Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Ali Istanbullu has a total of 19 co-authors. Here are the top co-authors by number of shared publications:

  • Abubakar S. Mahmoud

    Department of Facilities and Construction Project Management, International College of Engineering and Management, Affiliated with the University of Lancashire, UK, P.O. Box 2511, Muscat 111, Oman

    3 shared publications
  • Majed A. A. Aldahdooh

    Department of Facilities and Construction Project Management, International College of Engineering and Management, Affiliated with the University of Lancashire, UK, P.O. Box 2511, Muscat 111, Oman

    3 shared publications
  • Rami Hamad

    Department of Facilities and Construction Project Management, International College of Engineering and Management, Affiliated with the University of Lancashire, UK, P.O. Box 2511, Muscat 111, Oman

    3 shared publications
  • Abubakar Sadiq Mahmoud

    Interdisciplinary Research Center for Construction and Building Materials King Fahd University of Petroleum and Minerals 31261 Dhahran Saudi Arabia

    2 shared publications
  • Faris Omer

    Department of Health, Safety and Environmental Management, International College of Engineering and Management, Affiliated with the University of Lancashire UK, P.O. Box 2511, Muscat 111, Oman

    2 shared publications
  • Victor Olabode Otitolaiye

    International College of Engineering and Management Muscat, Oman

    2 shared publications

Latest Publications

  • Open Access

    Selection–Performance Decoupling in Construction Contractor Assurance: A Configurational Theory of Displayed Provision and Enacted Capability

    by Abubakar S. Mahmoud, Said Saif Salim Almaawali, Ali Istanbullu, Rami Hamad, Majed A. A. Aldahdooh, Mustafa Maher Al-Tayeb

    Construction clients assess contractor assurance before award, and the instruments they commonly use, including prequalification questionnaires, industry assessment standards and management-system certificates, report a single position on a single continuum. This conceptual paper develops a theory that instead treats construction contractor assurance as two different kinds of dimensions: enacted assurance capability, the routines a contractor performs, and displayed assurance provision, the artefacts through which those routines are represented to outsiders. The two differ in a property that configurational theory has not treated as consequential, namely what it costs an external assessor to establish a contractor’s position on each. Where assessment is predominantly documentary, and assessors face binding limits on budget, access and time, displayed provision is cheaper to verify and is therefore argued to receive greater relative weight in prequalification and selection, whereas enacted capability retains the stronger direct association with delivery performance. The paper names this divergence selection–performance decoupling and distinguishes it from the policy–practice decoupling described within organisations. Integrating capability theory, institutional theory and work on organisational routines, it derives four contractor archetypes, Embedded, Declarative, Silent and Minimal, and six propositions with explicit scope conditions and falsification criteria, developed for health and safety assurance. It identifies a reflexivity problem in contractor assessment: instruments assess the cheaper dimension more reliably than the practice it represents, and conventional improvement may deepen rather than correct this. A three-stage assessment model is proposed. The paper is a theory-development contribution; it reports no empirical tests, and it advances propositions as falsifiable claims rather than findings.

  • Open Access

    Perceived Importance of Construction Safety Performance Factors and Industry 4.0 Safety Technologies in the Saudi Arabian Construction Industry: An Exploratory Assessment

    by Abubakar S. Mahmoud, Mohammad A. Hassanain, Ali Istanbullu, Victor Olabode Otitolaiye, Faris Omer, Muizz O. Sanni-Anibire, Yakubu Aminu Dodo

    Driven by Vision 2030, the construction industry in the Kingdom of Saudi Arabia (KSA) has expanded rapidly. This expansion has raised concerns about safety performance and created a need to identify the factors that most strongly influence safety outcomes. This study is an exploratory, perception-based investigation into the perceived importance of factors affecting construction safety performance and into the perceived value of emerging Industry 4.0 technologies in improving it. Data were collected from 68 construction engineering professionals using a structured questionnaire covering 50 safety-related factors across five domains: management, worker, equipment and environmental, organisational and policy, and technology integration. The Importance Index (I) method was used to analyse the responses, and the domain-level results are reported as descriptive prioritisations rather than as statistically validated constructs. The three highest-rated items were lack of management commitment to safety programmes (I = 91.2%), inadequate and infrequent safety training (I = 89.7%), and absence of safety awareness among top management (I = 88.5%), followed closely by weak enforcement of safety regulations (I = 87.4%). At the domain level, management-related factors recorded the highest mean (I = 81.7%), ahead of worker-related factors (I = 79.5%) and technology integration (I = 75.0%). Although respondents identified artificial intelligence (AI), the Internet of Things (IoT), virtual and augmented reality (VR/AR), building information modelling (BIM), and drones as valuable safety enablers, they rated organisational and human factors as more important than the technologies themselves. Extreme heat and adverse weather conditions (I = 81.7%) emerged as a leading environmental risk, underlining the need for climate-specific safety interventions in the KSA context. Heat stress could be considered a notable concern in this context, as construction work in KSA is often performed outdoors during extended periods of high summer temperatures, which can elevate the risk of heat exhaustion, heat stroke, and fatigue-related incidents. This contrasts with the more temperate conditions of many international comparator studies and helps to explain why respondents treat heat as a leading environmental concern. To the authors’ knowledge, this is among the few exploratory studies to bring management, workforce, policy, environmental, and Industry 4.0 technology determinants together within a single KSA-specific framework. The findings contribute to both theory and practice in construction safety by identifying priority areas for intervention and by providing a basis for future large-scale confirmatory studies.

