Francesco Banda
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Francesco Banda has a total of 16 co-authors. Here are the top co-authors by number of shared publications:
- Stefano Tebaldini
Department of Electronics, Information, and Bioengineering (DEIB), Politecnico di Milano, Milan, Italy
4 shared publications - Andrea Monti Guarnieri
Politecnico di Milano
1 shared publication - Francesco Salvaterra
Department of Electronics, Information, and Bioengineering (DEIB), Politecnico di Milano, Milan, Italy
1 shared publication - Johannes Reiche
Laboratory of Geo-Information Science and Remote Sensing, Wageningen University & Research, Droevendaalsesteeg 3, 6708 PB Wageningen, The Netherlands
1 shared publication - Krzysztof Stereńczak
Department of Geomatics, Forest Research Institute, Raszyn, Poland
1 shared publication - Laurent Ferro-Famil
ISAE-Supaero, CESBIO, University of Toulouse, Toulouse, France
1 shared publication
Latest Publications
- 22 September 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Geoscience and Remote Sensing
- Vol. 63 (01962892) , 1-14
Phase Calibration of Repeat-Pass Monostatic and Bistatic Airborne SAR Tomographic Data: A Case Study From the TomoSense Campaign
The European Space Agency (ESA) TomoSense campaign was designed to advance forest parameter retrieval in preparation for future spaceborne Synthetic Aperture Radar (SAR) missions. The campaign was flown in 2020-2021 at the Kermeter area in the Eifel Park, Germany, to acquire mono- and bi-static SAR data over a temperate forest in hilly topographic conditions. The data-set includes multi-baseline, full-polarimetric L-band airborne SAR data acquired in a bistatic configuration by flying two aricraft in close formation, to enable tomographic imaging of the vegetation. As largely discussed in the literature, achieving high quality tomographic imaging requires accurate compensation of any phase terms not directly associated with the scene geometry, which includes platform position errors in navigational data and, in the case of bistatic acquisitions, clock synchronization errors. Building on the distinct features of navigation and clock synchronization errors, this paper proposes a four-step calibration approach that progressively refines the data to achieve accurate tomographic imaging. In the first step, clock mismatches are retrieved and corrected based on a direct analysis of mono- and bi-static data acquired in the same flight. In the second step, single-pass time-varying baseline errors between platforms are iteratively inverted and corrected. The third step jointly analyses the data from all flights to fully restore the interferometric coherence in all interferograms. The last step produces the final trajectory correction by a bistatic implementation of the Phase Center Double Localization (PCDL) algorithm. Experimental results demonstrate that the proposed approach produces high quality tomographic imaging for both the mono- and the bi-static data-sets. Finally, we demonstrate the possibility of tomographic imaging by coherently combining the two data-sets.
- 22 September 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Geoscience and Remote Sensing
- Vol. 63 (01962892) , 1-14
Phase Calibration of Repeat-Pass Monostatic and Bistatic Airborne SAR Tomographic Data: A Case Study From the TomoSense Campaign
The European Space Agency (ESA) TomoSense campaign was designed to advance forest parameter retrieval in preparation for future spaceborne Synthetic Aperture Radar (SAR) missions. The campaign was flown in 2020-2021 at the Kermeter area in the Eifel Park, Germany, to acquire mono- and bi-static SAR data over a temperate forest in hilly topographic conditions. The data-set includes multi-baseline, full-polarimetric L-band airborne SAR data acquired in a bistatic configuration by flying two aricraft in close formation, to enable tomographic imaging of the vegetation. As largely discussed in the literature, achieving high quality tomographic imaging requires accurate compensation of any phase terms not directly associated with the scene geometry, which includes platform position errors in navigational data and, in the case of bistatic acquisitions, clock synchronization errors. Building on the distinct features of navigation and clock synchronization errors, this paper proposes a four-step calibration approach that progressively refines the data to achieve accurate tomographic imaging. In the first step, clock mismatches are retrieved and corrected based on a direct analysis of mono- and bi-static data acquired in the same flight. In the second step, single-pass time-varying baseline errors between platforms are iteratively inverted and corrected. The third step jointly analyses the data from all flights to fully restore the interferometric coherence in all interferograms. The last step produces the final trajectory correction by a bistatic implementation of the Phase Center Double Localization (PCDL) algorithm. Experimental results demonstrate that the proposed approach produces high quality tomographic imaging for both the mono- and the bi-static data-sets. Finally, we demonstrate the possibility of tomographic imaging by coherently combining the two data-sets.
- Open Access
- 20 June 2025
- Published by Elsevier in Science of Remote Sensing
- Vol. 12
Sub-hectare resolution forest biomass mapping from Copernicus DEM with low-dimensional models
- 20 June 2025
- Published by Elsevier in Science of Remote Sensing
- Vol. 12
Open AccessSub-hectare resolution forest biomass mapping from Copernicus DEM with low-dimensional models
- 7 April 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Geoscience and Remote Sensing
- Vol. 63 (01962892) , 1-11
Demonstration of Spaceborne L-Band Forest SAR Tomography With SAOCOM
In this paper we present a first demonstration of spaceborne L-band SAR Tomography over a forested scenario. To this aim, we process a SAOCOM stack of nine acquisitions with across-track baselines theoretically achieving a vertical resolution around 22 m. To obtain a correct TomoSAR imaging, we phase calibrate the stack by properly accounting for forest volumetric structure, which drives the choice of calibrating with smaller baselines. Finally, we ground steer calibrated TomoSAR to achieve a consistent reconstruction of forest structure above ground and derive a forest height map. Comparison with reference canopy height gives a very good overall agreement, proving the effectiveness of our approach and making the experiment an interesting test-bed in view of future long-wavelength SAR missions.
- 7 April 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Geoscience and Remote Sensing
- Vol. 63 (01962892) , 1-11
Demonstration of Spaceborne L-Band Forest SAR Tomography With SAOCOM
In this paper we present a first demonstration of spaceborne L-band SAR Tomography over a forested scenario. To this aim, we process a SAOCOM stack of nine acquisitions with across-track baselines theoretically achieving a vertical resolution around 22 m. To obtain a correct TomoSAR imaging, we phase calibrate the stack by properly accounting for forest volumetric structure, which drives the choice of calibrating with smaller baselines. Finally, we ground steer calibrated TomoSAR to achieve a consistent reconstruction of forest structure above ground and derive a forest height map. Comparison with reference canopy height gives a very good overall agreement, proving the effectiveness of our approach and making the experiment an interesting test-bed in view of future long-wavelength SAR missions.