Victor Albuquerque de Carvalho
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Victor Albuquerque de Carvalho has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
Alexandra Gomez Escobar
1 shared publication- Ana Luiza Coelho Braga de Carvalho
TU Clausthal, Institute of Mineral and Waste Processing, Recycling and Circular Economy Systems
1 shared publication - André Carlos Silva
Universidade Federal de Catalão
1 shared publication Daniel Goldmann
1 shared publication- Eltton Veras
S/N Complexo Industrial de Carajás, Vale S.A., Estrada do Raymundo Mascarenhas s/n°, Parauapebas, PA 68516-000, Brazil
1 shared publication - Fabiano Veloso Ferreira
Vale Institute of Technology, Mineral Exploration and Projects Vale S.A., Santa Luzia, Minas Gerais, Brazil
1 shared publication
Latest Publications
- Open Access
Application of Blast-Pile Image Analysis in a Mine-to-Crusher Model to Minimize Overall Costs in a Large-Scale Open-Pit Mine in Brazil
Amazon rainforests have many hidden treasures; thus, a balance between mine activities and the environment must be maintained. In the northern region of Brazil, there is a large diversity of metal ore deposits, the exploitation of which requires innovative and sustainable mining operations. Historically, mining operations have caused various environmental issues, such as landscape deterioration, damage to natural structures due to detonations, and soil and water pollution, and have also contributed to CO2 emissions from diesel trucks. Here, to estimate and minimize the operating expenses of a large-scale open-pit iron mine, a mine-to-crusher model was developed. The calibration of the mine-to-crusher model was based on rock fragmentation from the blasting phase through the primary crushing phase from an analysis of pictures of the fragmented pile. A reduction in cost was determined for an optimum 90% passing size (P90). The calibration was performed with technical and economic parameters from 2 years before. For the studied iron ore mine site, an optimum P90 value between 0.29 and 0.31 m was determined.
Open AccessApplication of Blast-Pile Image Analysis in a Mine-to-Crusher Model to Minimize Overall Costs in a Large-Scale Open-Pit Mine in Brazil
Amazon rainforests have many hidden treasures; thus, a balance between mine activities and the environment must be maintained. In the northern region of Brazil, there is a large diversity of metal ore deposits, the exploitation of which requires innovative and sustainable mining operations. Historically, mining operations have caused various environmental issues, such as landscape deterioration, damage to natural structures due to detonations, and soil and water pollution, and have also contributed to CO2 emissions from diesel trucks. Here, to estimate and minimize the operating expenses of a large-scale open-pit iron mine, a mine-to-crusher model was developed. The calibration of the mine-to-crusher model was based on rock fragmentation from the blasting phase through the primary crushing phase from an analysis of pictures of the fragmented pile. A reduction in cost was determined for an optimum 90% passing size (P90). The calibration was performed with technical and economic parameters from 2 years before. For the studied iron ore mine site, an optimum P90 value between 0.29 and 0.31 m was determined.
- Open Access
- 7 August 2023
- Published by Elsevier in Minerals Engineering
- Vol. 202
A study on the desulfurization of sulfidic mine tailings for the production of a sulfur-poor residue
- 7 August 2023
- Published by Elsevier in Minerals Engineering
- Vol. 202
Open AccessA study on the desulfurization of sulfidic mine tailings for the production of a sulfur-poor residue