freezing wall thickness and grouting effect, and promote uniform distribution of the temperature field. At the same time, the influence of the excavation speed on the stress and settlement of the foundation soil is analyzed. It is pointed out that the increase of the excavation speed will aggravate the settlement and stress redistribution, which may threaten the building structure. The evaluation method proposed in this paper verifies that the construction deformation and settlement control are within the safety standards and provides theoretical support and construction guidance for tunnel engineering.
Open AccessInfluence of Freezing Tunnel Excavation on Foundation Settlement of Buildings
In this paper, the effects of the cement content and excavation speed parameters on the improvement effect of the artificial freezing method and the characteristics of frozen walls are studied by means of a field test, numerical simulation and theoretical model. The optimization effect of the cement content in the artificial freezing method is studied. It is found that 10% is the best content, which can maximize the freezing wall thickness and grouting effect, and promote uniform distribution of the temperature field. At the same time, the influence of the excavation speed on the stress and settlement of the foundation soil is analyzed. It is pointed out that the increase of the excavation speed will aggravate the settlement and stress redistribution, which may threaten the building structure. The evaluation method proposed in this paper verifies that the construction deformation and settlement control are within the safety standards and provides theoretical support and construction guidance for tunnel engineering.