Jiawei Wang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Jiawei Wang has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Dinglei Huang
School of Architecture and Civil Engineering, Xi’an University of Science and Technology, Xi’an 710054, China
3 shared publications - Ping Cao
School of Architecture and Civil Engineering, Xi’an University of Science and Technology, Xi’an 710054, China
3 shared publications - Zhi Cao
School of Architecture and Civil Engineering, Xi’an University of Science and Technology, Xi’an 710054, China
3 shared publications - Danyang Li
School of Architecture and Civil Engineering, Xi’an University of Science and Technology, Xi’an 710054, China
2 shared publications
Latest Publications
- Open Access
Hybrid Model for BIM Application Maturity in Prefabricated Buildings: A Case Study in Xi’an, China
Building Information Modeling (BIM) has recently gained popularity in the public building industry, and BIM is widely implemented in the construction industry in many developed countries around the world. In this paper, in order to evaluate the application level of BIM technology in assembly buildings in China, five maturity levels of BIM application in assembly buildings are established based on the commonly used maturity model, including the initial level, the starting level, the management level, the integration level, and the continuous optimization level. In order to construct a maturity evaluation index system for BIM application in prefabricated buildings, the literature review method was chosen to identify the indexes initially, the indexes were optimized by combining the questionnaire survey method, and using the balanced scorecard model, the maturity evaluation index system for BlM application in prefabricated buildings consisting of one target level, five guidance levels, thirteen graded element levels and thirty-one secondary index levels were identified. Based on this framework, the study establishes a maturity assessment model for BIM application in prefabricated buildings through three methodological integrations. First, the hierarchical analysis method Analytic Hierarchy Process (AHP) was employed to assign weights to indexes within the evaluation system. Subsequently, the Entropy Weight Method (EWM) was utilized to systematically construct the index system. This quantitative foundation was then combined with fuzzy comprehensive evaluation principles to develop the integrated assessment model. The practical application of this model was demonstrated through a case study of a prefabricated building project in China. The assessment results revealed that the project’s BIM application maturity level falls within the transitional phase “between the management level and integrated level”, indicating progressive but not yet fully optimized implementation. The result verifies the validity of the assessment model and proposes corresponding optimization suggestions based on the assessment results.
Open AccessHybrid Model for BIM Application Maturity in Prefabricated Buildings: A Case Study in Xi’an, China
Building Information Modeling (BIM) has recently gained popularity in the public building industry, and BIM is widely implemented in the construction industry in many developed countries around the world. In this paper, in order to evaluate the application level of BIM technology in assembly buildings in China, five maturity levels of BIM application in assembly buildings are established based on the commonly used maturity model, including the initial level, the starting level, the management level, the integration level, and the continuous optimization level. In order to construct a maturity evaluation index system for BIM application in prefabricated buildings, the literature review method was chosen to identify the indexes initially, the indexes were optimized by combining the questionnaire survey method, and using the balanced scorecard model, the maturity evaluation index system for BlM application in prefabricated buildings consisting of one target level, five guidance levels, thirteen graded element levels and thirty-one secondary index levels were identified. Based on this framework, the study establishes a maturity assessment model for BIM application in prefabricated buildings through three methodological integrations. First, the hierarchical analysis method Analytic Hierarchy Process (AHP) was employed to assign weights to indexes within the evaluation system. Subsequently, the Entropy Weight Method (EWM) was utilized to systematically construct the index system. This quantitative foundation was then combined with fuzzy comprehensive evaluation principles to develop the integrated assessment model. The practical application of this model was demonstrated through a case study of a prefabricated building project in China. The assessment results revealed that the project’s BIM application maturity level falls within the transitional phase “between the management level and integrated level”, indicating progressive but not yet fully optimized implementation. The result verifies the validity of the assessment model and proposes corresponding optimization suggestions based on the assessment results.
- Open Access
Research on Dynamic Optimization of a Critical Path Based on Stochastic Duration and the Earned Value Method
Critical paths are widely used in project schedule management, but most existing studies ignore the volatility and dynamic characteristics of project duration, which increases the risk of project implementation. This paper proposes a dynamic optimization model of random duration and the EVM (earned value method) based on critical path technology. The random duration based on a lognormal distribution is introduced into critical path technology, and the completion probability model is established to evaluate the fluctuation of the project completion schedule. Then, the earned value correction model is established and combined with performance indicators to improve the dynamic management system of proactive scheme scheduling and reactive scheme scheduling. The proposed method can fully consider the fluctuation and dynamics of the project duration, effectively reduce the errors caused by the uncertain fluctuation of the duration, and further improve scientific management and reduce management costs.
