Kaichen Ying
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Kaichen Ying has a total of 16 co-authors. Here are the top co-authors by number of shared publications:
- Norman Burua Adriko
Southwest Jiaotong University, Chengdu, China
2 shared publications - Zhigang Yao
State Key Laboratory of Intelligent Geotechnics and Tunnelling, Southwest Jiaotong University, Chengdu, China
2 shared publications - Arif Khan
State Key Laboratory of Intelligent Geotechnics and Tunnelling, Southwest Jiaotong University, Chengdu, China
1 shared publication - Arif Khan
State Key Laboratory of Intelligent Geotechnics and Tunneling, Southwest Jiaotong University, Chengdu, China
1 shared publication - Bo Liu
Railway Engineering Research Institute, China Academy of Railway Science Corporation Limited, Beijing 100081, China
1 shared publication - Hu Luo
CAS Key Laboratory of Low-Carbon Conversion Science and Engineering, Shanghai Advanced Research Institute, Chinese Academy of Sciences, Shanghai 201210, China
1 shared publication
Latest Publications
- 9 September 2026
- Published by Springer Nature in Transportation Infrastructure Geotechnology
- Vol. 13 (7) , 271
Experimental Study and PIV Analysis of Cavity Collapse Post-Tunnelling in Coupled Hydro-Mechanical State
- 9 September 2026
- Published by Springer Nature in Transportation Infrastructure Geotechnology
- Vol. 13 (7) , 271
Experimental Study and PIV Analysis of Cavity Collapse Post-Tunnelling in Coupled Hydro-Mechanical State
- Open Access
- 15 October 2025
- Published by Springer Nature in Scientific Reports
- Vol. 15 (1) , 1-19
Settlement prediction of undercrossing semicircular tunnel-pile set up in soft clay soil
Soil–structure interactions commonly induce displacements, with settlements in weak soils becoming increasingly significant under growing urbanization, making it important to minimize them to prevent structural defects. This study investigated the influence of tunnel–pile configurations on ground settlement during tunnel construction at Zhongshan Road with an undercrossing, using numerical simulation. Prediction functions describing settlement behavior within the model were developed and proposed. The Mohr–Coulomb (MC) model in MIDAS GTS NX was employed to simulate settlement levels of a semicircular tunnel lining and surrounding soil under various pile setups, in order to identify the most effective configuration for ground improvement. Results showed substantial variations in vertical settlement. The designed 5 × 4 m pile setup produced the highest crown settlement, increasing it by 32–47% longitudinally along the tunnel compared to the case without piles, while reducing lining uplift by only 138–165%. In contrast, the 4 × 4 m pile arrangement performed best overall, reducing uplift by 184–194% and limiting settlement fluctuations to − 12% to − 47%, maintaining values within 5–10 mm along the 80 m tunnel length. The 4 × 4 m pile setup was therefore more reliable and less variable in both settlement and uplift. Uniform pile arrangements provided smoother settlement troughs than non-uniform setups. Furthermore, prediction formulas based on Gaussian functions, using parameters n and k, reliably estimated settlement for greenfield conditions and projected behavior for tunnel undercrossings. The greenfield prediction function was validated against 12 existing projects, with n values within \(\pm 1.4\) prediction and back-calculated settlements closely matching observed settlements- 15 October 2025
- Published by Springer Nature in Scientific Reports
- Vol. 15 (1) , 1-19
Open AccessSettlement prediction of undercrossing semicircular tunnel-pile set up in soft clay soil
Soil–structure interactions commonly induce displacements, with settlements in weak soils becoming increasingly significant under growing urbanization, making it important to minimize them to prevent structural defects. This study investigated the influence of tunnel–pile configurations on ground settlement during tunnel construction at Zhongshan Road with an undercrossing, using numerical simulation. Prediction functions describing settlement behavior within the model were developed and proposed. The Mohr–Coulomb (MC) model in MIDAS GTS NX was employed to simulate settlement levels of a semicircular tunnel lining and surrounding soil under various pile setups, in order to identify the most effective configuration for ground improvement. Results showed substantial variations in vertical settlement. The designed 5 × 4 m pile setup produced the highest crown settlement, increasing it by 32–47% longitudinally along the tunnel compared to the case without piles, while reducing lining uplift by only 138–165%. In contrast, the 4 × 4 m pile arrangement performed best overall, reducing uplift by 184–194% and limiting settlement fluctuations to − 12% to − 47%, maintaining values within 5–10 mm along the 80 m tunnel length. The 4 × 4 m pile setup was therefore more reliable and less variable in both settlement and uplift. Uniform pile arrangements provided smoother settlement troughs than non-uniform setups. Furthermore, prediction formulas based on Gaussian functions, using parameters n and k, reliably estimated settlement for greenfield conditions and projected behavior for tunnel undercrossings. The greenfield prediction function was validated against 12 existing projects, with n values within \(\pm 1.4\) prediction and back-calculated settlements closely matching observed settlements - 11 August 2025
