Tausif Ahmed Ishtiaque
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Tausif Ahmed Ishtiaque has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
Ole Jonny Klakegg
Norwegian University of Science and Technology Department of Civil and Environmental Engineering
2 shared publications- Allen Tadayon
Oslo Metropolitan University
1 shared publication - Nadina Memić
Department of Civil and Environmental Engineering, Norwegian University of Science and Technology (NTNU), 7491 Trondheim, Norway
1 shared publication - Nils O. E. Olsson
Department of Mechanical and Industrial Engineering, Norwegian University of Science and Technology, Trondheim, Norway
1 shared publication - Ola Lædre
NTNU
1 shared publication Paulos Abebe Wondimu
Department of Civil and Environmental Engineering, Norwegian University of Science and Technology (NTNU)
1 shared publication
Latest Publications
- 21 May 2025
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 15 (4) , 879-893
Effects of early contractor involvement in small construction projects: lessons from Norway
Purpose: Early contractor involvement (ECI) has been heavily investigated in the context of large infrastructure projects. While there is a growing tendency among Norwegian infrastructure projects to use ECI, there is little evidence regarding the effects of ECI on small projects. This study aims to investigate the potential benefits and challenges of ECI in a small construction project in Norway. Design/methodology/approach: The research design is based on an embedded case study approach with longitudinal evaluation. The empirical data for this research comes from semi-structured interviews, survey questionnaires, focus group discussions and document analysis. Findings: The results show that ECI can benefit small projects requiring out-of-the-box thinking. The strongest arguments favoring ECI are that it promotes innovation, gives better risk adaptability, and allows participation from all client organization levels. In the case project, the onboarding of the operators was found to be especially helpful, which resulted in a more operationally optimized solution. The main challenges with using ECI for the case project were the lack of a standardized contract format, additional stress at the operational level and unfamiliarity with the overall process. Originality/value: This study provides new insights into the effects of ECI and adds to the debate regarding whether ECI can be a viable option for small construction projects in the future. The findings can give practitioners hints on optimizing ECI usage in small projects and avoiding potential pitfalls.
- 21 May 2025
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 15 (4) , 879-893
Effects of early contractor involvement in small construction projects: lessons from Norway
Purpose: Early contractor involvement (ECI) has been heavily investigated in the context of large infrastructure projects. While there is a growing tendency among Norwegian infrastructure projects to use ECI, there is little evidence regarding the effects of ECI on small projects. This study aims to investigate the potential benefits and challenges of ECI in a small construction project in Norway. Design/methodology/approach: The research design is based on an embedded case study approach with longitudinal evaluation. The empirical data for this research comes from semi-structured interviews, survey questionnaires, focus group discussions and document analysis. Findings: The results show that ECI can benefit small projects requiring out-of-the-box thinking. The strongest arguments favoring ECI are that it promotes innovation, gives better risk adaptability, and allows participation from all client organization levels. In the case project, the onboarding of the operators was found to be especially helpful, which resulted in a more operationally optimized solution. The main challenges with using ECI for the case project were the lack of a standardized contract format, additional stress at the operational level and unfamiliarity with the overall process. Originality/value: This study provides new insights into the effects of ECI and adds to the debate regarding whether ECI can be a viable option for small construction projects in the future. The findings can give practitioners hints on optimizing ECI usage in small projects and avoiding potential pitfalls.
- Open Access
- 27 September 2024
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 25 (10) , 1227-1238
Likelihood of early contractor involvement (ECI) benefits in infrastructure versus building projects: the client’s perception
- 27 September 2024
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 25 (10) , 1227-1238
Open AccessLikelihood of early contractor involvement (ECI) benefits in infrastructure versus building projects: the client’s perception
- Open Access
Exploring Pre-Construction Activities in Infrastructure Projects That Can Benefit from Contractor Involvement
The pre-construction phase of public infrastructure projects is characterized by significant uncertainty as crucial decisions are made with limited information. This early stage of project development is influenced by a multitude of factors and input from various stakeholders. While early contractor involvement (ECI) offers potential benefits for both clients and projects, the timing and selection of tasks for involving the contractor are critical to achieving these benefits. This study seeks to identify key pre-construction activities in public infrastructure projects and pinpoint the activities that stand to gain the most from ECI. The research methodology involved conducting semi-structured interviews, organizing seven workshops, and conducting the literature and document studies. Through these efforts, the study identified a total of 20 pre-construction activities, among which 5 activities emerged as the most favorable candidates for ECI, while 5 others were deemed less suitable. The findings underscore a consensus that involving contractor expertise during the Brief Development sub-phase holds significant promise. Notably, activities associated with planning, environmental considerations, and technical aspects related to the scope clarification, were found to be highly amenable to ECI. Activities addressing uncertainty management received particular attention, with clients valuing contractors’ practical experience in risk assessment and mitigation. Additionally, contractors’ insights into planning, activity dependencies, and their contributions to health, safety, and environmental plans were highly regarded. However, activities, categorized under the more technical sub-phases of Concept Development and Detailed Engineering yielded mixed results, while those falling within the predominantly social and political domain and involving political processes and societal impact, were viewed as less suitable for early contractor involvement. These findings emphasize the need to adopt a systematic and consistent approach to pre-construction activities, highlighting that ECI should not be applied as a one-size-fits-all solution. The interview results somewhat contrast with the literature findings, which indicate that the early conceptual phase is most beneficial as the contractor impact is highest. To some extent, the client, contractor, and consultant still see their benefit and strategy before the good of the project.
Open AccessExploring Pre-Construction Activities in Infrastructure Projects That Can Benefit from Contractor Involvement
The pre-construction phase of public infrastructure projects is characterized by significant uncertainty as crucial decisions are made with limited information. This early stage of project development is influenced by a multitude of factors and input from various stakeholders. While early contractor involvement (ECI) offers potential benefits for both clients and projects, the timing and selection of tasks for involving the contractor are critical to achieving these benefits. This study seeks to identify key pre-construction activities in public infrastructure projects and pinpoint the activities that stand to gain the most from ECI. The research methodology involved conducting semi-structured interviews, organizing seven workshops, and conducting the literature and document studies. Through these efforts, the study identified a total of 20 pre-construction activities, among which 5 activities emerged as the most favorable candidates for ECI, while 5 others were deemed less suitable. The findings underscore a consensus that involving contractor expertise during the Brief Development sub-phase holds significant promise. Notably, activities associated with planning, environmental considerations, and technical aspects related to the scope clarification, were found to be highly amenable to ECI. Activities addressing uncertainty management received particular attention, with clients valuing contractors’ practical experience in risk assessment and mitigation. Additionally, contractors’ insights into planning, activity dependencies, and their contributions to health, safety, and environmental plans were highly regarded. However, activities, categorized under the more technical sub-phases of Concept Development and Detailed Engineering yielded mixed results, while those falling within the predominantly social and political domain and involving political processes and societal impact, were viewed as less suitable for early contractor involvement. These findings emphasize the need to adopt a systematic and consistent approach to pre-construction activities, highlighting that ECI should not be applied as a one-size-fits-all solution. The interview results somewhat contrast with the literature findings, which indicate that the early conceptual phase is most beneficial as the contractor impact is highest. To some extent, the client, contractor, and consultant still see their benefit and strategy before the good of the project.