Jiakang Wang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Jiakang Wang has a total of 26 co-authors. Here are the top co-authors by number of shared publications:
- Guojing Zhu
China University of Petroleum-Beijing, Beijing 102249, China
4 shared publications Jin Yang
3 shared publicationsQishuai Yin
3 shared publications- Segen Farid Estefen
Ocean Engineering Department - Offshore Renewable Energy Group - GERO/COPPE, Federal University of Rio de Janeiro, Rio de Janeiro, Brazil
2 shared publications - Bin Chen
College of Mechanical and Transportation Engineering, China University of Petroleum—Beijing, Beijing 102249, China
1 shared publication - Bingzhen Gao1 shared publication
Latest Publications
- Open Access
A Comprehensive Evaluation Model for Mobile Offshore Drilling Units Based on Lagrange-Optimized Combination Weights
Due to the diverse functions of supporting equipment and numerous operational parameters, offshore mobile drilling units are difficult to evaluate through a systematic and comprehensive quantitative approach. Based on an analysis of the hierarchical structure of key equipment functions, this study proposes a comprehensive quantitative evaluation model for operational capability of offshore mobile drilling units by integrating the Analytic Hierarchy Process (AHP) and the improved CRITIC method. To minimize the deviation between subjective and objective weights, the Lagrange multiplier method is employed for optimal weight combination. Taking mobile drilling platforms currently in service in the South China Sea as the research object, the evaluation criteria are identified to include four main aspects: rated platform capacity, actual operational performance, equipment failure rate, and economic efficiency. The case study results indicate that the evaluation method effectively synthesizes the distinct characteristics of both subjective and objective evaluations, thereby enhancing the scientific rigor and robustness of the decision-making process. The robustness of the proposed model was validated through comparative analysis. Furthermore, dynamic optimal selection charts under varying water and well depths are generated. These visual tools enable operators to identify the most suitable platform for specific operational scenarios, providing a scientific basis for engineering decision-making.
Open AccessA Comprehensive Evaluation Model for Mobile Offshore Drilling Units Based on Lagrange-Optimized Combination Weights
Due to the diverse functions of supporting equipment and numerous operational parameters, offshore mobile drilling units are difficult to evaluate through a systematic and comprehensive quantitative approach. Based on an analysis of the hierarchical structure of key equipment functions, this study proposes a comprehensive quantitative evaluation model for operational capability of offshore mobile drilling units by integrating the Analytic Hierarchy Process (AHP) and the improved CRITIC method. To minimize the deviation between subjective and objective weights, the Lagrange multiplier method is employed for optimal weight combination. Taking mobile drilling platforms currently in service in the South China Sea as the research object, the evaluation criteria are identified to include four main aspects: rated platform capacity, actual operational performance, equipment failure rate, and economic efficiency. The case study results indicate that the evaluation method effectively synthesizes the distinct characteristics of both subjective and objective evaluations, thereby enhancing the scientific rigor and robustness of the decision-making process. The robustness of the proposed model was validated through comparative analysis. Furthermore, dynamic optimal selection charts under varying water and well depths are generated. These visual tools enable operators to identify the most suitable platform for specific operational scenarios, providing a scientific basis for engineering decision-making.
- Open Access
- 25 May 2026
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 14 (11) , 975
Experimental Study on Penetration Simulation of the Wellhead Suction Pile in Deep-Sea Resource Drilling
The suction pile well construction technique is increasingly adopted in deepwater drilling projects. The soil–structure interaction mechanism during the penetration and installation of the wellhead suction pile in clay is complex. Given the critical demand for precise installation outcomes in engineering practice, the influence of penetration velocity on installation performance requires significant consideration. Through scale-model experimental methods, various penetration velocities were configured primarily by adjusting suction pump flow rates. The influences of these velocities on penetration resistance, penetration depth, and related metrics were systematically assessed. A case study was conducted based on the engineering parameters of a wellsite in the South China Sea. A theoretical algorithm for WSP penetration resistance was developed and subsequently refined through experimental data. Coefficient optimization was established via theoretical assessment of strain-rate dependency and experimental data calibration. The optimized algorithm demonstrated strong agreement with field measurements, achieving a coefficient of determination () exceeding 0.9. Compared to conventional theoretical approaches, it incorporated explicit consideration of penetration velocity. The analysis indicates that in soft clay, the penetration resistance of wellhead suction piles exhibits significant sensitivity to penetration rate, increasing with higher velocities. The influence of penetration rate on penetration depth is relatively weak. This computational approach offers design guidance for installation procedures and enables the implementation of the suction pile well construction mode in the South China Sea.- 25 May 2026
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 14 (11) , 975
Open AccessExperimental Study on Penetration Simulation of the Wellhead Suction Pile in Deep-Sea Resource Drilling
The suction pile well construction technique is increasingly adopted in deepwater drilling projects. The soil–structure interaction mechanism during the penetration and installation of the wellhead suction pile in clay is complex. Given the critical demand for precise installation outcomes in engineering practice, the influence of penetration velocity on installation performance requires significant consideration. Through scale-model experimental methods, various penetration velocities were configured primarily by adjusting suction pump flow rates. The influences of these velocities on penetration resistance, penetration depth, and related metrics were systematically assessed. A case study was conducted based on the engineering parameters of a wellsite in the South China Sea. A theoretical algorithm for WSP penetration resistance was developed and subsequently refined through experimental data. Coefficient optimization was established via theoretical assessment of strain-rate dependency and experimental data calibration. The optimized algorithm demonstrated strong agreement with field measurements, achieving a coefficient of determination () exceeding 0.9. Compared to conventional theoretical approaches, it incorporated explicit consideration of penetration velocity. The analysis indicates that in soft clay, the penetration resistance of wellhead suction piles exhibits significant sensitivity to penetration rate, increasing with higher velocities. The influence of penetration rate on penetration depth is relatively weak. This computational approach offers design guidance for installation procedures and enables the implementation of the suction pile well construction mode in the South China Sea. - 21 March 2025
- Published by Elsevier in Ocean Engineering
- Vol. 327
Characterization and predictive modeling of directional piling lateral offsets for offshore conductors
- 21 March 2025
- Published by Elsevier in Ocean Engineering
- Vol. 327
Characterization and predictive modeling of directional piling lateral offsets for offshore conductors