Dongseong Lee
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Dongseong Lee has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Changhyup Park
Department of Integrative Engineering for Hydrogen Safety, Kangwon National University, Chuncheon, Republic of Korea
3 shared publications Changhyup Park
1 shared publicationIlsik Jang
1 shared publication- Kyungbook Lee
Department of Geoenvironmental Sciences, Kongju National University, Gongju-si, Republic of Korea
1 shared publication - Seil Ki
E&P Technical Center, Korean National Oil Corporation, Ulsan 44538, Korea
1 shared publication - Taewoong Ahn
Petroleum and Marine Research Division, Korea Institute of Geosciences and Minerals, Daejeon 34132, Korea
1 shared publication
Latest Publications
- Open Access
- 31 October 2026
- Published by The Korean Society of Mineral and Energy Resources Engineers in Journal of the Korean Society of Mineral and Energy Resources Engineers
- Vol. 63 (5) , 885-897
Investment Analysis for a Solar Power Project in South Korea using a Real-Options Model: A Case Study under Uncertainty
- 31 October 2026
- Published by The Korean Society of Mineral and Energy Resources Engineers in Journal of the Korean Society of Mineral and Energy Resources Engineers
- Vol. 63 (5) , 885-897
Open AccessInvestment Analysis for a Solar Power Project in South Korea using a Real-Options Model: A Case Study under Uncertainty
- Open Access
- 14 March 2026
- Published by Copernicus GmbH
Investment Analysis under Uncertainty: Real Options Valuation of Solar Photovoltaic Projects in South Korea
This paper presents an investment analysis of a land-based solar photovoltaic power generation project in a coastal region of South Korea by using real options theory (ROT) to address the limitations of traditional discounted cash flow (DCF) analysis under market uncertainty. Because volatility in the system marginal price (SMP) and renewable energy certificate (REC) prices can significantly affect the profitability of renewable energy investments, incorporating managerial flexibility through ROT is essential for reliable economic assessments. We estimate the critical investment price (CIP) using both a traditional DCF approach and a real options model, and further examine how a government’s long-term fixed price contract influences investment outcomes. The CIP by ROT is derived within a Hamilton-Jacobi-Bellman (HJB) framework. Results indicate that the CIP obtained from ROT is generally higher than that from DCF, reflecting option value from managerial flexibility; moreover, this difference increases as price volatility increases. We also find that long-term fixed-price contracts can reduce revenue uncertainty, thereby lowering required rate of return, the investor’s equity share, and the CIP, ultimately improving project attractiveness to investors. Under the long-term fixed-price contract, the project achieves an internal rate of return (IRR) of 5.75%, exceeding the weighted average cost of capital (WACC) of 3.58%, suggesting that the project is economically feasible.
- 14 March 2026
- Published by Copernicus GmbH
Open AccessInvestment Analysis under Uncertainty: Real Options Valuation of Solar Photovoltaic Projects in South Korea
This paper presents an investment analysis of a land-based solar photovoltaic power generation project in a coastal region of South Korea by using real options theory (ROT) to address the limitations of traditional discounted cash flow (DCF) analysis under market uncertainty. Because volatility in the system marginal price (SMP) and renewable energy certificate (REC) prices can significantly affect the profitability of renewable energy investments, incorporating managerial flexibility through ROT is essential for reliable economic assessments. We estimate the critical investment price (CIP) using both a traditional DCF approach and a real options model, and further examine how a government’s long-term fixed price contract influences investment outcomes. The CIP by ROT is derived within a Hamilton-Jacobi-Bellman (HJB) framework. Results indicate that the CIP obtained from ROT is generally higher than that from DCF, reflecting option value from managerial flexibility; moreover, this difference increases as price volatility increases. We also find that long-term fixed-price contracts can reduce revenue uncertainty, thereby lowering required rate of return, the investor’s equity share, and the CIP, ultimately improving project attractiveness to investors. Under the long-term fixed-price contract, the project achieves an internal rate of return (IRR) of 5.75%, exceeding the weighted average cost of capital (WACC) of 3.58%, suggesting that the project is economically feasible.
