Branko Pejović
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Branko Pejović has a total of 17 co-authors. Here are the top co-authors by number of shared publications:
- Jelena Lukić
Univerzitet u Beogradu Elektrotehnički institut Nikola Tesla Koste Glavinića 8a 11000 Beograd Srbija
2 shared publications - Uroš Radoman
Nikola Tesla Institute of Electrical Engineering, University of Belgrade, Belgrade, Serbia
2 shared publications - Valentina Vasović
Laboratory for Testing and Calibration, Electrical Engineering Institute Nikola Tesla, Koste Glavinica 8a, 11000 Belgrade, Serbia
2 shared publications - Aleksandar Žigić
Univerzitet u Beogradu Elektrotehnički institut Nikola Tesla Koste Glavinića 8a 11000 Beograd Srbija
1 shared publication - Dragan Teslić1 shared publication
- Draginja Mihajlović
Laboratory for Testing and Calibration, Electrical Engineering Institute Nikola Tesla, Koste Glavinica 8a, 11000 Belgrade, Serbia
1 shared publication
Latest Publications
- Open Access
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Zbornik Radova, Elektrotehnicki Institut Nikola Tesla
- No. 35,p. 147-167
Technical specifications for the procurement of power transformers
This paper analyzes the provisions and significance of Internal Standard IS 2, which defines the electrotechnical requirements and methodology for developing technical specifications for the procurement of new and the revitalization of existing power transformers (PT) within the electric power system. The primary objective of the standard is to establish uniform guidelines that ensure high levels of quality, safety, and energy efficiency, while maintaining full compliance with current national (SRPS) and international (EN, CIGRE) regulations. Standard IS 2 is applicable to oil-immersed power transformers with a rated power of 5 MW and above and voltages from 6.3 kV, including generator step-up (GSU) transformers, unit auxiliary transformers, and station service transformers in thermal and hydroelectric power plants. The paper provides a detailed overview of all stages of the equipment lifecycle-ranging from the definition of functional purpose and operating conditions, through the design, manufacturing, and transport processes, to onsite installation, testing, and commissioning. Particular emphasis is placed on addressing the challenges of inadequate documentation for legacy units by introducing modern materials and advanced technological solutions.
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Zbornik Radova, Elektrotehnicki Institut Nikola Tesla
- No. 35,p. 147-167
Open AccessTechnical specifications for the procurement of power transformers
This paper analyzes the provisions and significance of Internal Standard IS 2, which defines the electrotechnical requirements and methodology for developing technical specifications for the procurement of new and the revitalization of existing power transformers (PT) within the electric power system. The primary objective of the standard is to establish uniform guidelines that ensure high levels of quality, safety, and energy efficiency, while maintaining full compliance with current national (SRPS) and international (EN, CIGRE) regulations. Standard IS 2 is applicable to oil-immersed power transformers with a rated power of 5 MW and above and voltages from 6.3 kV, including generator step-up (GSU) transformers, unit auxiliary transformers, and station service transformers in thermal and hydroelectric power plants. The paper provides a detailed overview of all stages of the equipment lifecycle-ranging from the definition of functional purpose and operating conditions, through the design, manufacturing, and transport processes, to onsite installation, testing, and commissioning. Particular emphasis is placed on addressing the challenges of inadequate documentation for legacy units by introducing modern materials and advanced technological solutions.
- Open Access
- 1 January 2024
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Zbornik Radova, Elektrotehnicki Institut Nikola Tesla
- No. 34,p. 61-82
Concept and application of Digital Twins for oil-immersed power transformers
This paper provides a literature review and establishes the state-of-the-art in the concept and application of Digital Twin (DT) technology to power transformers. The introductory sections focus on the evolving definition and universal concepts of DT, independent of specific fields of application, as well as the goals of Industry 4.0 and the technologies that enable digital transformation in industry. Special attention is given to the particularities of the power industry, with an emphasis on the unique requirements posed by the nature and importance of oil-filled power transformers, which serve as the foundation for the development of systems based on DT technologies.
- 1 January 2024
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Zbornik Radova, Elektrotehnicki Institut Nikola Tesla
- No. 34,p. 61-82
Open AccessConcept and application of Digital Twins for oil-immersed power transformers
This paper provides a literature review and establishes the state-of-the-art in the concept and application of Digital Twin (DT) technology to power transformers. The introductory sections focus on the evolving definition and universal concepts of DT, independent of specific fields of application, as well as the goals of Industry 4.0 and the technologies that enable digital transformation in industry. Special attention is given to the particularities of the power industry, with an emphasis on the unique requirements posed by the nature and importance of oil-filled power transformers, which serve as the foundation for the development of systems based on DT technologies.
- 1 December 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Dielectrics and Electrical Insulation
- Vol. 26 (6) , 1847-1852
Aging of transformer insulation of experimental transformers and laboratory models with different moisture contents: Part II — moisture distribution and aging kinetics
- 1 December 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Dielectrics and Electrical Insulation
- Vol. 26 (6) , 1847-1852
Aging of transformer insulation of experimental transformers and laboratory models with different moisture contents: Part II — moisture distribution and aging kinetics