Open AccessResearch on Dynamic Optimization of a Critical Path Based on Stochastic Duration and the Earned Value Method
Critical paths are widely used in project schedule management, but most existing studies ignore the volatility and dynamic characteristics of project duration, which increases the risk of project implementation. This paper proposes a dynamic optimization model of random duration and the EVM (earned value method) based on critical path technology. The random duration based on a lognormal distribution is introduced into critical path technology, and the completion probability model is established to evaluate the fluctuation of the project completion schedule. Then, the earned value correction model is established and combined with performance indicators to improve the dynamic management system of proactive scheme scheduling and reactive scheme scheduling. The proposed method can fully consider the fluctuation and dynamics of the project duration, effectively reduce the errors caused by the uncertain fluctuation of the duration, and further improve scientific management and reduce management costs.
- Open Access
- 12 January 2025
- Published by MDPI AG in Sustainability
- Vol. 17 (2) , 540
Evaluation and Analysis of Passive Energy Saving Renovation Measures for Rural Residential Buildings in Cold Regions: A Case Study in Tongchuan, China
Energy-saving renovation of rural residences is an effective means of promoting sustainable rural development. This study focuses on a single-story rural residential building located in Tongchuan City, Shaanxi Province, China (a cold region), as a case study. Retrofits were conducted on the exterior windows, roof, and exterior walls, with the addition of a sunroom. Using life cycle assessments (LCAs) and orthogonal experimental methods combined with value engineering principles, we calculated various indicators including the energy efficiency improvement rate, implied carbon emissions, proportion of implied carbon emissions, carbon footprint, carbon reduction rate, carbon payback period, and investment payback period. The impact of traditional retrofitting measures on these indicators was analyzed. The results indicate that carbon emissions from the production of building materials are a key concern among the embodied carbon emissions from the retrofits, while transportation, construction, and demolition contribute minimally. Changes in the depth of the sunroom had the most significant impact on comprehensive indicators, followed by changes to the roof. After retrofitting, the carbon reduction rate was underestimated by 9.35% to 12.02% due to embodied carbon emissions. The carbon payback period for all schemes is estimated to be between 3.27 and 4.21 years. Based on current market conditions, developing corresponding carbon economics can enhance the economic viability of the project. This approach extends the investment payback period by more than 7% while also helping to narrow the income gap between urban and rural residents to some extent. Overall, the environmental impact assessment of the alternative schemes promotes sustainable rural development and provides scientific and effective guidance for the construction of project decision-making evaluation systems and architectural designers.
- 12 January 2025
- Published by MDPI AG in Sustainability
- Vol. 17 (2) , 540
Open AccessEvaluation and Analysis of Passive Energy Saving Renovation Measures for Rural Residential Buildings in Cold Regions: A Case Study in Tongchuan, China
Energy-saving renovation of rural residences is an effective means of promoting sustainable rural development. This study focuses on a single-story rural residential building located in Tongchuan City, Shaanxi Province, China (a cold region), as a case study. Retrofits were conducted on the exterior windows, roof, and exterior walls, with the addition of a sunroom. Using life cycle assessments (LCAs) and orthogonal experimental methods combined with value engineering principles, we calculated various indicators including the energy efficiency improvement rate, implied carbon emissions, proportion of implied carbon emissions, carbon footprint, carbon reduction rate, carbon payback period, and investment payback period. The impact of traditional retrofitting measures on these indicators was analyzed. The results indicate that carbon emissions from the production of building materials are a key concern among the embodied carbon emissions from the retrofits, while transportation, construction, and demolition contribute minimally. Changes in the depth of the sunroom had the most significant impact on comprehensive indicators, followed by changes to the roof. After retrofitting, the carbon reduction rate was underestimated by 9.35% to 12.02% due to embodied carbon emissions. The carbon payback period for all schemes is estimated to be between 3.27 and 4.21 years. Based on current market conditions, developing corresponding carbon economics can enhance the economic viability of the project. This approach extends the investment payback period by more than 7% while also helping to narrow the income gap between urban and rural residents to some extent. Overall, the environmental impact assessment of the alternative schemes promotes sustainable rural development and provides scientific and effective guidance for the construction of project decision-making evaluation systems and architectural designers.