Muhamad Abdul Jumali
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Muhamad Abdul Jumali has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
Rusdiyantoro
Universitas PGRI Adi Buana Surabaya
2 shared publications- Alfi Rohmatil Maulidah
Universitas PGRI Adi Buana Surabaya
1 shared publication - Anita Kristina
Faculty of Economics and Business, Universitas Trunojoyo Madura, 69162 Bangkalan, East Java, Indonesia
1 shared publication - Antonius Cahyono
Universitas PGRI Adi Buana Surabaya
1 shared publication - Bily Prasisko
Universitas PGRI Adibuana, Surabaya
1 shared publication Diego Dzikrul Sabbiqun
Universitas PGRI Adi Buana Surabaya
1 shared publication
Latest Publications
- Open Access
- 1 December 2025
- Published by Ilmu Bersama Center in Factory Jurnal Industri, Manajemen dan Rekayasa Sistem Industri
- Vol. 4 (2) , 246-257
Indentifikasi Jalur Kritis pada Proses Pemindahan Sarana Produksi Krimer Retail dengan Metode CPM pada PT X
Industri manufaktur global menghadapi tantangan kompleks dalam mengelola proyek pemindahan fasilitas produksi, dimana keterlambatan dapat mengakibatkan kerugian finansial signifikan dan gangguan operasional berkepanjangan, khususnya dalam industri makanan dan minuman yang memiliki kompleksitas peralatan tinggi dan standar keamanan pangan ketat. Penelitian ini bertujuan mengidentifikasi aktivitas jalur kritis, menentukan durasi optimal penyelesaian proyek, dan menganalisis aktivitas dengan float time dalam pemindahan sarana produksi krimer retail di PT X menggunakan metode Critical Path Method (CPM). Penelitian menggunakan pendekatan kuantitatif deskriptif dengan studi kasus tunggal, pengumpulan data melalui observasi lapangan, wawancara terstruktur dengan 8 responden (manajer proyek, technical engineer, maintenance staff, logistics coordinator, quality assurance, external mover, dan safety officer), serta dokumentasi perusahaan mencakup work breakdown structure dan laporan progres. Analisis data dilakukan melalui tahapan identifikasi 12 aktivitas proyek, penentuan dependensi, estimasi durasi, pembuatan diagram jaringan activity-on-node, perhitungan forward pass dan backward pass, serta identifikasi jalur kritis dan float time. Hasil penelitian menunjukkan bahwa proyek pemindahan sarana produksi krimer retail di PT X dijadwalkan selesai dalam waktu optimal selama 36 hari kerja berdasarkan perhitungan CPM denga mengidentifikasi sembilan aktivitas kritis (A→B→C→E→F→H→J→K→L) yang merepresentasikan 83,3% dari keseluruhan aktivitas dengan durasi optimal 36 hari kerja atau 7,2 minggu. Aktivitas dengan durasi terpanjang meliputi persiapan pondasi dan utilitas (7 hari), pembongkaran mesin line 1 (6 hari), dan instalasi mesin (6 hari). Dua aktivitas non-kritis teridentifikasi memiliki float time yaitu pembongkaran mesin line 2 (1 hari) dan koneksi listrik dan pendingin (6 hari), memberikan fleksibilitas strategis dalam alokasi sumber daya. Penelitian merekomendasikan penerapan monitoring intensif pada aktivitas kritis, implementasi teknik fast-tracking, dan pemanfaatan float time sebagai buffer temporal untuk mengantisipasi kendala teknis guna meminimalkan risiko keterlambatan dan memastikan kelancaran transisi operasional.
