Yan-Li Dong
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Yan-Li Dong has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
Hao-Dong Zhang
Department of Civil engineering, North University of China, Taiyuan, China
2 shared publicationsHao-Ran Feng
Department of Civil engineering, North University of China, Taiyuan, China
2 shared publicationsJun Zhang
Key Laboratory of Highway Construction and Maintenance Technology in Loess Region, Ministry of Transport, Shanxi Transportation Research Institute, Taiyuan, China
2 shared publicationsZhi-Yi Zhao
Department of Civil engineering, North University of China, Taiyuan, China
2 shared publications- Chuanxin Du
School of Environment and Safety Engineering, North University of China, Taiyuan, 030051, Shanxi, China.
1 shared publication - Qinqin Guo
School of Environment and Safety Engineering, North University of China, Taiyuan 030051, China
1 shared publication
Latest Publications
- 21 April 2026
- Published by Springer Nature in International Journal of Civil Engineering
- Vol. 24 (10) , 1-10
Deformation Characteristics of Saturated Sand Under One-Way and Two-Way Cyclic Spherical Stress
- 21 April 2026
- Published by Springer Nature in International Journal of Civil Engineering
- Vol. 24 (10) , 1-10
Deformation Characteristics of Saturated Sand Under One-Way and Two-Way Cyclic Spherical Stress
- Open Access
- 25 April 2025
- Published by Springer Nature in Scientific Reports
- Vol. 15 (1) , 1-16
Deformation and force analysis of reinforced soil Bridge abutment under dynamic vehicle loading
The Geosynthetic Reinforced Soil-Integrated Bridge System (i.e. GRS-IBS) was developed to address the bumping issue from differential settlement at bridge abutments. This study focused on a Louisiana bridge abutment, using numerical simulation with the finite difference method to assess deformation and stress under dynamic loads. Results showed that deformation of the soil abutment and geogrid increased with the vehicle weight, with a more pronounced effect on lateral displacement than settlement. Settlement values initially decreased then rose with speeds between 30 and 60 km/h, mirroring the trend in lateral displacement and geogrid deformation. The lateral displacement of the geogrid was roughly half that of the panel. Shear stress on the abutment at 5 tons was double that at 1.75 tons, and geogrid stress was triple. Analysis indicated that a vehicle speed of around 45 km/h had the least impact on the reinforced soil abutment. The findings offer valuable insights for the use and maintenance of reinforced earth bridge abutments.
- 25 April 2025
- Published by Springer Nature in Scientific Reports
- Vol. 15 (1) , 1-16
Open AccessDeformation and force analysis of reinforced soil Bridge abutment under dynamic vehicle loading
The Geosynthetic Reinforced Soil-Integrated Bridge System (i.e. GRS-IBS) was developed to address the bumping issue from differential settlement at bridge abutments. This study focused on a Louisiana bridge abutment, using numerical simulation with the finite difference method to assess deformation and stress under dynamic loads. Results showed that deformation of the soil abutment and geogrid increased with the vehicle weight, with a more pronounced effect on lateral displacement than settlement. Settlement values initially decreased then rose with speeds between 30 and 60 km/h, mirroring the trend in lateral displacement and geogrid deformation. The lateral displacement of the geogrid was roughly half that of the panel. Shear stress on the abutment at 5 tons was double that at 1.75 tons, and geogrid stress was triple. Analysis indicated that a vehicle speed of around 45 km/h had the least impact on the reinforced soil abutment. The findings offer valuable insights for the use and maintenance of reinforced earth bridge abutments.
- Open Access
- 9 April 2025
- Published by Springer Nature in Research Square
Deformation and force analysis of reinforced soil bridge abutment under dynamic vehicle loading
The Geosynthetic Reinforced Soil-Integrated Bridge System (i.e. GRS-IBS) was developed to address the bumping issue from differential settlement at bridge abutments. This study focused on a Louisiana bridge abutment, using numerical simulation with the finite difference method to assess deformation and stress under dynamic loads. Results showed that deformation of the soil abutment and geogrid increased with the vehicle weight, with a more pronounced effect on lateral displacement than settlement. Settlement values initially decreased then rose with speeds between 30–60 km/h, mirroring the trend in lateral displacement and geogrid deformation. The lateral displacement of the geogrid was roughly half that of the panel. Shear stress on the abutment at 5 tons was double that at 1.75 tons, and geogrid stress was triple. Analysis indicated that a vehicle speed of around 45 km/h had the least impact on the reinforced soil abutment. The findings offer valuable insights for the use and maintenance of reinforced earth bridge abutments.
- 9 April 2025
- Published by Springer Nature in Research Square
Open AccessDeformation and force analysis of reinforced soil bridge abutment under dynamic vehicle loading
The Geosynthetic Reinforced Soil-Integrated Bridge System (i.e. GRS-IBS) was developed to address the bumping issue from differential settlement at bridge abutments. This study focused on a Louisiana bridge abutment, using numerical simulation with the finite difference method to assess deformation and stress under dynamic loads. Results showed that deformation of the soil abutment and geogrid increased with the vehicle weight, with a more pronounced effect on lateral displacement than settlement. Settlement values initially decreased then rose with speeds between 30–60 km/h, mirroring the trend in lateral displacement and geogrid deformation. The lateral displacement of the geogrid was roughly half that of the panel. Shear stress on the abutment at 5 tons was double that at 1.75 tons, and geogrid stress was triple. Analysis indicated that a vehicle speed of around 45 km/h had the least impact on the reinforced soil abutment. The findings offer valuable insights for the use and maintenance of reinforced earth bridge abutments.