Otto Hedges
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Otto Hedges has a total of 15 co-authors. Here are the top co-authors by number of shared publications:
- Bernadette Konwat
University of Alberta
2 shared publications - Abbey Dale Abellanosa
University of Alberta
1 shared publication Adekunle Mofolasayo
University of Alberta
1 shared publicationAhmed Hammad
University of Alberta
1 shared publication- Ahmed Hammad
Construction Engineering and Management, Department of Civil and Environmental Engineering, University of Alberta, Edmonton, AB T6G 2R3, Canada
1 shared publication Alireza Bayat
University of Alberta
1 shared publication
Latest Publications
- 23 November 2025
- Published by Springer Nature
- p. 97-109
Sanitary Sewer Construction Methodology
- 17 October 2025
- Published by Springer Nature
- p. 221-233
Sustainable Construction of Existing Wetlands for Urban Stormwater Management
- 17 October 2025
- Published by Springer Nature
- p. 221-233
Sustainable Construction of Existing Wetlands for Urban Stormwater Management
- 16 October 2024
- Published by Springer Nature
- p. 337-351
Risk-Based Profit-Sharing Analysis in a Collaborative Land Development Project
- 16 October 2024
- Published by Springer Nature
- p. 337-351
Risk-Based Profit-Sharing Analysis in a Collaborative Land Development Project
- Open Access
- 1 July 2024
- Published by IGLC
- p. 684-696
A BIM-Lean Approach to Implement Lean Principles in Offsite Construction Projects: A Cable-Stayed Bridge Case Study
Recently, the attention to offsite construction (OSC) has grown due to its potential for waste minimization, higher quality, and speedy construction. However, OSC projects are sometimes adopted at a slow pace due to inefficient workflow. Further, OSC adoption requires a high level of information sharing to integrate the manufacturing of components, onsite assembly, and logistics processes. Previous research on the integration of Lean principles with advanced technologies, i.e., BIM and blockchain, in OSC was limited to improving the onsite operations only. To this end, this research aims to bridge this gap by providing a BIM-blockchain system to apply lean principles in enhancing the workflow of the OSC projects considering offsite, onsite, and logistics operations. Lean principles, namely Kaizen, Heijunka, Just-in-Time, Onepiece flow, and Poke a yoke, form the focus of this study. Further, the study presents a secure information-sharing system based on blockchain technology to update the status of the process, i.e., pulling material from the inventory. A case study is introduced to validate the developed system. The proposed system is expected to improve the efficiency of the OSC operations and enhance the integration of stakeholders.
- 1 July 2024
- Published by IGLC
- p. 684-696
Open AccessA BIM-Lean Approach to Implement Lean Principles in Offsite Construction Projects: A Cable-Stayed Bridge Case Study
Recently, the attention to offsite construction (OSC) has grown due to its potential for waste minimization, higher quality, and speedy construction. However, OSC projects are sometimes adopted at a slow pace due to inefficient workflow. Further, OSC adoption requires a high level of information sharing to integrate the manufacturing of components, onsite assembly, and logistics processes. Previous research on the integration of Lean principles with advanced technologies, i.e., BIM and blockchain, in OSC was limited to improving the onsite operations only. To this end, this research aims to bridge this gap by providing a BIM-blockchain system to apply lean principles in enhancing the workflow of the OSC projects considering offsite, onsite, and logistics operations. Lean principles, namely Kaizen, Heijunka, Just-in-Time, Onepiece flow, and Poke a yoke, form the focus of this study. Further, the study presents a secure information-sharing system based on blockchain technology to update the status of the process, i.e., pulling material from the inventory. A case study is introduced to validate the developed system. The proposed system is expected to improve the efficiency of the OSC operations and enhance the integration of stakeholders.