  • Open Access

    Effect of Polypropylene Fibre Dosage on Portland Cement Concrete: Early-Age Compressive Strength, Workability, and Practical Dosage Guidance

    by Abubakar S. Mahmoud, Salwa Al Siyabi, Rami Hamad, Majed A. A. Aldahdooh, Ali Istanbullu, Seema Shajira, Azza Humaid Al Saaidi

    The present study was conducted to systematically investigate the effect of adding Polypropylene (PP) fibre at various dosages (0–1.0 kg/m3) on the compressive strength and workability of Blended Portland Cement concrete. All mix variables were kept constant except for fibre content (w/c = 0.45), thereby allowing the dosage effect to be isolated. Standard-sized 150 × 150 × 150 mm cubes were prepared and tested for slump (ASTM C143), fresh density and early-age compressive strength BS 1881-116:1983 at 7 days and 14 days. Slump decreased monotonically from 200 mm to 160 mm as the dosage increased and remained within the EN 206 S4 (High) workability class throughout. Fresh density was essentially unaffected. The early-age compressive strength increased continuously for both test ages, reaching 51.7 MPa at 1.0 kg/m3 at 14 days. One-way analysis of variance confirmed a statistically significant dosage effect at both ages (7-day p < 0.001; 14-day p = 0.003). Based on the strength-workability trade-off, it was found that a pragmatic recommended dosage range is 0.6–0.8 kg/m3, which gives an appreciable strength improvement with a moderate decrease in workability without the need for the addition of extra admixtures. These results offer early age mix design guidance for practitioners and engineers in a wide range of construction applications and can be used to calculate a potential circular economy impact for the mix design: a 100 m3 pour at 0.8 kg/m3 could potentially divert 80 kg of PP waste from landfill or incineration if recycled PP fibres were used instead of the virgin fibres used in the study.


  • Open Access

    Rice Husk Ash in Sustainable Concrete: A Hybrid Bibliometric and Systematic Review of Performance, Durability, and Data-Driven Material Design

    by Ali Istanbullu, Abubakar S. Mahmoud, Rami Hamad, Majed A. A. Aldahdooh

    Rice husk ash (RHA) has emerged as a promising supplementary cementitious material (SCM) for sustainable construction due to its high silica content and potential to reduce the environmental impact of concrete. However, the evolution of RHA research and its transition toward advanced, data-driven material systems remain insufficiently synthesised. This study presents an integrated bibliometric analysis (BA) and systematic literature review (SLR) in which Scopus-indexed publications from 2007 to 2021 establish the historical evolution and structural dynamics of the field, while studies published between 2022 and 2026 are systematically reviewed to capture emerging developments and ensure contemporary relevance. The bibliometric analysis reveals a steady increase in research activity and identifies a shift from experimental material optimisation toward sustainability and computational modelling. When interpreted alongside the systematic review findings, this trend reflects a structured Past–Present–Future evolution of RHA research, from feasibility studies to microstructural optimisation and, more recently, to predictive and data-driven material design. The systematic review confirms that optimally processed RHA, typically at 10–30% cement replacement, enhances compressive strength, durability, and resistance to aggressive environments through improved pozzolanic reactivity and microstructural densification. Recent studies (2022–2026) further demonstrate the integration of machine learning, life-cycle assessment, and digital modelling approaches for performance prediction, mix optimisation, and sustainability evaluation. By linking bibliometric trends with scientific insights, this study identifies key research gaps, including the lack of standardisation in RHA production, limited large-scale validation, and weak integration of experimental and computational approaches, and proposes an integrated five-tier framework, moving from material standardisation through performance validation and computational intelligence to sustainability integration and industrial-policy adoption, to guide future research and implementation. The findings highlight the transition of RHA from a conventional SCM to a component of intelligent, sustainable, and circular construction systems, providing a foundation for future research and industrial application.