- 1 December 2025
- Published by Ilmu Bersama Center in Factory Jurnal Industri, Manajemen dan Rekayasa Sistem Industri
- Vol. 4 (2) , 246-257
Open AccessIndentifikasi Jalur Kritis pada Proses Pemindahan Sarana Produksi Krimer Retail dengan Metode CPM pada PT X
Industri manufaktur global menghadapi tantangan kompleks dalam mengelola proyek pemindahan fasilitas produksi, dimana keterlambatan dapat mengakibatkan kerugian finansial signifikan dan gangguan operasional berkepanjangan, khususnya dalam industri makanan dan minuman yang memiliki kompleksitas peralatan tinggi dan standar keamanan pangan ketat. Penelitian ini bertujuan mengidentifikasi aktivitas jalur kritis, menentukan durasi optimal penyelesaian proyek, dan menganalisis aktivitas dengan float time dalam pemindahan sarana produksi krimer retail di PT X menggunakan metode Critical Path Method (CPM). Penelitian menggunakan pendekatan kuantitatif deskriptif dengan studi kasus tunggal, pengumpulan data melalui observasi lapangan, wawancara terstruktur dengan 8 responden (manajer proyek, technical engineer, maintenance staff, logistics coordinator, quality assurance, external mover, dan safety officer), serta dokumentasi perusahaan mencakup work breakdown structure dan laporan progres. Analisis data dilakukan melalui tahapan identifikasi 12 aktivitas proyek, penentuan dependensi, estimasi durasi, pembuatan diagram jaringan activity-on-node, perhitungan forward pass dan backward pass, serta identifikasi jalur kritis dan float time. Hasil penelitian menunjukkan bahwa proyek pemindahan sarana produksi krimer retail di PT X dijadwalkan selesai dalam waktu optimal selama 36 hari kerja berdasarkan perhitungan CPM denga mengidentifikasi sembilan aktivitas kritis (A→B→C→E→F→H→J→K→L) yang merepresentasikan 83,3% dari keseluruhan aktivitas dengan durasi optimal 36 hari kerja atau 7,2 minggu. Aktivitas dengan durasi terpanjang meliputi persiapan pondasi dan utilitas (7 hari), pembongkaran mesin line 1 (6 hari), dan instalasi mesin (6 hari). Dua aktivitas non-kritis teridentifikasi memiliki float time yaitu pembongkaran mesin line 2 (1 hari) dan koneksi listrik dan pendingin (6 hari), memberikan fleksibilitas strategis dalam alokasi sumber daya. Penelitian merekomendasikan penerapan monitoring intensif pada aktivitas kritis, implementasi teknik fast-tracking, dan pemanfaatan float time sebagai buffer temporal untuk mengantisipasi kendala teknis guna meminimalkan risiko keterlambatan dan memastikan kelancaran transisi operasional.
- Open Access
- 30 October 2025
- Published by Nak-Kanak: Journal of Child Research in Jurnal Teknik Elektro dan Komputer TRIAC
- Vol. 12 (2) , 56-60
ISSN 2615-5788 Print (2615-7764) Vol 12 No. 2 @ 2025 Wildan Surya Wijaya, Muhammad Risfan Ramadhani. Jurnal Teknik Elektro dan Komputer TRIAC 2025 Yunia Dwie Nurcahyanie, Muhamad Abdul Jumali https://journal.trunojoyo.ac.id/triac
The use of small-scale solar energy is one of the strategic solutions for electricity needs in remote areas and outdoor activities. As the need for portable electrification increases, the development of solar backpack systems is becoming a practical and sustainable alternative. This research aims to design and test a portable backpack system based on a thin film solar panel with a capacity of 20 Wp, equipped with a 12V solar charge controller and a 7.2 Ah battery. The system is designed with two outputs, namely 12V DC and 5V USB, to support lightweight devices such as LED lights and smartphones. The test was carried out at two different locations, namely Mount Lorokan and Mount Penanggungan, with data taken which included latitude, longitude, solar elevation angle, PV voltage, PV current, and output power. The measurement results show that there is a variation in the performance of solar panels according to geographical conditions and solar elevation angles. On Mount Lorokan, the peak power reaches 8.55 W at an angle of 75°, while on Mount Penanggungan the maximum power is slightly higher, which is 8.6 W at an angle of 78°. Mount Lorokan excels at maximum power, Penanggungan shows more stable performance at low to medium angles. This research contributes to the development of a portable electrification system based on renewable energy that supports power continuity in locations without access to electricity.
