Weiying Wang
Research Subjects
Weiying Wang has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Guoyong Zhang
China Renewable Energy Engineering Institute, Beijing 100011, China
1 shared publication - Haochuan Li
School of Civil and Hydraulic Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
1 shared publication - Hui Qin
School of Civil and Hydraulic Engineering, Huazhong University of Science and Technology, Wuhan, China
1 shared publication - Jun Guo
School of Civil and Hydraulic Engineering, Huazhong University of Science and Technology, 1037 Luoyu Road, Wuhan, Hubei 430074, People's Republic of China
1 shared publication - Lingli Wang
China Renewable Energy Engineering Institute, Beijing 100011, China
1 shared publication - Xiu Ni
School of Civil and Hydraulic Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
1 shared publication
Latest Publications
- Open Access
Research on Medium- and Long-Term Hydropower Generation Forecasting Method Based on LSTM and Transformer
Hydropower generation is influenced by various factors such as precipitation, temperature, and installed capacity, with hydrometeorological factors exhibiting significant temporal variability. This study proposes a hydropower generation forecasting method based on Transformer and SE-Attention for different provinces. In the model, the outputs of the Transformer and SE-Attention modules are fed into an LSTM layer to capture long-term data dependencies. The SE-Attention module is reintroduced to enhance the model’s focus on important temporal features, and a linear layer maps the hidden state of the last time step to the final output. The proposed Transformer-LSTM-SE model was tested using provincial hydropower generation data from Yunnan, Sichuan, and Chongqing. The experimental results demonstrate that this model achieves high accuracy and stability in medium- and long-term hydropower forecasting at the provincial level, with an average accuracy improvement of 33.79% over the LSTM model and 24.30% over the Transformer-LSTM model.
Open AccessResearch on Medium- and Long-Term Hydropower Generation Forecasting Method Based on LSTM and Transformer
Hydropower generation is influenced by various factors such as precipitation, temperature, and installed capacity, with hydrometeorological factors exhibiting significant temporal variability. This study proposes a hydropower generation forecasting method based on Transformer and SE-Attention for different provinces. In the model, the outputs of the Transformer and SE-Attention modules are fed into an LSTM layer to capture long-term data dependencies. The SE-Attention module is reintroduced to enhance the model’s focus on important temporal features, and a linear layer maps the hidden state of the last time step to the final output. The proposed Transformer-LSTM-SE model was tested using provincial hydropower generation data from Yunnan, Sichuan, and Chongqing. The experimental results demonstrate that this model achieves high accuracy and stability in medium- and long-term hydropower forecasting at the provincial level, with an average accuracy improvement of 33.79% over the LSTM model and 24.30% over the Transformer-LSTM model.