  • Open Access

    Enhancing Construction Project Resilience Through Emerging Technologies: A Research-to-Practice Framework

    by Abubakar S. Mahmoud, Ali Istanbullu, Victor Olabode Otitolaiye, Faris Omer

    This study presents an integrated bibliometric analysis (BA) and systematic literature review (SLR) of construction safety research (CSR) to examine its evolution and emerging technological directions. It aims to move beyond descriptive mapping by linking long-term research trends with recent technological advancements to provide a structured understanding of how construction safety is transitioning toward data-driven and resilient systems. Utilising the PRISMA-guided approach, 1979 publications were analysed, revealing an average annual growth rate of 18%, driven by increasing safety concerns and the rapid implementation of digital technologies. The findings demonstrate that conventional safety research, centred on hazard identification, safety culture, and management commitment, is gradually being complemented by advanced technologies such as artificial intelligence (AI), machine learning (ML), extended reality (XR), and digital twins. These technologies enable predictive risk assessment, real-time monitoring, and immersive training, supporting a shift from reactive to proactive safety management. Despite these advancements, critical gaps remain, including limited real-world validation of AI-based systems, insufficient integration of technologies into cohesive frameworks, and underexplored socio-cultural factors influencing adoption. These challenges were addressed by proposing a research-to-practice framework for integrating emerging technologies into construction safety management. The framework incorporates technological, organisational, and human factors to enhance adaptability, risk management, and overall construction project resilience. Additionally, the research contributes to the body of knowledge by providing a comprehensive and analytically grounded framework that bridges the gap between research and practical implementation, while also identifying future research directions to support the development of intelligent, resilient, and adaptive construction safety systems.


  • Open Access

    Sustainable building production adopting an optimized BIM phasing system

    by Ali Istanbullu, Emad A. Omar

    Sustainable building production could be achieved through better economic efficiency, reduced site waste, and a safe working environment. The identification of the creation phase for each element in the building information model (BIM) is manually done by experienced engineers able to integrate technical construction constraints and an appropriate workflow of construction activities. It is a difficult and complex task to be done. Experienced engineers iterate this operation several times until an adequate solution is achieved without real possibility of optimization. The development of an assistance tool to optimize phase identification of BIM elements included in the repetitive floor plan considering varied evaluation criteria and technical construction constraints should lead to significant economic and environmental profits: reduction of needed construction resources and related waste, improvement of construction quality, and better conditions of site safety. The optimization tool presented in this paper provides better solutions for repetitive floor plans specifically through balanced quantities of work hours and a lower quantity of needed formworks. A reduction of around 10% of labour and 25% of non-used formwork is achieved, which significantly improves site safety, productivity, and profitability. The validity of the presented results is substantiated by multiple examples from real construction sites that have been analyzed in this study.


  • Open Access

    Assessing the sustainability of repetitive floor plan using Building Information Modelling-DIGITAL TWINS framework

    by Ali Istanbullu, Emad Alabo Omar, Mohammed Aijoma

    Various factors, including the nature of the utilized equipment, labour expertise, availability of resources, and meteorological circumstances, might impact the efficiency of work on construction sites. As a result, site and planning engineers must continuously monitor and assess construction progress considering site conditions and the performance of used construction resources. In multi-storey buildings, repetitive floor construction plan impacts enormously construction site sustainability. To identify an optimal set of construction resources, this paper presents Building Information Modelling-DIGITAL-TWINs (BIMDTs) framework, which planners and site engineers can use to easily monitor and control workflow progress of the repetitive floor. Using a digital model, DTs replicate the actual workflow process on a building site and guarantee a consistent information flow. To guarantee information flow between the building site and the digital model, several communication technology tools could be deployed and tested (High-definition site construction camera, regular site monitoring using drones, infrared smart sensors, etc.). The initial results of this research show an important improvement in the sustainability of construction sites. Reduced formworks oil consumption, improved human resource safety, and increased site resource profitability were observed in several treated real cases.

  • Open Access

    BIM Digital twins environment to enhance construction process

    by A Istanbullu, S Wamuziri, M Siddique

    Nowadays, the quality of life is mostly related to the quality of construction. Poor performance of construction project could be related to the poor quality of used construction materials but also to the unsuitable construction processes. BIM methodology adopted an innovative and more effective workflow in construction process. Benefits of BIM are widely recognized and documented including enhanced communication and collaboration between stakeholders, effective decision-making and monitoring, reduced construction cost and duration, etc. However, there is a lot of construction process related information outside of BIM methodology like ERP and building automation system. Digital Twins (DTs) contribute to smart construction through the integration of artificial intelligence, machine learning and data analytics. As construction projects are getting more complex and need more advanced and integrated tools to achieve economic and sustainability objectives, this work proposes a new construction system using the power of digital twins (DTs) and BIM to improve construction process. Genetic algorithm is used to optimize repetitive floor construction cycle. it is reasonable to expect a reduction of 25% of unused resources, which greatly improves site productivity and obtain better economic efficiency. In addition, the working and safety conditions of workers are improved since daily rates of working hours are balanced.