YLYan Long

Yan Long

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Yan Long has a total of 8 co-authors. Here are the top co-authors by number of shared publications:

  • Jiahong Li

    State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research, Beijing, 100038, China

    1 shared publication
  • Wenjuan Chang

    China Three Gorges University, Yichang, Hubei, 443002, China

    1 shared publication
  • Xiaohui Lei

    State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research, Beijing, 100038, China

    1 shared publication
  • Ye Yao

    State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300072, China

    1 shared publication
  • Yilin Yang

    State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300072, China

    1 shared publication
  • Youming Li

    Bgi Engineering Consultants LTD, Beijing, 100038, China

    1 shared publication

Latest Publications

  • Open Access

    Fast and optimal decision for emergency control of sudden water pollution accidents in long distance water diversion projects

    by Yu Qiao, Xiaohui Lei, Yan Long, Jiahong Li, Yilin Yang, Yu Tian, Youming Li, Ye Yao, Wenjuan Chang

    Long distance water diversion projects transfer clean water to cities for industrial, agricultural and domestic use; there is a great risk of sudden water pollution accidents. Without a fast and optimal decision for emergency control in response to sudden water pollution accidents, dispatchers or decision-makers will not be prepared to respond to the accidents during the process of an emergency spill. To address this gap, a framework for fast and optimal decision support in emergency control is reported in this paper. The proposed fast and optimal decision system covers four stages. In this study, the analytical hierarchy process integrated with grey fixed weight clustering was used to determine the gate closing mode. The emergency control strategy in ice cover formation period is presented. A case study was examined in the demonstrative project conducted in the Middle Route of the South-to-North Water Diversion Project in China. The relative errors of the arrival time of the peak concentration and the peak concentration in monitoring points between the actual monitoring values and the formula calculation values are less than 18%.