- 30 October 2025
- Published by Nak-Kanak: Journal of Child Research in Jurnal Teknik Elektro dan Komputer TRIAC
- Vol. 12 (2) , 56-60
Open AccessISSN 2615-5788 Print (2615-7764) Vol 12 No. 2 @ 2025 Wildan Surya Wijaya, Muhammad Risfan Ramadhani. Jurnal Teknik Elektro dan Komputer TRIAC 2025 Yunia Dwie Nurcahyanie, Muhamad Abdul Jumali https://journal.trunojoyo.ac.id/triac
The use of small-scale solar energy is one of the strategic solutions for electricity needs in remote areas and outdoor activities. As the need for portable electrification increases, the development of solar backpack systems is becoming a practical and sustainable alternative. This research aims to design and test a portable backpack system based on a thin film solar panel with a capacity of 20 Wp, equipped with a 12V solar charge controller and a 7.2 Ah battery. The system is designed with two outputs, namely 12V DC and 5V USB, to support lightweight devices such as LED lights and smartphones. The test was carried out at two different locations, namely Mount Lorokan and Mount Penanggungan, with data taken which included latitude, longitude, solar elevation angle, PV voltage, PV current, and output power. The measurement results show that there is a variation in the performance of solar panels according to geographical conditions and solar elevation angles. On Mount Lorokan, the peak power reaches 8.55 W at an angle of 75°, while on Mount Penanggungan the maximum power is slightly higher, which is 8.6 W at an angle of 78°. Mount Lorokan excels at maximum power, Penanggungan shows more stable performance at low to medium angles. This research contributes to the development of a portable electrification system based on renewable energy that supports power continuity in locations without access to electricity.
- Open Access
- 16 April 2025
- Published by Yayasan Pondok Pesantren Nurul Islam Pungging Mojokerto in Jurnal Pemberdayaan Masyarakat dan Komunitas
- Vol. 2 (2) , 183-191
Family Food Security through Urban Farming in Housing Complexes
This community service program aims to improve family food security in housing complexes through urban farming. The program involves training and mentoring for residents, specifically residents of RT 13 in the Bumi Candi Asri housing complex, Sidoarjo. Activities include utilizing limited land to grow vegetables and other productive plants. The objectives of this activity are to increase access to healthy and nutritious food, strengthen family food self-sufficiency, and raise awareness of the importance of a sustainable lifestyle. The expected outcome of this activity is to have a positive impact on food security, the economy, and the environment in the housing complex.
- 16 April 2025
- Published by Yayasan Pondok Pesantren Nurul Islam Pungging Mojokerto in Jurnal Pemberdayaan Masyarakat dan Komunitas
- Vol. 2 (2) , 183-191
Open AccessFamily Food Security through Urban Farming in Housing Complexes
This community service program aims to improve family food security in housing complexes through urban farming. The program involves training and mentoring for residents, specifically residents of RT 13 in the Bumi Candi Asri housing complex, Sidoarjo. Activities include utilizing limited land to grow vegetables and other productive plants. The objectives of this activity are to increase access to healthy and nutritious food, strengthen family food self-sufficiency, and raise awareness of the importance of a sustainable lifestyle. The expected outcome of this activity is to have a positive impact on food security, the economy, and the environment in the housing complex.
- Open Access
- 27 February 2025
- Published by LPPM ITN Malang in Industri Inovatif : Jurnal Teknik Industri
- Vol. 15 (1) , 201-205
ANALISIS BEBAN KERJA KARYAWAN DI DEPARTEMEN MAINTENANCE PADA PERUSAHAAN BUMBU DI GRESIK
Penelitian ini bertujuan untuk memuat beban kerja personel di Departemen Perawatan Pabrik Rempah di Gresik dengan menggunakan pendekatan Workload Analysis (WLA). Metode penelitian ini menggunakan pendekatan deskriptif kuantitatif, dengan menggunakan pendekatan pengumpulan data seperti observasi langsung, wawancara, dan pemeriksaan dokumen perawatan mesin sebelumnya. Hasil penelitian menunjukkan bahwa beban kerja keseluruhan selama dua bulan adalah 179 jam, sedangkan total jam kerja yang tersedia adalah 352 jam, menghasilkan tingkat utilisasi tenaga kerja sebesar 50,85%. Temuan ini menunjukkan bahwa terdapat kapasitas kerja yang tidak terpakai secara optimal, yang dapat dikorelasikan dengan efisiensi tenaga kerja dan alokasi tugas di departemen tersebut.