- Open Access
- 18 March 2025
- Published by Copernicus GmbH
An economic feasibility study including subsidies for an offshore wind-power project
An economic feasibility analysis considering the effects of subsidies was performed for an offshore wind-power project under construction in Korea. The assessment of this project utilized traditional economic indicators such as Net Present Value (NPV) and Internal Rate of Return (IRR), and the result showed a positive NPV and an IRR of 6.7% that exceeded the Weighted Average Cost of Capital (WACC) of 4.8%, suggesting that the offshore wind-power project exhibited economically feasible. However, this feasibility was contingent upon governmental institutional supports, i.e., subsidies and policies, – specifically, Renewable Energy Certificates (RECs), REC multiplier, and long-term fixed price contracts that might generate stable cash flows. As a result of sensitive analysis, it indicated that the project at the viewpoint of stock holders would struggle to maintain economic feasibility if the current levels of subsidies were reduced by more than 10%. A comparison of the Levelized Cost of Electricity (LCOE) was calculated excluding the effects of subsidies to further evaluate the competitiveness of this project relative to power generation facilities utilizing other energy sources. The results showed that the LCOE of this project was 129.4 USD/MWh, nearly twice that of offshore wind-power project in the United States (64.6 USD/MWh). This disparity was attributed to relatively low wind resource availability, stemming from its geographical location, as well as the higher associated costs of labor and financing. The results suggested that the energy transition should be carried out gradually with an appropriate mix of traditional and renewable energy sources to mitigate the societal and economic burdens.
- 18 March 2025
- Published by Copernicus GmbH
Open AccessAn economic feasibility study including subsidies for an offshore wind-power project
An economic feasibility analysis considering the effects of subsidies was performed for an offshore wind-power project under construction in Korea. The assessment of this project utilized traditional economic indicators such as Net Present Value (NPV) and Internal Rate of Return (IRR), and the result showed a positive NPV and an IRR of 6.7% that exceeded the Weighted Average Cost of Capital (WACC) of 4.8%, suggesting that the offshore wind-power project exhibited economically feasible. However, this feasibility was contingent upon governmental institutional supports, i.e., subsidies and policies, – specifically, Renewable Energy Certificates (RECs), REC multiplier, and long-term fixed price contracts that might generate stable cash flows. As a result of sensitive analysis, it indicated that the project at the viewpoint of stock holders would struggle to maintain economic feasibility if the current levels of subsidies were reduced by more than 10%. A comparison of the Levelized Cost of Electricity (LCOE) was calculated excluding the effects of subsidies to further evaluate the competitiveness of this project relative to power generation facilities utilizing other energy sources. The results showed that the LCOE of this project was 129.4 USD/MWh, nearly twice that of offshore wind-power project in the United States (64.6 USD/MWh). This disparity was attributed to relatively low wind resource availability, stemming from its geographical location, as well as the higher associated costs of labor and financing. The results suggested that the energy transition should be carried out gradually with an appropriate mix of traditional and renewable energy sources to mitigate the societal and economic burdens.
- Open Access
- 28 February 2025
- Published by The Korean Society of Mineral and Energy Resources Engineers in Journal of the Korean Society of Mineral and Energy Resources Engineers
- Vol. 62 (1) , 1-11
A Case Study on the Economic Feasibility for Offshore Wind Power in South Korea from the Perspective of Project Participants
This paper presents an economic feasibility analysis of an offshore wind power project in South Korea, focusing on the perspectives of project participants, that is, wind power companies (firms), equity holders, and debt holders. The economic evaluation, based on the net present value, internal rate of return, and debt service coverage ratio, indicates that this project is economically feasible for all participants. However, this result is limited to the presence of government subsidies and policies, e.g., renewable energy certificates (RECs), REC multipliers, and long-term fixed price contracts. Notably, the levelized cost of electricity for this project is higher than that of other typical energy resources. The transition to renewable energy in Korea should be carried out gradually to maintain an energy mix that appropriately utilizes traditional and renewable energy, while reducing the burden on society and the economy as a whole.
- 28 February 2025
- Published by The Korean Society of Mineral and Energy Resources Engineers in Journal of the Korean Society of Mineral and Energy Resources Engineers
- Vol. 62 (1) , 1-11
Open AccessA Case Study on the Economic Feasibility for Offshore Wind Power in South Korea from the Perspective of Project Participants
This paper presents an economic feasibility analysis of an offshore wind power project in South Korea, focusing on the perspectives of project participants, that is, wind power companies (firms), equity holders, and debt holders. The economic evaluation, based on the net present value, internal rate of return, and debt service coverage ratio, indicates that this project is economically feasible for all participants. However, this result is limited to the presence of government subsidies and policies, e.g., renewable energy certificates (RECs), REC multipliers, and long-term fixed price contracts. Notably, the levelized cost of electricity for this project is higher than that of other typical energy resources. The transition to renewable energy in Korea should be carried out gradually to maintain an energy mix that appropriately utilizes traditional and renewable energy, while reducing the burden on society and the economy as a whole.