AAAnderson Da Silva Amaral

Anderson Da Silva Amaral

*This is an algorithmically generated author record based on publicly available information.

Anderson Da Silva Amaral has a total of 18 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Case History of the World's First Installation of Continuous Chemical Treatment in a Horizontal Openhole Gravel Pack to Inhibit Scaling While Maintaining Production Levels

    by Nilufer Darius Surveyor, Anderson Da Silva Amaral, Marcela F. Pinto

    Offshore deepwater fields usually require a semisubmersible rig to drill and complete their wells. Additionally, if any intervention is required in the well, a costly workover rig will need to be moved to the site. Hence, solving problems remotely using a method requiring less intervention can provide substantial savings in the overall cost of the well. Such an opportunity emerged when working on a project in the offshore oilfields of Brazil, where use of water injection as a reservoir energy maintenance method is common. However, the mixture of water injection wells and oil producing wells can lead to the formation of barium sulfate on downhole equipment, which can precipitate under pressure change during production. Barium sulfate's insolubility makes its removal difficult; usually requiring the use of special tools for mechanically cleaning the gravel pack screens’ interior. This type of intervention method requires an offshore rig. It demands a considerable amount of time and resources to complete the cleanup procedure, especially in the case of long openhole horizontal gravel packs. However, by pumping inhibitors directly to the gravel pack screens’ interior, production suspension is avoided, along with any intervention-related time and cost. This paper will describe the world's first installation of a horizontal openhole gravel pack system specifically designed to allow continuous pumping of scale inhibitors. The chemicals were injected through a single flowline down to the interior of the sand-control screens at two distinct parts of the well pay zone, without interrupting oil production in offshore Brazil. This pay zone management system incorporates a hydraulic wet connector, an openhole zonal isolation packer, and two chemical injection mandrels with flow regulator valves. The mandrel valves evenly distribute the barium sulfate inhibitor, preventing its deposit inside the screen. Potential applications of this system in offshore Brazil are being considered on the basis of this successful first installation. Results of this project, as well as other compelling data, suggest that operators may benefit from its incorporation in their field development plan, maximizing their return on investment.

  • Case History of the First Global Installation of a Gravel Pack System that Allows Continuous Pay Zone Chemical Treatment Pumping Without Interrupting Production

    by Nilufer Darius Surveyor, Anderson Da Silva Amaral, Marcela F. Pinto

    Offshore wells, especially deepwater completions, are usually completed with semisubmersible rigs. These use subsea trees, and workovers require moving a costly rig to the location. Solving problems remotely—with an interventionless method—provides huge savings and fewer risks. This paper focuses on the first global installation of a gravel pack system that allowed continuous pay zone chemical treatment pumping without interrupting production. For wells with issues such as barium and calcium sulfates causing obstruction at the sand control screen base pipe holes, this system allowed pumping of scale inhibitors (or any other chemical treatment) to the end of the horizontal well (toe) or to other parts of open- or cased-hole sections without needing to stop production. For this first installation, the system incorporated zonal isolation with feedthrough capabilities using reactive element packer and multiple injection nipples technology, taking advantage of a long shale segment to divide the well in two parts. In general, the number of injection nodes with the same pumping line could vary from well to well. However, at this deepwater installation offshore Brazil, the system was designed to allow continuous pumping of chemicals through only one small-diameter down into a horizontal open hole, to inside the sand control screens at two separate sections of the well, one at the toe and another above the reactive element packer. The system allowed for screen assembly installation and gravel pack pumping in one trip. A reconnect anchor seal assembly was designed and used to deliver a continuality of the flowline conduit from the gravel pack assembly to the upper string assembly. It also incorporated a cost-effective, high-flow liner system for the conduit/injection mandrel protection and a special feedthrough quick connector to simplify certain steps in the assembly. This allowed for torque and traction transmission in open-hole deployment. This paper will describe the implementation and installation of this new system.

  • The Science Behind Erosion Qualification Testing of Frac Pack Tools

    by Nicholas Jacob Clem, Aaron C. Hammer, Maria M. O’cOnnell, Anderson da Amaral

    Frac packing tool erosion is a growing concern as more high-profile deepwater wells are completed using this technique. Today many deepwater wells require frac pack pump rates of at least 40 barrels per minute (bbl/min) with proppant loads reaching 300,000 lbm. As zone lengths are increased and multizone operations are performed, jobs requiring 60 bbl/min pump rates with proppant loads reaching 1,500,000 lbm are becoming more typical. The current frac packing tool designs must be optimized to accommodate the higher pump rates and proppant volumes required to complete these deepwater wells. Extensive research and development, including computational fluid dynamics analysis and scale-model erosion testing, have led to the development of a new series of sand control tools that have been optimized for ultra-high-rate frac packing applications. Analyzing various patterns such as velocity, fluid path, erosion, and sand concentration at high rates helps identify critical areas within the system that require design optimization. Results from full-scale erosion qualification testing of this new series of sand control tools are discussed. The qualification tests are designed to simulate extreme applications for tools in terms of pump rate, treatment volumes, and proppant properties, while testing conditions remain consistent with actual job specifications. The qualification test parameters were chosen to emulate and, in some cases, exceed the parameters of frac pack treatments currently being planned for the deepwater Gulf of Mexico. Erosion properties of the crossover, extension, and casing will be discussed, and depicted.