- 27 February 2025
- Published by LPPM ITN Malang in Industri Inovatif : Jurnal Teknik Industri
- Vol. 15 (1) , 201-205
Open AccessANALISIS BEBAN KERJA KARYAWAN DI DEPARTEMEN MAINTENANCE PADA PERUSAHAAN BUMBU DI GRESIK
Penelitian ini bertujuan untuk memuat beban kerja personel di Departemen Perawatan Pabrik Rempah di Gresik dengan menggunakan pendekatan Workload Analysis (WLA). Metode penelitian ini menggunakan pendekatan deskriptif kuantitatif, dengan menggunakan pendekatan pengumpulan data seperti observasi langsung, wawancara, dan pemeriksaan dokumen perawatan mesin sebelumnya. Hasil penelitian menunjukkan bahwa beban kerja keseluruhan selama dua bulan adalah 179 jam, sedangkan total jam kerja yang tersedia adalah 352 jam, menghasilkan tingkat utilisasi tenaga kerja sebesar 50,85%. Temuan ini menunjukkan bahwa terdapat kapasitas kerja yang tidak terpakai secara optimal, yang dapat dikorelasikan dengan efisiensi tenaga kerja dan alokasi tugas di departemen tersebut.
- Open Access
- 31 January 2024
- Published by Universitas PGRI Adi Buana Surabaya in Tibuana
- Vol. 7 (01) , 72-76
Solutions for Young Entrepreneurs in the Socially-Based Fourth Industrial Revolution Era
A startup is a venture or business within a social organization that leverages information technology to conduct its business, targeting a wide market audience and establishing numerous relationships to support its operations. A digital startup is a business within an organization that primarily operates its business through computers and is managed by various partners handling aspects of marketing, sales, and payments. Essentially, this digital startup serves as an intermediary for marketing or ongoing business activities. The strategy of a digital startup revolves around maximizing marketing efforts through technology, staying updated with current trends, and maintaining courteous and measured communication to provide comprehensive and inseparable customer service, using this approach to fulfill their needs. Social entrepreneurship during the era of the Fourth Industrial Revolution involves combining creativity with rapidly advancing technology for sociallybased entrepreneurial activities.
- 31 January 2024
- Published by Universitas PGRI Adi Buana Surabaya in Tibuana
- Vol. 7 (01) , 72-76
Open AccessSolutions for Young Entrepreneurs in the Socially-Based Fourth Industrial Revolution Era
A startup is a venture or business within a social organization that leverages information technology to conduct its business, targeting a wide market audience and establishing numerous relationships to support its operations. A digital startup is a business within an organization that primarily operates its business through computers and is managed by various partners handling aspects of marketing, sales, and payments. Essentially, this digital startup serves as an intermediary for marketing or ongoing business activities. The strategy of a digital startup revolves around maximizing marketing efforts through technology, staying updated with current trends, and maintaining courteous and measured communication to provide comprehensive and inseparable customer service, using this approach to fulfill their needs. Social entrepreneurship during the era of the Fourth Industrial Revolution involves combining creativity with rapidly advancing technology for sociallybased entrepreneurial activities.
- Open Access
- 13 April 2023
- Published by Indonesian Muslim University in Journal of Industrial Engineering Management
- Vol. 8 (1) , 69-78
INCREASING THE PRODUCTIVITY OF THE FURNITURE INDUSTRY WITH KAIZEN CASE STUDY IN SBRC FURNITURE JEPARA
In the era of economic digitalization, global business and industry competition is very tight and moves fast. Fashion, trends, and innovations are growing vigorously so that all business and industry players continue to increase their productivity in all fields. The increase in productivity is in line with the company's efforts to increase profits along with optimal product and service quality to consumers. However, efforts to increase it will be hampered by several aspects of waste, this is what is felt by small and medium business actors such as SBRC Furniture which is engaged in the production of carving frames. This research aims to identify various wastes that occur by changing them through the Kaizen method to provide constructive notes to increase business productivity.
