YWYucheng Wang

Yucheng Wang

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Yucheng Wang has a total of 12 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Mechanism of Structural Plane Dip Angle on Rockburst in a Deeply Buried Hard Rock Tunnel

    by Yucheng Wang, Chun’An Tang, Liexian Tang, Tianhui Ma

    During the excavation of the Qinling Water Conveyance Tunnel, rockbursts influenced by structural planes with varying dip angles occurred frequently, posing a significant threat to personnel and construction safety. This study combines statistical analysis of rockburst cases, numerical simulation, and microseismic monitoring to systematically reveal the influence mechanism of structural plane dip angle on rockbursts. Statistical results indicate that intense rockbursts occurring in the dip angle interval of 0–30° account for 60%. Numerical simulations further demonstrate that dip angles of less than 90° (especially near 10°) induce continuous stress accumulation, leading to large-scale instability. Specifically, the peak acoustic emission (AE) count at a dip angle of 10° is significantly higher than in other configurations, further indicating the highest rockburst risk. Incorporating the influence mechanism of structural plane dip angle into microseismic monitoring analysis significantly improved prediction accuracy. This approach successfully predicted an intense rockburst. Based on these findings, engineering suggestions regarding excavation direction and rockburst early warning optimization are proposed, offering a valuable reference for rockburst mitigation in deep-buried tunnels under similar geological conditions.

  • Open Access

    The Effects of Secondary Pre-Tightening of the Clamping Cable Nodes on Yielding U-Shaped Steel Supports for Use in Deep Soft Rock Roadways

    by Yubing Huang, Hongdi Tian, Xuepeng Wang, Yucheng Wang, Huayu Yang

    Secondary pre-tightening of clamping cable joints can effectively improve the load-bearing performance of U-shaped steel supports. However, the underlying mechanism of secondary pre-tightening has remained a critical knowledge gap in ground control engineering, and its design still relies on empirical approaches without theoretical guidance. To address these challenges, this study proposes a novel mechanistic framework integrating mathematical modelling, experimental validation, and parametric analysis. Specifically, a first-principle-based mathematical expression for the slip resistance of clamping cable joints under secondary pre-tightening was derived, explicitly incorporating the effects of bolt torque and interfacial friction; and a dual-phase experimental protocol combining axial compression tests and numerical simulations was developed to systematically quantify the impacts of initial pre-tightening torque, secondary pre-tightening torque (T2), and the timing of secondary pre-tightening (u/umax). Three groundbreaking thresholds were identified, as follows: critical initial pre-tightening torque (T1 > 250 N·m) beyond which secondary pre-tightening becomes ineffective ( 1) for significant load-bearing enhancement; and the optimal activation window (u/umax < 50%) balancing capacity gain (<10%) and deformation control. These findings establish the first quantitative design criteria for secondary pre-tightening applications, transitioning from empirical practice to mechanics-driven optimization.


  • Open Access

    Review on Early Warning Methods for Rockbursts in Tunnel Engineering Based on Microseismic Monitoring

    by Shichao Zhang, Chunan Tang, Yucheng Wang, Jiaming Li, Tianhui Ma, Kaikai Wang

    Due to the different geological conditions and construction methods associated with different projects, rockbursts in deep-buried tunnels often present different precursor characteristics, bringing major challenges to the early warning of rockbursts. To adapt to the complexity of engineering, it is necessary to review the latest advancements in rockburst early warning and to discuss general early warning methods. In this article, first, microseismic monitoring and localization methods applicable under tunneling construction are reviewed. Based on the latest engineering examples and research progress, the microseismic evolution characteristics of the rockburst formation process are summarized, and the formation process and mechanism of structure-type and delayed rockbursts are analyzed. The different methods for predicting the risk and level of rockbursts using microseismic indices are reviewed, and the implementation methods and application cases for predicting potential rockburst areas and rockburst probability based on a mechanical model are expounded. Finally, combined with the new practice in early warning methods, development directions for the early warning of rockbursts are put forward.