- Published by Springer Nature in Bulletin of Engineering Geology and the Environment
- Vol. 84 (9) , 1-23
Integration of multi-physical signals for monitoring shear failure in jointed granite: insights from experimental study
- 11 August 2025
- Published by Springer Nature in Bulletin of Engineering Geology and the Environment
- Vol. 84 (9) , 1-23
Integration of multi-physical signals for monitoring shear failure in jointed granite: insights from experimental study
- Open Access
Soil Displacement of Slurry Shield Tunnelling in Sandy Pebble Soil Based on Field Monitoring and Numerical Simulation
Due to its inherent advantages, shield tunnelling has become the primary construction method for urban tunnels, such as high-speed railway and metro tunnels. However, there are numerous technical challenges to shield tunnelling in complex geological conditions. Under the disturbance induced by shield tunnelling, sandy pebble soil is highly susceptible to ground loss and disturbance, which may subsequently lead to the risk of surface collapse. In this paper, large-diameter slurry shield tunnelling in sandy pebble soil is the engineering background. A combination of field monitoring and numerical simulation is employed to analyze tunnelling parameters, surface settlement, and deep soil horizontal displacement. The patterns of ground disturbance induced by shield tunnelling in sandy pebble soil are explored. The findings reveal that slurry pressure, shield thrust, and cutterhead torque exhibit a strong correlation during shield tunnelling. In silty clay sections, surface settlement values fluctuate significantly, while in sandy pebble soil, the settlement remains relatively stable. The longitudinal horizontal displacement of deep soil is significantly greater than the transverse horizontal displacement. In order to improve the surface settlement troughs obtained by numerical simulation, a cross-anisotropic constitutive model is used to account for the anisotropy of the soil. A sensitivity analysis of the cross-anisotropy parameter α was performed, revealing that as α increases, the maximum vertical displacement of the ground surface gradually decreases, but the rate of decrease slows down and tends to level off. Conversely, as the cross-anisotropy parameter α decreases, the width of the settlement trough narrows, improving the settlement trough profile.
Open AccessSoil Displacement of Slurry Shield Tunnelling in Sandy Pebble Soil Based on Field Monitoring and Numerical Simulation
Due to its inherent advantages, shield tunnelling has become the primary construction method for urban tunnels, such as high-speed railway and metro tunnels. However, there are numerous technical challenges to shield tunnelling in complex geological conditions. Under the disturbance induced by shield tunnelling, sandy pebble soil is highly susceptible to ground loss and disturbance, which may subsequently lead to the risk of surface collapse. In this paper, large-diameter slurry shield tunnelling in sandy pebble soil is the engineering background. A combination of field monitoring and numerical simulation is employed to analyze tunnelling parameters, surface settlement, and deep soil horizontal displacement. The patterns of ground disturbance induced by shield tunnelling in sandy pebble soil are explored. The findings reveal that slurry pressure, shield thrust, and cutterhead torque exhibit a strong correlation during shield tunnelling. In silty clay sections, surface settlement values fluctuate significantly, while in sandy pebble soil, the settlement remains relatively stable. The longitudinal horizontal displacement of deep soil is significantly greater than the transverse horizontal displacement. In order to improve the surface settlement troughs obtained by numerical simulation, a cross-anisotropic constitutive model is used to account for the anisotropy of the soil. A sensitivity analysis of the cross-anisotropy parameter α was performed, revealing that as α increases, the maximum vertical displacement of the ground surface gradually decreases, but the rate of decrease slows down and tends to level off. Conversely, as the cross-anisotropy parameter α decreases, the width of the settlement trough narrows, improving the settlement trough profile.