GHGina Cynthia R Hasibuan

Gina Cynthia R Hasibuan

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Gina Cynthia R Hasibuan has a total of 6 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Pemilihan Lokasi TPA Regional untuk Kota Medan dan Kabupaten Deli Serdang

    by Muhammad David Hablum, Ahmad Perwira Mulia, Gina Cynthia R Hasibuan

    The increase in the rate of development, population growth, and socio-economic activities has triggered an increase in waste generation, which is increasingly complex with conventional waste management that relies on collection, transportation, and disposal. This study aims to find a solution through three main stages: identification of waste conditions, preparation of a decision support system using the AHP Method, and analysis of the area with GIS application. The results of the study show that Limau Mungkur Village, STIM Hilir District, is considered the most appropriate location in the study area. Based on these results, the concept of selecting the criteria of Land Use, Hydrology, Groundwater Level Depth, Flood-prone Area, Settlement Distance, Zone Slope, Geology and Airport Distance became a determinant in the selection of location alternatives.

  • Open Access

    Analisis Daya Dukung & Penurunan Bored Pile 80cm di Proyek Kompleks Kantor-Apartemen dengan Metode Analitis & Elemen Hingga

    by Gusar Tampubolon, Roesyanto Roesyanto, Gina Cynthia R Hasibuan

    This study will look for the ultimate bearing capacity value of bored pile foundation and foundation subsidence, based on SPT data and loading test calculated empirically with SPT data using equations provided by O'Neil and Reese while loading test data using curve interpretation Davidson Method, Mazurkiewich Method, Chin Method and finite element method using 2D Plaxis software with all types of medium mesh. After analysis, the ultimate bored pile carrying capacity value of ø 80 cm based on SPT data using the O'neill and Reese equations was 1242 tons, then analysis using the Davisson method of 875 tons, using the Mazurkiewiech method of 960 tons and the Chin method of 876 tons. While the ultimate carrying capacity based on PLAXIS 2D calculations is 1364 tons. 5. Based on SPT data, the carrying capacity of a single bored pile axial permit (Qi) was obtained at 497 tons with SF = 2.5. And for the value of the decrease that occurs in the bored pile foundation based on analytical results is 22.85 mm, based on the loading test is 7.95 mm and based on the PLAXIS 2D program is 14.12 mm. Based on the results of the analysis, it can be concluded that the O'Neil and Reese equations provide a greater value than the interpretation of load testing so that it will provide a large safety value if used when design and descent analysis that is closest to the results in the field is analysis with 2D PLAXIS with the Mohr-Coulomb modeling type. There are differences in carrying and lowering capacity analysis results with several methods used, but the use of analytical methods and finite element methods with PLAXIS 2D meets the safety requirements of bored pile foundations.


  • Open Access

    Analisis Optimasi Penjadwalan dengan Metode Precedence Diagram Method pada Proyek Konstruksi Pembangunan Rumah Sakit Regina Maris Medan

    by Muhammad Rizky, Ahmad Perwira Mulia Tarigan, Gina Cynthia R Hasibuan

    Good project management in the process of implementing private residential buildings, private buildings, and infrastructure buildings intended for the public interest, is one of the factors for the progress of a country. The study focused on the construction of the Regina Maris hospital in Medan, which is one of the developments in the complex category. The purpose of this study is to provide the results of an analysis of the development in order to achieve goals or targets that can provide efficient use of time, cost and quality which are considered to be the main supporting factors in a development.The research was carried out with three main activity stages, namely the identification stage, the data compilation stage and problem analysis and the use of the Precedence Diagram Method (PDM) method to analyze the optimization of work implementation schedules. The identification stage was carried out in the study area, beginning with observing the condition of the construction implementation, and deepening the identification of environmental conditions or internal/external factors that could hinder work. The results of the identification stage, accompanied by identification of problems and factors that can hinder work, are then used as initial data from the preparation stage of optimizing work implementation schedules using the Precedence Diagram Method

  • Open Access

    Analisis Kelayakan Investasi Pengembangan Sistem Penyediaan Air Minum IKK Patumbak di Kabupaten Deli Serdang (Studi Kasus)

    by Tania Nazria Purba, Ahmad Perwira Mulia Tarigan, Gina Cyntia R. Hasibuan

    This study is motivated by the actual conditions for the drinking water supply system in Patumbak District which has been served by PDAM Tirta Deli as the manager of drinking water in Deli Serdang Regency, and partially served by PDAM Tirtanadi, but the service coverage is still low at 30.33%. The purpose of this research is to study the Feasibility of Economic and Financial Investment in the development of drinking water supply systems. The data processing technique in this study is to use a monte carlo simulation technique. This Monte Carlo simulation is run through an application program, namely the R Studio program which will estimate the profit of a SPAM company for the next 20 years.. Based on the results of calculations and analysis, it can be concluded that from the analysis of economic and financial aspects the results are: NPV IDR 12,659,105,099 (> 0), IRR 14.58% (> 12%), Net B/C Ratio 2.796 (> 1). Results The average NPV value based on the Monte Carlo simulation results with R Studio is IDR 1,060,115,259 and from the analysis of the financial aspects the results are: The NPV value is IDR 25,994,551 (> 0), IRR 9.48 % (> 9.20 %) , Net B/C Ratio 1.03 (> 1), PP 9th year, BEP 0. So it can be concluded that SPAM Development Investment IKK Patumbak in Deli Serdang Regency is said to be FEATURED economically and financially.