Chatchanan Panapiphat
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Chatchanan Panapiphat has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Ekawit Songkoh
Department of Industrial Engineering, Faculty of Engineering and Architecture, Rajamangala University of Technology Suvarnabhumi (RUS), Phra Nakhon Si Ayutthaya 13000, Thailand
2 shared publications - Pramuk Unahalekhaka
Department of Electrical Engineering, Faculty of Engineering and Architecture, Rajamangala University of Technology Suvarnabhumi (RUS), Nonthaburi 11000, Thailand
2 shared publications - Siamrat Phonkaporn
Department of Electrical Engineering, Faculty of Engineering and Architecture, Rajamangala University of Technology Suvarnabhumi (RUS), Nonthaburi 11000, Thailand
2 shared publications - Karun Sirichunchuen
Department of Electrical Engineering, Faculty of Engineering and Architecture, Rajamangala University of Technology Suvarnabhumi (RUS), Nonthaburi 11000, Thailand
1 shared publication
Latest Publications
- Open Access
- 2 February 2026
- Published by MDPI AG in Algorithms
- Vol. 19 (2) , 118
A Hybrid Machine Learning Framework for Prioritizing Battery Energy Storage System Installations for Existing CCTV: A Case Study in Latkrabang, Bangkok, Thailand
This research develops a decision support system for prioritizing Battery Energy Storage System (BESS) installations at existing closed-circuit television (CCTV) camera locations experiencing power interruptions in Latkrabang subdistrict. The methodology integrates nine validated features: outage frequency, downtime duration, maximum outage duration, Net Present Value (NPV), combined ROI, outage impact score, annual BESS cost, combined risk score, and UPS installation cost, derived from historical power outage records (2020–2023) and engineering economics calculations. An unsupervised K-means clustering algorithm, validated through silhouette analysis and the elbow method, categorizes installations into five risk levels, namely critical, very high, high, medium, and low, addressing the absence of predefined ground truth labels. Subsequently, Support Vector Machine (SVM) with hyperparameter optimization classifies priority installations using stratified train-test splitting (80:20). The model was initially developed and validated using 82 CCTV cameras from Lamphla Tiew subdistrict (the pilot area). The validated model was then successfully applied to 101 CCTV cameras in Latkrabang subdistrict (the target area), identifying 27 critical installation points requiring immediate BESS deployment. The weighted recommendation system balances data-driven clustering with scoring: NPV (35%), outage impact (25%), combined ROI (20%), maximum outage duration (10%), and BESS cost efficiency (10%).
- 2 February 2026
- Published by MDPI AG in Algorithms
- Vol. 19 (2) , 118
Open AccessA Hybrid Machine Learning Framework for Prioritizing Battery Energy Storage System Installations for Existing CCTV: A Case Study in Latkrabang, Bangkok, Thailand
This research develops a decision support system for prioritizing Battery Energy Storage System (BESS) installations at existing closed-circuit television (CCTV) camera locations experiencing power interruptions in Latkrabang subdistrict. The methodology integrates nine validated features: outage frequency, downtime duration, maximum outage duration, Net Present Value (NPV), combined ROI, outage impact score, annual BESS cost, combined risk score, and UPS installation cost, derived from historical power outage records (2020–2023) and engineering economics calculations. An unsupervised K-means clustering algorithm, validated through silhouette analysis and the elbow method, categorizes installations into five risk levels, namely critical, very high, high, medium, and low, addressing the absence of predefined ground truth labels. Subsequently, Support Vector Machine (SVM) with hyperparameter optimization classifies priority installations using stratified train-test splitting (80:20). The model was initially developed and validated using 82 CCTV cameras from Lamphla Tiew subdistrict (the pilot area). The validated model was then successfully applied to 101 CCTV cameras in Latkrabang subdistrict (the target area), identifying 27 critical installation points requiring immediate BESS deployment. The weighted recommendation system balances data-driven clustering with scoring: NPV (35%), outage impact (25%), combined ROI (20%), maximum outage duration (10%), and BESS cost efficiency (10%).
- Open Access
Optimal of Placement for Battery Energy Storage System Installation Using Fuzzy Expert System in Thailand: A Case Study of Critical Closed-Circuit Television Positions
This paper presents placement optimization for battery energy storage system installation using a fuzzy expert system. Nowadays, the Bangkok Metropolitan Administration (BMA) has installed CCTV cameras for surveillance, deterrence, and to record events as evidence for legal proceedings. However, in some areas, there is no BESS, so when the power goes out, recording cannot continue. This article uses a Fuzzy Logic Expert System to assess critical areas for the consideration of future BESS installation in Bangkok. The key factors include (1) the number of CCTV image requests from the Bangkok Metropolitan Administration, (2) the duration of power outages from the BMA, and (3) the total power consumption of the CCTV in each subdistrict. The study results show that the fuzzy expert system can effectively handle ambiguous data and improve decision-making. The Latkrabang and Lamphlatiew subdistricts have the most critical points where investment in BESS installation is most appropriate. The size of the BESS was determined based on the maximum recorded power outage duration of 57 min, with the backup power design for the BESS set at 1 h. The DIgSILENT program was used to determine the size of the BESS at each critical point, which was calculated to be 160.2 Wh.
Open AccessOptimal of Placement for Battery Energy Storage System Installation Using Fuzzy Expert System in Thailand: A Case Study of Critical Closed-Circuit Television Positions
This paper presents placement optimization for battery energy storage system installation using a fuzzy expert system. Nowadays, the Bangkok Metropolitan Administration (BMA) has installed CCTV cameras for surveillance, deterrence, and to record events as evidence for legal proceedings. However, in some areas, there is no BESS, so when the power goes out, recording cannot continue. This article uses a Fuzzy Logic Expert System to assess critical areas for the consideration of future BESS installation in Bangkok. The key factors include (1) the number of CCTV image requests from the Bangkok Metropolitan Administration, (2) the duration of power outages from the BMA, and (3) the total power consumption of the CCTV in each subdistrict. The study results show that the fuzzy expert system can effectively handle ambiguous data and improve decision-making. The Latkrabang and Lamphlatiew subdistricts have the most critical points where investment in BESS installation is most appropriate. The size of the BESS was determined based on the maximum recorded power outage duration of 57 min, with the backup power design for the BESS set at 1 h. The DIgSILENT program was used to determine the size of the BESS at each critical point, which was calculated to be 160.2 Wh.