  • A Pragmatic Approach to Frac-Pack Tool Erosion Qualification Testing

    by Nicholas Jacob Clem, Aaron C. Hammer, Maria M. O'COnnell, Anderson da Amaral

    Frac packing tool erosion is a growing concern as more high-profile deepwater wells are completed using this technique. Today many deepwater wells require frac pack pump rates of at least 40 barrels per minute (bbl/min) with proppant loads reaching 300,000 lbm. As zone lengths are increased and multizone operations are performed, jobs requiring 60 bbl/min pump rates with proppant loads reaching 1,500,000 lbm are becoming more typical. The current frac packing tool designs must be optimized to accommodate the higher pump rates and proppant volumes required to complete these deepwater wells. Extensive research and development, including computational fluid dynamics analysis and scale-model erosion testing, have led to the development of a new series of sand control tools that have been optimized for ultra-high-rate frac packing applications. Analyzing various patterns such as velocity, fluid path, erosion, and sand concentration at high rates helps identify critical areas within the system that require design optimization. Results from full-scale erosion qualification testing of this new series of sand control tools are discussed. The qualification tests are designed to simulate extreme applications for tools in terms of pump rate, treatment volumes, and proppant properties, while testing conditions remain consistent with actual job specifications. The qualification test parameters were chosen to emulate and, in some cases, exceed the parameters of frac pack treatments currently being planned for the deepwater Gulf of Mexico. Erosion properties of the crossover, extension, and casing will be discussed, and depicted.


  • A Gravel Pack System That Allows Continuous Chemical Treatment to the Pay Zone Without Interrupting Production

    by Nilufer Darius Surveyor, Anderson Da Silva Amaral, Garry Kaiser, Nervy Enrique Faria, Kerry Gault, Mario Germino F. da Silva, Heleno Moura, João Nuno, Keith Woodford

    The use of semisubmersible rigs, subsea trees and workovers in deepwater wells result in costly rig mobilization. Solving problems remotely, with an interventionless method, provides huge savings and fewer risks to the operator. This paper focuses on the preparation of the first global installation of a gravel pack system that allows continuous chemical treatment pumping to the pay zone area without interrupting production. For wells with production issues such as barium and calcium sulfates causing obstruction of the sand-control screen base-pipe holes, this system will allow pumping of scale inhibitors (or any other chemical treatment) to the end of the horizontal well (toe) or to other parts of open-hole or cased-hole sections without needing to stop production. This system was designed to allow continuous pumping of chemicals to inhibit scaling, corrosion and other production-related issues through one small-diameter flowline down to the interior of the sand control screens at two or more distinct parts of the well (while the well is still producing) or per a specific treating program. The number of injection nodes with the same flowline conduit can vary from well to well because the system incorporates zonal isolation with feed through capabilities, using reactive element packer and multiple sequential injection nipples technology. The first installation will require only two nodes. The system allows for screen assembly and gravel pack installation in one trip, while the flowline conduit reconnects the upper string assembly, using an anchor reconnect seal assembly. For the horizontal open hole installation, the system also incorporates a high-flow liner system for flowline conduit/sensors protection and a special feed through quick connector to simplify certain steps in the assembly, and it allows for torque transmission in open hole deployment. This paper will describe the system functionality, identify its main components and present the test program developed to demonstrate the system consistently, qualifying it for field installation.

  • Real-Time Monitoring of Sand Control Completions

    by Denise M. Earles, Carl W. Stoesz, Anderson Da Silva Amaral, Jeremiah Glen Pearce, Hans A. DeJongh, Frederick H.K. Rambow

    Subsurface geomechanical stresses can cause formation faults, slippage, and compaction. These movements result in well failures, impacting production and resulting in significant expense and lost revenue. Traditional means for detecting such failures are limited and usually require interrupting production to re-enter the well, resulting in late detection of the problem and limited counteractive options. A fiber optic support device has been developed to permanently monitor strain and temperature on sand screen products for gravel-pack and frac-pack applications. This technology, especially when paired with an optical wet connect, provides for long-term reservoir monitoring at the sand face, resulting in early detection of subsurface movements at a high resolution. With this information, operators can plan early mitigative actions, and monitor the results of these actions in real time. This fiber support device provides a means of holding a helically wrapped optic fiber rigidly in place at the sand face, with no negative impact on the sand control functionality of the sand screens. New techniques were developed to manufacture this technology, as well as a new method to install the fiber. Dry connects have also been developed to allow connections between individual sand screens and enable longer monitored intervals. The paper will describe this new technology, review test results to date, and discuss potential applications.