Guangyao Yuan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Guangyao Yuan has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Liping Sun
College of Shipbuilding Engineering, Harbin Engineering University, Harbin 150001, China
1 shared publication - Ming-Wei Li
College of Shipbuilding Engineering, Harbin Engineering University, Harbin 150001, China
1 shared publication - Shuqi Li
Gaoling School of Artificial Intelligence, Renmin University of China, Beijing, China
1 shared publication - Tianju Zheng
College of Shipbuilding Engineering, Harbin Engineering University, Harbin 150001, China
1 shared publication
Latest Publications
- Open Access
- 7 November 2024
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 12 (11) , 2008
A Robust Multi-Objective Evolutionary Framework for Artificial Island Construction Scheduling Under Dynamic Constraints
Artificial island construction is a multifaceted engineering endeavor that demands precise scheduling to optimize resource allocation, control costs, ensure safety, and minimize environmental impact within dynamic marine environments. This study introduces a comprehensive multi-objective optimization model that integrates critical factors such as resource limitations, task dependencies, environmental variability, safety risks, and regulatory compliance. To effectively address the complexities of this model, we develop and employ the Multi-Objective Adaptive Cooperative Evolutionary Marine Genetic Algorithm (MACEMGA). MACEMGA combines cooperative coevolution, adaptive dynamic weighting, dynamic penalty functions, and advanced genetic operators to navigate the solution space efficiently and identify Pareto optimal schedules. Through extensive computational experiments using data from the Dalian Bay Cross-Sea Traffic Engineering project, MACEMGA is benchmarked against algorithms such as NSGA-II, SPEA2, and MOEA/D. The results demonstrate that MACEMGA achieves a reduction in construction time from 32.8 to 23.5 months and cost savings from CNY 4105.3 million to CNY 3650.0 million while maintaining high-quality outcomes and compliance with environmental standards. Additionally, MACEMGA shows improvements in hypervolume by up to 15% over existing methods and a Convergence Rate that is 8% faster than MOEA/D.
- 7 November 2024
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 12 (11) , 2008
Open AccessA Robust Multi-Objective Evolutionary Framework for Artificial Island Construction Scheduling Under Dynamic Constraints
Artificial island construction is a multifaceted engineering endeavor that demands precise scheduling to optimize resource allocation, control costs, ensure safety, and minimize environmental impact within dynamic marine environments. This study introduces a comprehensive multi-objective optimization model that integrates critical factors such as resource limitations, task dependencies, environmental variability, safety risks, and regulatory compliance. To effectively address the complexities of this model, we develop and employ the Multi-Objective Adaptive Cooperative Evolutionary Marine Genetic Algorithm (MACEMGA). MACEMGA combines cooperative coevolution, adaptive dynamic weighting, dynamic penalty functions, and advanced genetic operators to navigate the solution space efficiently and identify Pareto optimal schedules. Through extensive computational experiments using data from the Dalian Bay Cross-Sea Traffic Engineering project, MACEMGA is benchmarked against algorithms such as NSGA-II, SPEA2, and MOEA/D. The results demonstrate that MACEMGA achieves a reduction in construction time from 32.8 to 23.5 months and cost savings from CNY 4105.3 million to CNY 3650.0 million while maintaining high-quality outcomes and compliance with environmental standards. Additionally, MACEMGA shows improvements in hypervolume by up to 15% over existing methods and a Convergence Rate that is 8% faster than MOEA/D.