Mingbo Zhang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Mingbo Zhang has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Fang Zhao
Environmental Development Center of the Ministry of Ecology and Environment, Beijing 100029, China
1 shared publication - Jingang Shi
Environmental Development Centre of Ministry of Environmental Protection Yuhuinanlu No.1 Chaoyang District Beijing China
1 shared publication - Paul P. J. Gaffney
Key Laboratory of Water Cycle and Related Land Surface Processes, Institute of Geographic Sciences and Natural Resources Research, Chinese Academy of Sciences, Beijing, China
1 shared publication - Xiangbo Xu
Key Laboratory of Ecosystem Network Observation and Modeling, Institute of Geographic Sciences and Natural Resources Research, Chinese Academy of Sciences, Beijing 100101, China
1 shared publication - Yifei Zhang
Environmental Development Centre of Ministry of Environmental Protection Yuhuinanlu No.1 Chaoyang District Beijing China
1 shared publication - Yuan Li
Environmental Development Center of the Ministry of Ecology and Environment, Beijing 100029, China
1 shared publication
Latest Publications
- Open Access
- 26 December 2024
- Published by MDPI AG in Sustainability
- Vol. 17 (1) , 84
Application of Life Cycle Assessment to Policy Environmental Impact Assessment—A Clean Energy Action Plan Case Study in Qinghai Region
Due to significant political and environmental decisions regarding clean energy, rapid adoption of solar photovoltaic (PV), wind power, and hydropower is taking place. In China, policy environmental impact assessment (EIA) plays an important role in pollution prevention, while its practice is relatively limited due to insufficient methodologies and weak legislative enforcement. Taking the clean energy action plan (CEAP) in the Qinghai region as a case study, this study explored the application of life cycle assessment (LCA) to evaluate the potential environmental impacts imposed by the installment capability of 70,000 MW solar PV in pristine areas. It was found that the CO2 emissions of solar PV are less than 3% of that of clean coal-fired power, while the emissions of pollutants such as sulfur dioxide, nitrogen oxides, and particulate matter only account for about 18~27% of coal-fired power. Meanwhile, from the full life cycle perspective, 4.61 million tons of solar PV panel waste will be generated, and 4172 square kilometers of land surface area will be occupied. Herein, implications for policy are proposed, including (1) advance planning of local waste disposal capacity and processing facilities, (2) the integration of clean energy planning with legal ecological environment protection schemes, and (3) rational planning of upstream and downstream solar PV industries.
- 26 December 2024
- Published by MDPI AG in Sustainability
- Vol. 17 (1) , 84
Open AccessApplication of Life Cycle Assessment to Policy Environmental Impact Assessment—A Clean Energy Action Plan Case Study in Qinghai Region
Due to significant political and environmental decisions regarding clean energy, rapid adoption of solar photovoltaic (PV), wind power, and hydropower is taking place. In China, policy environmental impact assessment (EIA) plays an important role in pollution prevention, while its practice is relatively limited due to insufficient methodologies and weak legislative enforcement. Taking the clean energy action plan (CEAP) in the Qinghai region as a case study, this study explored the application of life cycle assessment (LCA) to evaluate the potential environmental impacts imposed by the installment capability of 70,000 MW solar PV in pristine areas. It was found that the CO2 emissions of solar PV are less than 3% of that of clean coal-fired power, while the emissions of pollutants such as sulfur dioxide, nitrogen oxides, and particulate matter only account for about 18~27% of coal-fired power. Meanwhile, from the full life cycle perspective, 4.61 million tons of solar PV panel waste will be generated, and 4172 square kilometers of land surface area will be occupied. Herein, implications for policy are proposed, including (1) advance planning of local waste disposal capacity and processing facilities, (2) the integration of clean energy planning with legal ecological environment protection schemes, and (3) rational planning of upstream and downstream solar PV industries.
- Open Access
- 29 May 2018
- Published by Atlantis Press SARL
Some Suggestions on the construction of Planning Environmental Impact Assessment system
- 29 May 2018
- Published by Atlantis Press SARL
Open AccessSome Suggestions on the construction of Planning Environmental Impact Assessment system