Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Tolossa Negassa Ebissa has a total of 6 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Hydrological resilience to climate extremes and its implications for water security in the data-scarce Baro river basin

    by Shimelash Molla Kassaye, Tolossa Negassa Ebissa, Yilkal Gebeyehu Mekonnen

  • Open Access

    Hydrological response to climate change in Baro basin, Ethiopia, using representative concentration pathway scenarios

    by Tolossa Negassa Ebissa, Shimelash Molla Kassaye, Demelash Ademe Malede

    Droughts and floods are common in the Baro basin and climate change may exacerbate them. This study aimed to investigate the hydrological response to climate change’s impact in the Baro River basin. Four climate models namely, Hadley Centre Global Environmental Model, version 2 (HadGEM2-ES), Max Planck Institute Earth System Model—Low Resolution (MPI-ESM-LR), Coupled Model Version 5, Medium Resolution (CM5A-MR) and European Community Earth System Model (EC-Earth) dynamically downscaled outputs were obtained from Africa coordinated regional downscaling experiment program. The four climate models were evaluated using a suite of statistical measures such as bias, Root Mean Squared Error, and Coefficient of Variation. The bias of the simulated rainfall varies between − 4.20% and − 25.39% suggesting underestimation. The performance of the models differs subject to the performance measures used for evaluation. Before being used in the climate impact analysis, the climate model data was heavily skewed and needed correction. In terms of bias, HadGEM2-ES performed the worst while EC-Earth performed the best. MPI-ESM-LR was the worst performer in terms of RMSE and CM5A-MR was the best. Changes in the hydrological response to climate change were compared to the baseline scenario (1971–2000) under the Representative Concentration Pathway Scenarios (RCP 4.5) for the medium term (2041–2070). The GCM predictions for the RCP 4.5 scenarios suggested that, in the medium period (2041–2070) the maximum temperature in the Baro River basin will probably rise by 2.1 °C for MPI-ESM-LR and 2.49 °C for CM5A-MR, while the minimum temperature would likely climb by 1.7 °C to EC-Earth and 2.8 °C for HadGEM2-ES. Annual rainfall is expected to fall by 7.02% for CM5A-MR and 17.01% for HadGEM2-ES, while annual evapotranspiration potential is likely to rise. Except from March to May CM5A-MR consistently generated the greatest amount of streamflow change, while MPI-ESM-LR consistently generated the highest magnitude of streamflow change. The annual streamflow reduction is consistent with the annual precipitation reduction and increased annual potential evapotranspiration. Generally, climate change is predicted to have a significant impact on the hydrological response in the Baro River basin under the RCP 4.5 scenario.


  • Open Access

    Future Water Availability Under Representative Concentration Pathways Scenario in Baro Basin, Ethiopia

    by Tolossa Negassa Ebissa

    The objective in this study was to assess future water availability in the upper part of the Baro basin in Southwest Ethiopia through the Representative Concentration Pathway (RCP 4.5) scenario. HBV-96 rainfall-runoff model was calibrated and validated for historical records of streamflow. The estimated NSE and RVE values are 0.91 and -6.76% during calibration period (1996-2002) and validation period (2003-2005) values are 0.72 and 9.78% respectively. Dynamically downscaled climate model outputs were obtained from four models through the CORDEX-Africa program. The four climate models were evaluated using a suite of statistical measures such as bias, Root Mean Squared Error (RMSE) and Coefficient of Variation (CV). The bias of the simulated rainfall varies between -4.20% and -25.39% suggesting underestimation. In terms of bias, EC-Earth performs best while HadGEM2-ES performs worst. In terms of RMSE, MPI-ESM-LR performs worst while CM5A-MR performs best. All the four GCMs projections showed that the maximum temperature will likely increase by 2.08°C (MPI-ESM-LR) to 2.52°C (CM5A-MR) and minimum temperature will also likely increase by 1.65°C (EC-Earth) to 2.78°C (HadGM2-ES) in the Baro basin in medium-term (2041-2070) for the RCP4.5 scenario. However, the annual rainfall amount will likely decrease by 7.34% (CM5A-MR) to 17.42% (HaDGEM2-ES) and with a likely increase in annual potential evapotranspiration. The maximum streamflow reduction was projected for the rainy season (Kiremt) by up to 28.36% (CM5A-MR). The annual streamflow is projected to decline by up to 35.2% during 2050s. The findings of this study indicate that climate change under the RCP4.5 scenario will have a significant implication to water availability in the Baro basin.

  • Open Access

    Site Selection and Design of Mini Hydropower Plant for Rural Electrification in Keber River

    by Shimelash Molla Kassaye, Tolossa Negassa Ebissa, Bahiru Geleta Gutema, Gutema Tamiru Gurmesa

    Nearly two billion peoples in developing countries do not have access to electricity service. Renewable energy resources are a best option for rural electrification in a country like Ethiopia where electric light is a luxury enjoyed only by a few peoples. Nowadays, only around fifteen percent of the populations living in urban and semi urban areas are connected to the national grid. The remaining populations are living in scattered rural villages and have very remote chances to get electricity from the grid. The only realistic approach to electrify the rural areas seems therefore to be the off grid or self-contained system. The contributions of renewable sources of energy like micro/mini or Pico hydro power, to rural electrification are minimal still. The main objective of the present study was to identify the potential of mini hydropower site and proposing a plant for rural electrification in Keber River around Tobacha kebele. So in the research the study starts from the estimation of the design discharge by analyzing of the stream flow using the flow duration curve. For estimating the design discharge the available discharge in the river, the population demand and some guidelines for development of mini hydropower were used. So using the above constraints the power of 120kw was designed for a 300 households, 1 clinic and 2 elementary schools. Besides estimating the power, the present study focuses on design of civil structures and selection of electromechanical components. Generally the result of the study shows that construction of mini hydropower was feasible in the project site.