- 13 April 2023
- Published by Indonesian Muslim University in Journal of Industrial Engineering Management
- Vol. 8 (1) , 69-78
Open AccessINCREASING THE PRODUCTIVITY OF THE FURNITURE INDUSTRY WITH KAIZEN CASE STUDY IN SBRC FURNITURE JEPARA
In the era of economic digitalization, global business and industry competition is very tight and moves fast. Fashion, trends, and innovations are growing vigorously so that all business and industry players continue to increase their productivity in all fields. The increase in productivity is in line with the company's efforts to increase profits along with optimal product and service quality to consumers. However, efforts to increase it will be hampered by several aspects of waste, this is what is felt by small and medium business actors such as SBRC Furniture which is engaged in the production of carving frames. This research aims to identify various wastes that occur by changing them through the Kaizen method to provide constructive notes to increase business productivity.
- Open Access
- 16 January 2023
- Published by Universitas Muhammadiyah Sidoarjo in PROZIMA (Productivity, Optimization and Manufacturing System Engineering)
- Vol. 6 (2) , 137-142
Rearranging First-In First-Out (FIFO) Parts Layouts
Surabaya locomotive warehouse is one part of the company PT. Kereta Api Indonesia (Persero) as a place to store spare parts for repair and maintenance purposes, especially locomotives. The implementation of these inspections and repairs, of course, requires spare parts to facilitate the maintenance process which generally spare parts are placed in storage or warehouses. The problem in the Surabaya locomotive warehouse is that the arrangement of spare parts for bin boxes for each type of group is not always fixed so that the search becomes a bit hampered. This study aims to review the repair of bin box spare parts placement on a regular basis by using the First-In First-Out (FIFO) approach to sort bin box spare parts based on their movement flow. Based on the results of the analysis, the classification of bin boxes in each type of spare parts rack group based on the flow of movement in sequence is fast moving, medium moving, and slow moving. In the fast moving spare parts bin boxes are placed on the bottom row of shelves, bin boxes that have medium moving spare parts are placed on the second and third rows of shelves. Meanwhile, bin boxes that have slow-moving spare parts will be placed on the top shelf. After classifying the spare parts in the bin box, an addressing area is made on each row of the rack to determine the location of the spare part position.
- 16 January 2023
- Published by Universitas Muhammadiyah Sidoarjo in PROZIMA (Productivity, Optimization and Manufacturing System Engineering)
- Vol. 6 (2) , 137-142
Open AccessRearranging First-In First-Out (FIFO) Parts Layouts
Surabaya locomotive warehouse is one part of the company PT. Kereta Api Indonesia (Persero) as a place to store spare parts for repair and maintenance purposes, especially locomotives. The implementation of these inspections and repairs, of course, requires spare parts to facilitate the maintenance process which generally spare parts are placed in storage or warehouses. The problem in the Surabaya locomotive warehouse is that the arrangement of spare parts for bin boxes for each type of group is not always fixed so that the search becomes a bit hampered. This study aims to review the repair of bin box spare parts placement on a regular basis by using the First-In First-Out (FIFO) approach to sort bin box spare parts based on their movement flow. Based on the results of the analysis, the classification of bin boxes in each type of spare parts rack group based on the flow of movement in sequence is fast moving, medium moving, and slow moving. In the fast moving spare parts bin boxes are placed on the bottom row of shelves, bin boxes that have medium moving spare parts are placed on the second and third rows of shelves. Meanwhile, bin boxes that have slow-moving spare parts will be placed on the top shelf. After classifying the spare parts in the bin box, an addressing area is made on each row of the rack to determine the location of the spare part position.