Hugo Muzitano
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Hugo Muzitano has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Dany Huamannahui Huanca
Department of Electrical Engineering, Federal University of Rio de Janeiro, COPPE, Rio de Janeiro 21941-901, Brazil
2 shared publications - Djalma Mosqueira Falcão
Department of Electrical Engineering, Alberto Luiz Coimbra Institute for Graduate Studies and Research in Engineering (COPPE), Federal University of Rio de Janeiro, Rio de Janeiro 21941-901, Brazil
2 shared publications - Glauco Nery Taranto
Department of Electrical Engineering, Instituto Alberto Luiz Coimbra de Pós-Graduação e Pesquisa em Engenharia (COPPE), Federal University of Rio de Janeiro, Rio de Janeiro 21941-901, Brazil
2 shared publications - Murilo Eduardo Casteroba Bento
Department of Electrical Engineering, Federal University of Rio de Janeiro, Rio de Janeiro 21941-909, Brazil
2 shared publications - Thiago Jose Masseran Antunes Parreiras
Department of Electrical Engineering, Instituto Alberto Luiz Coimbra de Pós-Graduação e Pesquisa em Engenharia (COPPE), Federal University of Rio de Janeiro, Rio de Janeiro 21941-901, Brazil
2 shared publications - Lillian Monteath
Electricity Sector Study Group (GESEL/UFRJ), Rio de Janeiro 21941-901, Brazil
1 shared publication
Latest Publications
- Open Access
- 2 September 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (17) , 8731
Intraday Dispatch Strategies of Battery Energy Storage Systems to Smooth the Duck Curve: A Real-Life Brazilian Case
The growing penetration of centralized and distributed solar photovoltaic (PV) generation has introduced significant operational challenges in power systems, most notably the “duck curve” phenomenon, which is characterized by steep net load ramp-up at dusk. This issue has become increasingly evident worldwide, including in Brazil, where solar PV capacity is expanding rapidly. In this context, this paper proposes optimization-based strategies for dispatching Battery Energy Storage Systems (BESS) to smooth the duck curve, using real data from the state of Minas Gerais, Brazil. Three distinct optimization objectives are investigated: load derivative compensation, variable generation compensation, and average load tracking. Energetic and electric analyses were performed using the real data. For the evaluated Minas Gerais case study, both analyses indicate that the BESS operation based on load derivative compensation provides the most effective reduction in load ramps among the three strategies investigated.
- 2 September 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (17) , 8731
Open AccessIntraday Dispatch Strategies of Battery Energy Storage Systems to Smooth the Duck Curve: A Real-Life Brazilian Case
The growing penetration of centralized and distributed solar photovoltaic (PV) generation has introduced significant operational challenges in power systems, most notably the “duck curve” phenomenon, which is characterized by steep net load ramp-up at dusk. This issue has become increasingly evident worldwide, including in Brazil, where solar PV capacity is expanding rapidly. In this context, this paper proposes optimization-based strategies for dispatching Battery Energy Storage Systems (BESS) to smooth the duck curve, using real data from the state of Minas Gerais, Brazil. Three distinct optimization objectives are investigated: load derivative compensation, variable generation compensation, and average load tracking. Energetic and electric analyses were performed using the real data. For the evaluated Minas Gerais case study, both analyses indicate that the BESS operation based on load derivative compensation provides the most effective reduction in load ramps among the three strategies investigated.
- Open Access
Case Studies of Battery Energy Storage System Applications in the Brazilian Transmission System
This paper presents the preliminary results of studies aiming to use a battery energy storage system (BESS) in the Brazilian transmission system. The main objective of the BESS is to solve congestion problems caused mainly by the large increase in variable renewable generation in certain system areas. The studies were conducted based on actual forecasted system scenarios using a full representation of the electric grid available from the Brazilian system operator data base. In this work, only the steady-state modeling was considered as this may be the first stage in the assessment of a new technology. A qualitative economic comparison of the BESS application with other possible solutions to the congestion problems is also included.
Open AccessCase Studies of Battery Energy Storage System Applications in the Brazilian Transmission System
This paper presents the preliminary results of studies aiming to use a battery energy storage system (BESS) in the Brazilian transmission system. The main objective of the BESS is to solve congestion problems caused mainly by the large increase in variable renewable generation in certain system areas. The studies were conducted based on actual forecasted system scenarios using a full representation of the electric grid available from the Brazilian system operator data base. In this work, only the steady-state modeling was considered as this may be the first stage in the assessment of a new technology. A qualitative economic comparison of the BESS application with other possible solutions to the congestion problems is also included.